Violations at 73-11 Bell Boulevard
Queens, NY 11364 · BBL 4-07738-0001 · Back to the property
HPD housing violations
The newest 50 of 129 HPD violations. The city keeps the complete history.
- BHazardous
Properly repair or replace the broken or defective latch set at door at compactor closet, 6th story
Oct 17, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 6th story
Oct 17, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5a, 5th story, 2nd apartment from south at west
Oct 9, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5a, 5th story, 2nd apartment from south at west
Oct 9, 2026 · Apt 5A
Open — Civ14 mailed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 28, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 3rd apartment from south at west
Sep 28, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door lock at cellar at boiler room
Sep 28, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6b, 6th story, 3rd apartment from south at west
Sep 28, 2026 · Apt 6B
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at building entrance door at public hall, 1st story
Aug 12, 2026
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2b, 2nd story, 3rd apartment from south at west
Aug 12, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system at east wall in the foyer located at apt 2b, 2nd story, 3rd apartment from south at west
Aug 12, 2026 · Apt 2B
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement at boiler room
Aug 12, 2026
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 3rd apartment from south at west
Aug 12, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department bulkhead stairs at ceiling at public hall, 6th story
May 19, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant material at bulkhead stairs ceiling at public hall, 6th story
May 19, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 1st story
Apr 10, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 3rd room from east at south, the bathroom , the 3rd room from east at north, the foyer located at apt 4a, 4th story, 2nd apartment from south at west
Nov 19, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Refit entrance door in the bathroom located at apt 4a, 4th story, 2nd apartment from south at west
Nov 19, 2025 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet at the ceiling in the bathroom located at apt 4a, 4th story, 2nd apartment from south at west
Nov 19, 2025 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 13, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
May 13, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 13, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 13, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor . frame missing at wall at public hall, 1st story
May 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at hopper door at compactor closet, 1st story
May 13, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch assembly at door at compactor closet, 1st story
May 2, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 1st story
May 2, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch assembly at door at compactor closet, 2nd story
May 2, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 2nd story
May 2, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2n, 2nd story, 3rd apartment from south at west
May 2, 2025 · Apt 2N
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from north at west located at apt 2n, 2nd story, 3rd apartment from south at west
May 2, 2025 · Apt 2N
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30sq feet west wall and north wall in the 1st room from north at west located at apt 2n, 2nd story, 3rd apartment from south at west
May 2, 2025 · Apt 2N
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch assembly at door at compactor closet, 1st story
Apr 25, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 1st story
Apr 25, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 25, 2025
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective latch assembly at door at compactor closet, 5th story
Apr 25, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 5th story
Apr 25, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch assembly at door at compactor closet, 5th story
Feb 7, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 5th story
Feb 7, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet door at public hall, 1st story
Sep 28, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at compactor closet door at public hall, 1st story
Sep 28, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete sill at east 2 window in the 4th room from east located at apt 4d, 4th story, 1st apartment from north at east
Sep 28, 2024 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen located at apt 4d, 4th story, 1st apartment from north at east
Sep 28, 2024 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak east wall in the kitchen located at apt 4d, 4th story, 1st apartment from north at east
Sep 28, 2024 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete window sill at east 2 window in the 4th room from north located at apt 4d, 4th story, 1st apartment from north at east
May 29, 2024 · Apt 4D
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east and south walls in the kitchen located at apt 4d, 4th story, 1st apartment from north at east
May 29, 2024 · Apt 4D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak east and south wall in the kitchen located at apt 4d, 4th story, 1st apartment from north at east
May 29, 2024 · Apt 4D
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house jold items at public hall, 6th story
May 16, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch compactor closet door at public hall, 1st story
May 16, 2024
Closed — Violation dismissed
DOB building violations
The newest 50 of 60 DOB violations. The city keeps the complete history.
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 7, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 7, 2017
Dob violation - resolved - Construction other optional
C-construction other optional
Jan 27, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2012
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2001
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations
27 ECB violations, newest first.
- Class - 1
3314.15.2 partial stop work order for suspended scaffold issued pursuant to 28-207.2 & posted @ premises the stirrups @ suspended scaffold shall be placed atleast 6" but no more than 18" from the end @ the plat
Jun 27, 2014 · Penalty $1,600
Resolve - Class - 2
Work does not comform to approved const documents &/or sidewalk shed have been erected @ exp #3;#4 under permit #440137120-01-eq-sh sws @ exp #4 not shown on approved sws plan.rem:conform shed to approved plan
Jun 27, 2014
Resolve - Class - 1
3314.15.2 partial stop work order for suspended scaffold-issued pursuant to 28-207.2 & posted @ premises the stirrups @ suspended scaffold shall be placed atleast 6" but no more than 18" from the end @ the plat
Jun 27, 2014 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved const documents &/or approved amendments note:sidewalk shed have been erected @ exp #2;3 under permit #440137086-01-eq-sh sws @ exp #2 and #3 (a corner @ the bldg not shown on
Jun 27, 2014
Resolve - Class - 2
08v01 03m07. 03m07-provide 24 hrs emergency outside communication for elevator.
May 20, 2011 · Penalty $500
Resolve - Class - 2
10h11 08v01 100b11 56y02 100b-replace toe guard to 21" as per appendixk3
Sep 17, 2010
Resolve - Class - 2
08v01 32h10 100b11 100b-replace toe guard to 21" as per appendix k3
Sep 17, 2010
Resolve - Class - 2
60/x/10,77/b/11,70/o/02,56/y/13,08/v01/77-b-11-replace toe guard as oer k-3
Sep 17, 2010
Resolve - Class - 2
77/b/11,32/h/10,08/v/01/77/b/11-replace toe guard as per k-3
Sep 17, 2010
Resolve - Class - 2
77b07. 77b- provide proper size toe guard
Jul 28, 2010 · Penalty $2,500
Resolve - Class - 2
53h14,42g11,72m07,71l10.
Jan 20, 2010 · Penalty $250
Resolve - Class - 2
52h11,53h11,60x10,08v01,72m07,71d06,70m07,38i11,10b10.70m07-cover fromjump pump missing - provide. 10b10-lower gibs into saddle.
Jan 20, 2010 · Penalty $250
Resolve - Class - 2
44h08,08v01,21d06,72m07.21d06 - interlock keeper unsecured.
Jan 20, 2010 · Penalty $250
Resolve - Class - 2
59h11,72m07. 59h11-brake pads worn - replace pads.
Jan 20, 2010 · Penalty $250
Resolve - Non-hazardous
10d06,10b01. 10-car door bracket & gib assembly loose -secure adjust gib into car sill as per code.
Jun 3, 2008 · Penalty $2,500
Resolve - Non-hazardous
73o 08v 50y
Mar 19, 1999
Resolve - Non-hazardous
73o 08v 50y
Mar 19, 1999
Resolve - Non-hazardous
73o,
Jan 9, 1998
Resolve - Non-hazardous
73o,
Jan 9, 1998
Resolve - Non-hazardous
73o,
Jan 9, 1998
Resolve - Non-hazardous
08j,35i,57o,74i.08-adjust floor stops 35-repair mr door 57-clean the pit 74-replace ex4 pan guard.
Dec 27, 1996 · Penalty $100
Resolve - Non-hazardous
35p,57o,74o,74i.740-clean top of car 74-i replace broken light blib on top of car.
Dec 27, 1996 · Penalty $100
Resolve - Non-hazardous
15b,35p,74b,. 15 adjust door check 4th floor 35 provide access to machine rm. 74- adjust tak off.
Dec 27, 1996 · Penalty $100
Resolve - Non-hazardous
09m,15t,28h,10p,20p,36d,36k,55l,57o,62d,11d,35m,(15)mark all doors as to floors (10&20)restore to full service from car&hall bsmt buttons toservice bsmt landing (36)keylock resecure (30)rusted out mr door (55)l
Feb 19, 1991
Resolve - Non-hazardous
09m,15t,11d,36d,55d,55l,57b,57o,10p,20p,35m,(15)mark all doors as to floors (11)properly secure to car top all electric boxes&greenfiel for cab lights (36)resecure door keylock (55)resecure pipe to wall&repalce
Feb 19, 1991
Resolve - Non-hazardous
19m07,15t07,25d06,30002,03l11,46l12,47y12,57002. (15) mark all floors on hoist way doors (25) in close all wire to motor & adjust operator mnot to slam can door closed. (03) repair on car top safety hand rail
Dec 19, 1990 · Penalty $75
Resolve - Non-hazardous
09m07,15t07,36l11,53l11,53r09,55l11,57002. (15) mark all floors on hoist way doors (36) repair lock to work with key (53) replace broken light fixture switch (53) remove from mr. ac light feed line completel
Dec 19, 1990 · Penalty $75
Resolve