Violations at 223-01 65 Avenue
Queens, NY 11364 · BBL 4-07658-0002 · Back to the property
HPD housing violations
50 HPD violations, newest first.
- BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt b, 1st story, 1st apartment from east at south
Apr 11, 2024 · Apt B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, north and east wall in the 4th room from north located at apt b, 1st story, 1st apartment from east at south
Apr 11, 2024 · Apt B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from north located at apt b, 1st story, 1st apartment from east at south
Apr 11, 2024 · Apt B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 1 sqft mold condition ceiling, north and east wall in the 4th room from north located at apt b, 1st story, 1st apartment from east at south
Apr 11, 2024 · Apt B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the 2nd room from east located at apt 180b, 2nd story, 2nd apartment from east at south
Sep 11, 2023 · Apt 180B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and south wall in the 1st room from east located at apt 180b, 2nd story, 2nd apartment from east at south
Sep 11, 2023 · Apt 180B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 1st room from east located at apt 180b, 2nd story, 2nd apartment from east at south
Sep 11, 2023 · Apt 180B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the private hallway located at apt 1floor, 1st story, 1st apartment from north at east
Aug 17, 2023 · Apt 1FLOOR
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 6 sq.ft at ceiling in the private hallway located at apt 1floor, 1st story, 1st apartment from north at east
Aug 17, 2023 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east at north located at apt 232b, 2nd story, 1st apartment from west at north
May 31, 2023 · Apt 232B
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a1, 1st story, 1st apartment from south at west
Apr 26, 2023 · Apt A1
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt a1, 1st story, 1st apartment from south at west
Apr 26, 2023 · Apt A1
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective entry door strike plate in the entrance located at apt 236b2f, 2nd story, 2nd apartment from west at north
Apr 15, 2022 · Apt 236B2F
Closed — Violation dismissed - BHazardous
Properly secure the loose wood railing to floor in the entrance located at apt 236b2f, 2nd story, 2nd apartment from west at north
Apr 15, 2022 · Apt 236B2F
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures ... in the bathroom located at apt 236b2f, 2nd story, 2nd apartment from west at north
Apr 15, 2022 · Apt 236B2F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at stairs landing. in the private hallway located at apt 2fl, 2nd story, 3rd apartment from west at north
Apr 8, 2022 · Apt 2FL
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 28, 2021 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west wall in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 28, 2021 · Apt 1
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 2ndflo, 2nd story
Mar 6, 2020 · Apt 2NDFLO
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 2ndflo, 2nd story
Mar 6, 2020 · Apt 2NDFLO
Closed — Violation dismissed - BHazardous
Replace with new the missing radiator in the 2nd room from east at south located at apt b, 2nd story
Sep 8, 2017 · Apt B
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective weather seal gasket at the entrans door to apartment located at apt 5b, 1st story, 3rd apartment from west at north
Nov 15, 2015 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the 2nd room from east at south located at apt 5b, 1st story, 3rd apartment from west at north
Nov 15, 2015 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective parquet wood foor at entrance to room n/e-1 in the private hallway located at apt 5b, 1st story, 3rd apartment from west at north
Nov 15, 2015 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a, 1st story
Jan 7, 2015 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt a, 1st story
Jan 7, 2015 · Apt A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt a, 1st story
Jun 30, 2014 · Apt A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling & walls in the bathroom located at apt a, 1st story
Jun 30, 2014 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a, 1st story
Dec 19, 2013 · Apt A
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... between ceramic tiles and bathtub ( aka 64-43 a ) in the bathroom located at apt 1fl, 1st story
Apr 26, 2013 · Apt 1FL
Closed — Violation closed - BHazardous
Replace with new the broken or defective light fixture at exterior wall at entrance to building ( aka 61-35 233 place )
Oct 31, 2009
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of exposed electrical wire at exterior wall entrance to building ( aka 61-35 233 place )
Oct 31, 2009
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell system from entrance door to building ( aka 61-35 223 place ) in the entire apartment located at apt a, 1st story
Oct 31, 2009 · Apt A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ceiling light fixture at vestibule ( aka 61-35 223 place ) at public hall, 1st story
Oct 31, 2009
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling building 64-23 223 pl. in the bathroom located at apt 1, 1st story
Nov 25, 2003 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling unit 64-23a 223 pl in the bathroom located at apt 281a, 1st story
Apr 7, 2003 · Apt 281A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color wall in building 64-23 223 place in the 1st room from north located at apt a, 1st story
Jan 23, 2003 · Apt A
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective grout ceramic wall tile by the bathtub area in building 64-23 223 place in the bathroom located at apt a, 1st story
Jan 23, 2003 · Apt A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mildew on the ceiling in building 64-23 223 place in the bathroom located at apt a, 1st story
Jan 23, 2003 · Apt A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin roaches in building # 64-38 224 street in the entire apartment located at apt b, 2nd story
Jan 21, 2003 · Apt B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings all rooms and hallway unit 64-24 224 st in the entire apartment located at apt 1a, 1st story
Dec 3, 2002 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace smoke detector defective unit 64-24 224 st in the entire apartment located at apt 1a, 1st story
Dec 3, 2002 · Apt 1A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mold and mildew walls and ceiling unit 64-24 224 st in the bathroom located at apt 1a, 1st story
Dec 3, 2002 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective upper east window sash unit 64-24 224 st in the 1st room from east located at apt 1a, 1st story
Dec 3, 2002 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a, 1st story, apartment at west , section ''64-05 223 ''
Apr 2, 2002 · Apt A
Closed — Violation closed - BHazardous
Properly repair the broken or defective window frame in the 1st bedroom from north at east located at apt b, 2nd story
Sep 9, 2000 · Apt B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling of kitchen in the entire apartment located at apt b, 2nd story
Sep 9, 2000 · Apt B
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective rotted window sill in the bathroom located at apt b, 2nd story
Sep 9, 2000 · Apt B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall front room in the entire apartment located at apt b, 2nd story
Sep 9, 2000 · Apt B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall south-east room in the 1st bedroom located at apt b, 2nd story
Sep 9, 2000 · Apt B
Closed — Violation dismissed
DOB building violations
35 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Apr 23, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 25, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 25, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 25, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed
ECB violations
1 ECB violations, newest first.
- Class - 1
Work w/out a permit.at time of inspection observed at apt b,1st fl,penetration thru sub-floor into garage area creating a platform along w/ stair stronger for new opening & access (direct)from 1st fl to garage.
Oct 2, 2021 · Penalty $2,500
Resolve