Violations at 222-01 69 Avenue
Queens, NY 11364 · BBL 4-07668-0010 · Back to the property
HPD housing violations
20 HPD violations, newest first.
- BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt b, 2nd story, 1st apartment from north at east
Jun 27, 2025 · Apt B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance window lower sash at west wall in the 2nd room from north located at apt b, 2nd story, 2nd apartment from north at east
May 30, 2025 · Apt B
Open — Invalid certification - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt b, 2nd story, 1st apartment from north at east
Oct 19, 2023 · Apt B
Closed — Violation dismissed - BHazardous
Repair or replace smoke detector defective in the entire apartment located at apt b, 2nd story, 1st apartment from north at east
Oct 19, 2023 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal door frome at front entrance to building , 1st story
May 18, 2013
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall in the kitchen located at apt b, 2nd story
May 18, 2013 · Apt B
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the 1st room from north located at apt b, 2nd story
May 18, 2013 · Apt B
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling, south & west walls in the 1st room from east at south located at apt b, 2nd story
May 18, 2013 · Apt B
Open — Invalid certification - BHazardous
Properly secure the loose saddle at entrance door to bldg. at public hall, 1st story
May 11, 2013
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective metal jam west side at entrance door to bldg. at public hall, 1st story
May 11, 2013
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective regrout wall tiles in bathtub in the bathroom located at apt 2fl, 2nd story
Jul 8, 2009 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood molding at west wall stairs in the private hallway located at apt 2fl, 2nd story
Jul 8, 2009 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall in the kitchen located at apt 2fl, 2nd story
Jul 8, 2009 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall, around north and west window frames in the 1st room from north located at apt 2fl, 2nd story
Jul 8, 2009 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Refit wood door at entrance at public hall, 1st story
Jul 8, 2009
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 2fl, 2nd story
Jul 8, 2009 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective reglaze bathtub in the bathroom located at apt 2fl, 2nd story
Jul 8, 2009 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the entire apartment located at apt 2fl, 2nd story
Jul 8, 2009 · Apt 2FL
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors (67-92 223 pl) in the entrance located at apt b, 2nd story
Mar 26, 2009 · Apt B
Closed — Violation closed - ANon-hazardous
Refit door (67-92 223 pl) in the entrance located at apt b, 2nd story
Mar 26, 2009 · Apt B
Closed — Violation closed
DOB building violations
2 DOB violations, newest first.
- Construction other optional
Garbage truck struck a wood frame and masonry garages at rear displaci ngbrick at exposures 2 and 4 and shifting brick columns and roof causi ng structure to lean out of plumb
May 14, 2016
Dob violation - active - Construction other optional
C-construction other optional
Aug 18, 1986
Dob violation - dismissed
ECB violations
No ECB violations on record