Violations at 221-02 Horace Harding Expre
Queens, NY 11364 · BBL 4-07644-0033 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
22 DOB violations, newest first.
- High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - active - High pressure boiler boiler required
Violation issued for failure to file 2016 annual high pressure boiler inspection
Jun 22, 2018
Dob violation - active - Construction other optional
C-construction other optional
Sep 21, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 3, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
May 6, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 2, 2007
Dob violation - dismissed - Electric signs none
Jv
May 25, 1989
Dob violation - dismissed
ECB violations
10 ECB violations, newest first.
- Class - 2
Work without a permit. observed metal awning structure at rear of grocery store "new mart" approx. 30ft x 25ft and 10 ft high extending onto parking lot. no permit on file for structure., obtain all permits
May 1, 2026 · Penalty $1,250
Active - Class - 2
Failure to maintain building in a code compliant manner. noted; at parking lot of premises, the parking lot road is in a stated of unrepair with potholes , creatin a trip hazard for the public and creating a dr
Aug 18, 2025
Resolve - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy or building department record : at time of inspection of a 1 story bldg. observed the korean b.b.q. restaurant has extended operations to the e
Dec 26, 2024 · Penalty $3,125
Resolve - Class - 2
Work with out permit: at time of inspection of a 1 story bldg. observed the korean b.b.q. restaurant has extended operations to the exterior by erecting a large dining structure in the parking lot attached to t
Dec 26, 2024 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#35307119l issued on 12/12/17, and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certific
Aug 30, 2018 · Penalty $1,250
Resolve - Class - 3
Work does not conform to approved construction documents and/or approved amendments.job #420482374 permit expired 12/31/2011.noted: 1)cellarrear exit door not match to plan dated sept. 15,2011 2)east side exter
Dec 12, 2017 · Penalty $200
Active - Non-hazardous
Work does not confrom to approved plan 3402405318/a2/01-10-08 non conform work! 1. 1st flr open holes above drop ceiling exposed root joist not fire rated (plan shows 2 hr's fire rated ceiling) 2. rer bakery mo
Apr 28, 2008
Resolve - Non-hazardous
Use of illegal locking hardware/total obstruction. for alt ii job #40243581 of which permit has expired. found cellar 2nd means of egress locked & shut w/no means of uunlocking from inside.
Apr 16, 2008 · Penalty $350
Resolve - Non-hazardous
Exit passageway or corridor: total obstruction. alt ii job #402435851.plans indicate a 2nd means of egress from cellar level. found that this 2nd means of egress not accessible or usable because door to rear
Apr 16, 2008 · Penalty $480
Resolve - Non-hazardous
40/ 50(a)/ 50(b)/ columbia ftsm boiler, 10 hp, nb 94838 (40) draft stat not properly installed on the flue pipe. device in operable re-position draft stat. 50(a) the steam pressure gauge has a dial range of 0-1
Feb 5, 2007
Resolve