Violations at 224-65 64 Avenue
Queens, NY 11364 · BBL 4-07660-0002 · Back to the property
HPD housing violations
The newest 50 of 59 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 29a, 1st story, 1st apartment from south at west
Nov 18, 2025 · Apt 29A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and west wall in the bathroom located at apt 29a, 1st story, 1st apartment from south at west
Nov 18, 2025 · Apt 29A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 29a, 1st story, 1st apartment from south at west
Nov 18, 2025 · Apt 29A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking of bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Sep 9, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt b, 2nd story, 1st apartment from west at north
Jun 18, 2025 · Apt B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling in the bathroom located at apt b, 2nd story, 1st apartment from west at north
Jun 18, 2025 · Apt B
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective caulking on washbasin countertop in the bathroom located at apt a, 1st story, 1st apartment from south at west
Jun 13, 2025 · Apt A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt a, 1st story, 1st apartment from south at west
Jun 13, 2025 · Apt A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color east and west walls in the bathroom located at apt a, 1st story, 1st apartment from south at west
Jun 13, 2025 · Apt A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak west wall in the bathroom located at apt a, 1st story, 1st apartment from south at west
Jun 13, 2025 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock set in the entrance located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the 1st room from north at east located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at 1st window from north at east in the 1st room from north at east located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective base moldings at west wall in the 4th room from north at west located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing lock set at entrance door in the bathroom located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective grout at ceramic wall tile at all walls in the bathroom located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the private hallway located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective upper window sash glass pane at west wall in the kitchen located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper window sash spring balance at west wall in the kitchen located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective caulking around countertop in the kitchen located at apt b, 2nd story, 1st apartment from west at north
Mar 12, 2025 · Apt B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, west wall, north wall, and east wall in the 1st room from north at west located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department window stool at north wall in the 1st room from north at east located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north at east located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing towel bar at east wall in the bathroom located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 square feet at ceiling in the bathroom located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department window stool at south wall in the 2nd room from north located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at east wall in the kitchen located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - BHazardous
Properly secure the loose wood base cabinet door at north wall in the kitchen located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the 2nd room from north located at apt 33b, 2nd story, 1st apartment from west at north
Dec 19, 2024 · Apt 33B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at north wall approximately 6 sq.ft in the 1st room from north at west located at apt a, 1st story, 1st apartment from west at north
Jul 21, 2023 · Apt A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling and around window approximately 6 sq.ft in the bathroom located at apt a, 1st story, 1st apartment from west at north
Jul 21, 2023 · Apt A
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective cabinet at south wall in the kitchen located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective formica countertop and base cabinet at sink in the kitchen located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective spring balance of lower and upper sashes of window at south wall in the 3rd room from east located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the 2nd room from east located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective spring balance of lower and upper sashes of window at north wall in the 2nd room from east located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and south wall in the 1st room from east located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective spring balance of lower and upper sashes of window at south wall in the 1st room from east located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and all walls throughout in the entire apartment located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective rubber gasket seal at refrigerator door in the kitchen located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective cabinet at west wall in the kitchen located at apt a, 1st story, 1st apartment from east at south
Jun 8, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and east wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Apr 15, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Apr 15, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Apr 15, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective entry door strike plate in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Apr 15, 2022 · Apt 1A
Closed — Violation dismissed
DOB building violations
25 DOB violations, newest first.
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2020
Jun 20, 2021
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Plumbing none
Jm
Apr 23, 1976
Dob violation - dismissed
ECB violations
2 ECB violations, newest first.
- Class - 3
Electrical work without a permit.2nd floor apartment new installation of outlets switches branch wiring and boxes throughout.rem:obtain permit.
Jul 2, 2021 · Penalty $430
Resolve - Class - 3
Electrical work without a permit.new installation of branch wiring andbox in the living room area in the first floor apartment.remedy:obtainpermit.
Jun 1, 2021 · Penalty $430
Resolve