roofy

Violations at 73-36 Bell Boulevard

Queens, NY 11364 · BBL 4-07732-0050 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

45 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 8, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 23, 2018

    Dob violation - resolved
  • High pressure boiler boiler required

    Violation issued for failure to file 2016 annual high pressure boiler inspection

    Jun 22, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 29, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2014

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 29, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2012

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 31, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 9, 2010

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 27, 2009

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 21, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 26, 2007

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 19, 2006

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 13, 2006

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Oct 1, 2005

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 20, 2004

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 29, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 23, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 23, 2003

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 7, 2001

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 8, 2001

    Dob violation - dismissed
  • Elevator elevatorrequired

    4p5525

    Oct 26, 2000

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boiler boiler optional

    B-boiler boiler optional

    Jun 17, 1992

    Vp*-violation unserved ecb- dismissed
  • Boiler boiler optional

    18b

    Sep 7, 1989

    Vp-violation unserved ecb-active

ECB violations

29 ECB violations, newest first.

  • Class - 1

    Failure to provide unobstructed exit passageway. note: at time of inspection, observed egress door being hazardously, completely blocked with numerous chairs and a table at educational establishment-top prep tu

    Mar 16, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. note: at time of inspection, observed metal cover of hvac duct hanging on the ceiling in classroom # 2 at educational establishment at this location., repa

    Mar 16, 2023

    Resolve
  • Class - 2

    97x10,42g11. (67x)repair emergency phone. (42g)improper fuses on the controller.

    Mar 13, 2017 · Penalty $250

    Resolve
  • Class - 2

    Exit door not self closing.noted:at "infant"room and at "pre-k"rm emergency exit doors not self closing.rem:comply with code.

    Nov 30, 2016 · Penalty $250

    Resolve
  • Class - 2

    Work does not conform to approved construciton documents & or approvedamendments. premises under p.c. alt-2 421023305 loc folder permit exp 2-28-15. note: cellar plans indicate a large partitioned of space alon

    Dec 14, 2015 · Penalty $500

    Active
  • Class - 2

    Occupancy contrary to that allowed by the c of o or bldg dept records.note: at time of inspection found cellar level area approx 80'x30' partitioned off w/full height walls creating offices. multiple offices w/

    Dec 14, 2015 · Penalty $1,200

    Active
  • Class - 2

    Failure to comply w/the conn'nrs order to file a cert.of correction w/the dob for nov 35067650x issued on 11/9/13 pursuant to 28-204.4 & 1rcny 102-01.permit exp. 4/28/13 #420581962 a2.remedy:file a cert.of corr

    Jun 30, 2014 · Penalty $830

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order. noted:swo #021605c11jg02 was issued for failure to provide approved plans onconstruction site. at time of inspection: 1) job was 100% completed

    Nov 4, 2013 · Penalty $4,800

    Resolve
  • Class - 3

    Work does not conform to approved construction documents/amendments.job #402041964 dated 2/20/2009.noted:cooking equipment in bakery not shown on plan.rem:conform to approved construction documents.

    Jul 18, 2013 · Penalty $230

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans at job site at time of inspection for application #42058196z. rem:provide approved plans then call to schedule field inspections 718-286-0683.

    Jul 23, 2012 · Penalty $250

    Resolve
  • Class - 2

    Sec. 28-116.2.4.2;rcny 101-10. failed to perform a final inspection for completed work w/i one year of permit expiration application #402079727 - expired (6.1.05). associated technical reports not signed off;

    Apr 1, 2009 · Penalty $800

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. for alt 2 job #402041964 (4.1.05) permit expired (8.26.05). noted: at 1st fl 1) at easterly rear interior between conveyor &

    Jan 20, 2009

    Resolve
  • Class - 3

    18ab fulton vt boiler 15hp,nb82367,oil 1998 18ab scale accumulation corrosion & evidence of leakage @ upper & lower handholes.remove scale deposits,clean handhole (ports),flush boiler & re-gasket openings for

    Oct 25, 2008 · Penalty $100

    Resolve
  • Class - 1

    Sec. 27-162 inadequate plans alt 2 #410018886 prof-cert. front entry door(alcove)req. handicapped entrance to have(flanker)panel minimum 18"wide for wheel chair,found 12" flanker panel. front siamese connection

    Oct 11, 2008 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain bldg walls or appurtenances in that rear wall has areas of cracked and displaced bricks. remedy- maintain exterior bldg wall.

    Oct 9, 2008 · Penalty $250

    Resolve
  • Class - 2

    Altered/changed bldg occupied w/o a vallid certificate of occupancy as per 28-118.31, 28-118.3.2 job#402626752 has not been signed off the store is open & conducting business remedy obtain valid c of o or disco

    Jun 30, 2008

    Resolve
  • Non-hazardous

    10d06.17d06.21h11.84x10. 21 lobby mo rollers worn 84 emergency 2 way phone inoperative

    Apr 29, 2008 · Penalty $350

    Resolve
  • Non-hazardous

    Failure to file c of c with the dob for nov 34469379n as issued on 2/16/05 remedy: file c of c

    Apr 21, 2008 · Penalty $500

    Resolve
  • Non-hazardous

    Plans dated 4/16/08 work does not conform to approved plans noted premises (mamas home) altered via procert job 410018886 is requesting sign off via loc dated 4/15/08 denied non conforming work lettered awning

    Apr 21, 2008 · Penalty $130

    Resolve
  • Non-hazardous

    Work w/o permit work noted 1st sty bldg occupied by liquor store cut a hole approx 3wx5d at the middle area of fl by cutting existing metal deck concrete fl for installation of stair (wooden) to the cellar for

    Apr 8, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    36,50-fucton v.t. boiler 10hp,nb879992,oil,2001.36)referenced high pr essure steam boiler is not registered on the dept of bldg boiler divison data base. respondent must obtain an installation permit & produce

    Feb 6, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    Work does not conform to approved plans non-conforming work noted: basement: demolition of 21 inch foundation wall app 3'-0 x 4'-0 x 21"f demolition of foundation wall for conveyor app (3x4) 1st floor- channels

    Feb 18, 2005 · Penalty $130

    Resolve
  • Non-hazardous

    Failure to provide approved plan at premises at time of inspection-permit #402041964 no structural dwgs on site.remedy:stop all work-make safe provide plans.

    Feb 16, 2005 · Penalty $130

    Resolve
  • Non-hazardous

    16-submit proof of registration and valid permits for this boiler fulton nb 82367 year 1998 2- operating boiler without equipment use permit.

    Aug 31, 2001 · Penalty $350

    Active
  • Hazardous

    Failure to provide at least two means of egress from space at the rearof the office remedy provide required means of egress.

    Nov 1, 1999

    Resolve
  • Non-hazardous

    73o2,8v1,53l11,74##. -74 repair outside telephone in cab-

    Mar 17, 1999 · Penalty $2,500

    Resolve
  • Non-hazardous

    36 installed boiler without permits & operated without equipment uses permit

    Dec 29, 1998

    Resolve
  • Non-hazardous

    36,

    Jun 17, 1992

    Resolve
  • Non-hazardous

    22d,25b,35l,35r,55q,(25)car door opens to far back (35)repair all holes in mr walls (35)remove all now elevator storage

    Feb 6, 1991 · Penalty $1,000

    Resolve