roofy

Violations at 217-02 75 Avenue

Queens, NY 11364 · BBL 4-07754-0003 · Back to the property

HPD housing violations

29 HPD violations, newest first.

  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1stflo, 1st story, 1st apartment from west at north

    May 18, 2024 · Apt 1STFLO

    Open — Invalid certification
  • ANon-hazardous

    Properly secure the loose outlet plate at the north wall in the 1st room from north located at apt 2, 2nd story, 2nd apartment from east at south

    Jan 21, 2022 · Apt 2

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at east wall near window in the 2nd room from north at east located at apt 2, 2nd story, 2nd apartment from east at south

    Jan 21, 2022 · Apt 2

    Open — Nov sent out
  • BHazardous

    Replace the broken or defective radiator in the 2nd room from north at east located at apt 2, 2nd story, 2nd apartment from east at south

    Jan 21, 2022 · Apt 2

    Open — Invalid certification
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and soith wall in the bathroom located at apt 2, 2nd story, 2nd apartment from east at south

    Jan 21, 2022 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 2nd apartment from east at south

    Jan 21, 2022 · Apt 2

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective porcelain glaze enamel at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Oct 18, 2021 · Apt 1

    Open — Nov sent out
  • BHazardous

    Cleanse and disinfect to the satisfaction of this department after removing the odor, dirt stains and filth around all the walls and floor in the entire apartment located at apt 1stfl, 1st story, 1st apartment from south at west

    Aug 24, 2021 · Apt 1STFL

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1stfl, 1st story, 1st apartment from south at west

    Aug 24, 2021 · Apt 1STFL

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west

    Aug 24, 2021 · Apt 1STFL

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the entire apartment located at apt 1stfl, 1st story, 1st apartment from south at west

    Aug 24, 2021 · Apt 1STFL

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of hot water exceeding 130 degree in the kitchen and bathroom in the entire apartment located at apt 2fl, 2nd story, apartment at south

    Jan 16, 2018 · Apt 2FL

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2fl, 2nd story, apartment at south

    Jan 16, 2018 · Apt 2FL

    Closed — Violation closed
  • ANon-hazardous

    Properly repair with similar material the broken or defective north portion of wood floor (approximately 2 square feet at the radiator) in the 1st room from north at east located at apt 1, 1st story, apartment at east

    May 25, 2016 · Apt 1

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the south wall, north wall and ceiling in the 1st room from north at east located at apt 1, 1st story, apartment at east

    May 25, 2016 · Apt 1

    Closed — Violation closed
  • ANon-hazardous

    Properly repair with similar material the broken or defective southwest portion of wooden floor (approximately 2 square feet) in the kitchen located at apt 1, 1st story, apartment at east

    May 25, 2016 · Apt 1

    Closed — Violation dismissed
  • BHazardous

    Abate the nuisance consisting of mice located at apt 1, 1st story, apartment at east

    May 25, 2016 · Apt 1

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace with new the broken or defective all rotted and collapsing wooden cabinets at south wall in the kitchen located at apt 1, 1st story, apartment at east

    May 25, 2016 · Apt 1

    Closed — Violation closed
  • CImmediately hazardous

    Abate the nuisance consisting of scalding hot water 148f causing potential damage, thermometer # 6695 in the entire apartment located at apt 1fl, 1st story, apartment at west

    Jan 10, 2016 · Apt 1FL

    Closed — Violation dismissed
  • ANon-hazardous

    Refit door at wall cabinet at south wall in the kitchen located at apt 1fl, 1st story

    Dec 13, 2015 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... eastwall in the kitchen located at apt flr1, 1st story

    Jan 24, 2014 · Apt FLR1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the kitchen located at apt flr1, 1st story

    Jan 24, 2014 · Apt FLR1

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of water leaks walls and ceiling in the kitchen located at apt flr1, 1st story

    Jan 24, 2014 · Apt FLR1

    Closed — Violation closed
  • ANon-hazardous

    Refit window frame in the bathroom located at apt 1, 1st story

    Sep 13, 2006 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Refit window frame in the 2nd bedroom 2 from north at east located at apt 1, 1st story

    Sep 13, 2006 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Refit window frame in the 2nd bedroom from north located at apt 1, 1st story

    Sep 13, 2006 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Properly repair the broken or defective cabinet base at sink (bldg 220-76 75 ave) in the kitchen located at apt 1, 1st story

    Apr 2, 2005 · Apt 1

    Open — Nov sent out
  • BHazardous

    M/d law abate the nuisance consisting of dampness on west wall in the bathroom located at apt 1fl, 1st story

    Sep 5, 2003 · Apt 1FL

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures at kitchen sink / bathroom washbasin. in the entire apartment located at apt 1 f, 1st story

    Jan 24, 2001 · Apt 1 F

    Open — Nov sent out

DOB building violations

28 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2015

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    Jul 22, 1994

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    Aug 8, 1984

    Dob violation - dismissed

ECB violations

4 ECB violations, newest first.

  • Class - 2

    Work without a permit. noted: at time of inspection observed at exposure 1 the construction of a wooden handicapped ramp approx 20' long and 2' high. work is 100% complete. no permit was issued. remedy: obtain

    Jul 10, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain the property: defects noted: as per bsa car no. 418-50bz the landscaped appearance from the driveway attached to 75-41 217 st. up to 100'width towards south (along rear of bldgs on 77 ave)

    Feb 25, 2016

    Resolve
  • Class - 2

    Failure to comply with permits,variances,authorizations or certifications.note:bsa cal no. 418-50 bz indicates that 100 feet depth from rearlot line of adjacent properties along 77th ave. from 217th st. to spri

    Oct 27, 2015

    Resolve
  • Class - 2

    Failure to maintain building wall or appurtenance.noted:at rear of building attached garages with garage #5108 has deterioration of mortar &@ rear of garage large vertical crack and step cracking has occurred

    Jun 12, 2015 · Penalty $530

    Resolve