Violations at 221-08 64 Avenue
Queens, NY 11364 · BBL 4-07656-0002 · Back to the property
HPD housing violations
20 HPD violations, newest first.
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the entire apartment located at apt 1, 1st story, apartment at west
Jun 12, 2019 · Apt 1
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, apartment at west
Jun 12, 2019 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, apartment at west
Jun 12, 2019 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 2nd room from east located at apt 1, 1st story, apartment at west
Jun 12, 2019 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east located at apt 1, 1st story, apartment at west
Jun 12, 2019 · Apt 1
Closed — Violation closed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar throughout.
Aug 14, 2017
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 10, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden subfloor in the 1st room from north at east located at apt a, 1st story
Jun 10, 2017 · Apt A
Open — Nov certified late - BHazardous
Repair the leaky and/or defective faucets at buth tub in the bathroom located at apt a, 1st story
Jun 10, 2017 · Apt A
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin water bugs at basement
Jun 2, 2017
Closed — Violation closed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the basement
May 24, 2017
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin excessive evidence of roaches observed at entrance to crawl space in the south yard , 1st story
Apr 19, 2017
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west
Oct 21, 2016 · Apt 1STFL
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... approximately 8 square feet at the north wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west , section ''65-24'', at south
Oct 21, 2016 · Apt 1STFL
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... approximately 8 square feet at the east wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west , section ''65-24'', at south
Oct 21, 2016 · Apt 1STFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west , section ''65-24'', at south
Oct 21, 2016 · Apt 1STFL
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from east at south located at apt 1stfl, 1st story, 1st apartment from south at west , section ''65-24'', at south
Oct 21, 2016 · Apt 1STFL
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the south wall in the 1st room from east at south located at apt 1stfl, 1st story, 1st apartment from south at west , section ''65-24'', at south
Oct 21, 2016 · Apt 1STFL
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west , section ''65-24'', at south
Oct 21, 2016 · Apt 1STFL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective brick work at north exterior wall at building front(65-32)
Jun 13, 2012
Closed — Violation closed
DOB building violations
2 DOB violations, newest first.
- Construction other optional
Mp
Mar 28, 1990
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Sep 12, 1988
Dob violation - dismissed
ECB violations
No ECB violations on record