roofy

Violations at 224-01 69 Avenue

Queens, NY 11364 · BBL 4-07672-0002 · Back to the property

HPD housing violations

44 HPD violations, newest first.

  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt a, 1st story, 1st apartment from south at west

    Nov 5, 2025 · Apt A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at all walls in the 4th room from north located at apt b, 2nd story, 1st apartment from north at east

    Sep 12, 2025 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective lower sash window spring balance at east wall in the 4th room from north located at apt b, 2nd story, 1st apartment from north at east

    Sep 12, 2025 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective lower sash window spring balance at east wall in the kitchen located at apt b, 2nd story, 1st apartment from north at east

    Sep 12, 2025 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective lower sash window spring balance at east wall in the 1st room from north at east located at apt b, 2nd story, 1st apartment from north at east

    Sep 12, 2025 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective lower sash spring balance at west window in the 3rd room from north at west located at apt b, 2nd story, 1st apartment from north at east

    Sep 12, 2025 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at north and east wall in the 1st room from north at east located at apt b, 2nd story, 1st apartment from north at east

    Sep 12, 2025 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt b, 2nd story, 1st apartment from north at east

    Sep 12, 2025 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at east, north, and west walls in the bathroom located at apt b, 2nd story, 1st apartment from north at east

    Sep 12, 2025 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective floor tiles in the kitchen located at apt 67-83, 2nd story, 1st apartment from south at west

    Sep 3, 2024 · Apt 67-83

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... greater than 10sq ft at ceiling in the bathroom located at apt 67-83, 2nd story, 1st apartment from south at west

    Sep 3, 2024 · Apt 67-83

    Closed — Violation dismissed
  • BHazardous

    Abate the infestation consisting of vermin evidence of ants at foyer in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jul 16, 2023 · Apt 1

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing. in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 8, 2022 · Apt 2B

    Closed — Violation dismissed
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 8, 2022 · Apt 2B

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceilings and walls in the entire apartment located at apt b, 2nd story

    Feb 26, 2020 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt b, 2nd story

    May 11, 2019 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the 1st room from north at west located at apt b, 2nd story

    May 11, 2019 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north at west located at apt b, 2nd story

    May 11, 2019 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at south located at apt a, 1st story, 1st apartment from south at west

    Nov 9, 2018 · Apt A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and west wall in the bathroom located at apt a, 1st story, 1st apartment from south at west

    Nov 9, 2018 · Apt A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at north located at apt a, 1st story, 1st apartment from south at west

    Nov 9, 2018 · Apt A

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a, 1st story, 1st apartment from south at west

    Oct 17, 2018 · Apt A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and west wall in the bathroom located at apt a, 1st story, 1st apartment from south at west

    Oct 17, 2018 · Apt A

    Closed — Violation closed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 11, 2017

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jun 10, 2017

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color walls in the 2nd room from north at east located at apt a, 1st story

    Jun 10, 2017 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective wooden floor in the 2nd room from north at east located at apt a, 1st story

    Jun 10, 2017 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt a, 1st story, 1st apartment from east at south

    May 22, 2017 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and all walls in the bathroom located at apt a, 1st story, 1st apartment from east at south

    May 22, 2017 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 4th room from east at south located at apt a, 1st story, 1st apartment from east at south

    May 22, 2017 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective electric outlet at west wall in the 1st room from east at south located at apt a, 1st story, 1st apartment from east at south

    May 22, 2017 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective electric switch at west wall in the 1st room from east at south located at apt a, 1st story, 1st apartment from east at south

    May 22, 2017 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at west wall in the 1st room from east at south located at apt a, 1st story, 1st apartment from east at south

    May 22, 2017 · Apt A

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt a, 1st story

    Feb 20, 2017 · Apt A

    Closed — Violation closed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt b, 2nd story

    Jan 18, 2016 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Abate the nuisance consisting of vermin fleas (aka 67-22b cloverdale bloulevard) in the entire apartment located at apt na, 1st story

    Sep 15, 2009 · Apt NA

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color north wall in the 1st room from north located at apt a, 1st story, section ''224-26 67a''

    Nov 1, 2007 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the bathroom located at apt a, 1st story

    Feb 26, 2007 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color walls & ceiling ( aka 67-07 224 street ) in the bathroom located at apt a, 1st story

    Feb 26, 2007 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt a, 1st story

    Mar 13, 2006 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt a, 1st story

    Mar 13, 2006 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Abate the nuisance consisting of concealed water leak at ceiling in the bathroom located at apt a, 1st story

    Mar 13, 2006 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color walls & ceiling in the 1st room from north located at apt a, 1st story

    Mar 13, 2006 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Abate the nuisance consisting of concealed water leak at ceiling in the 1st room from north located at apt a, 1st story

    Mar 13, 2006 · Apt A

    Closed — Violation dismissed

DOB building violations

34 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 17, 2019

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 10, 1992

    Vpw*-violation unserved ecb-work without permit-dismissed

ECB violations

2 ECB violations, newest first.

  • Class - 3

    Electrical work without a permit. throughout first floor apartment removal of all electrical apparatus and installation of new branch wiringoutlets and switches. remedy: obtain permit

    Jul 26, 2021 · Penalty $400

    Resolve
  • Non-hazardous

    Work without a permit-work done constructed an opening through masonryparty wall in attic. approx. size 2'x2' 6". remedy-obtain a permit if feasible or return to prior legal condition.

    Sep 10, 1992

    Resolve