roofy

Violations at 61-53 Springfield Blvd

Queens, NY 11364 · BBL 4-07644-0002 · Back to the property

HPD housing violations

43 HPD violations, newest first.

  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the bathroom located at apt 21a, 1st story, 1st apartment from south at west , section ''61-78''

    Apr 23, 2026 · Apt 21A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the private hallway located at apt 21a, 1st story, 1st apartment from south at west , section ''61-78''

    Apr 23, 2026 · Apt 21A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the 1st room from east located at apt 21a, 1st story, 1st apartment from south at west , section ''61-78''

    Apr 23, 2026 · Apt 21A

    Closed — Violation closed
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 21a, 1st story, 1st apartment from south at west , section ''61-78''

    Apr 23, 2026 · Apt 21A

    Closed — Violation closed
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 21a, 1st story, 1st apartment from south at west , section ''61-78''

    Apr 23, 2026 · Apt 21A

    Closed — Violation closed
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 21a, 1st story, 1st apartment from south at west , section ''61-78''

    Apr 23, 2026 · Apt 21A

    Open — Not complied with
  • ANon-hazardous

    Refit door at base cabinet at sink in the kitchen located at apt 21a, 1st story, 1st apartment from south at west , section ''61-78''

    Apr 23, 2026 · Apt 21A

    Open — Not complied with
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the kitchen located at apt 21a, 1st story, 1st apartment from south at west , section ''61-78''

    Apr 23, 2026 · Apt 21A

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department door moldings at building front entrance door at public hall, 1st story

    Mar 5, 2025

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective door moldings at building front entrance door at public hall, 1st story

    Mar 5, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at north and west wall at public hall, 1st story

    Mar 5, 2025

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant materials at north and west wall at public hall, 1st story

    Mar 5, 2025

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceiling in the private hallway located at apt b, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... greater than 10 square feet at all walls in the private hallway located at apt b, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt b, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceiling in the bathroom located at apt b, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt B

    Closed — Violation dismissed
  • CImmediately hazardous

    Trace and repair the source and abate the visible mold condition... greater than 30 square feet at all walls and ceiling in the bathroom located at apt b, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt B

    Open — Invalid certification
  • ANon-hazardous

    Properly repair or replace the broken or defective electrical switch cover at south wall in the private hallway located at apt b, 2nd story, 1st apartment from north at east

    Jul 23, 2024 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Abate the nuisance consisting of consisting of lower window sash stuck in closed position at south wall in the 2nd room from north located at apt b, 2nd story, 1st apartment from north at east

    Jul 23, 2024 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair or replace the broken or defective counter balances at lower window sash at north wall in the bathroom located at apt b, 2nd story, 1st apartment from north at east

    Jul 23, 2024 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Provide a proper seat for water closet in the bathroom located at apt b, 2nd story, 1st apartment from north at east

    Jul 23, 2024 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair or replace the broken or defective door in the bathroom located at apt b, 2nd story, 1st apartment from north at east

    Jul 23, 2024 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair or replace the broken or defective counter balances at lower window sash at north wall in the kitchen located at apt b, 2nd story, 1st apartment from north at east

    Jul 23, 2024 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... greater than 10sq ft at east ceiling in the bathroom located at apt b, 2nd story, 1st apartment from north at east

    Jul 23, 2024 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective wood frame at entrance door leading to 1st sty at public hall, 1st story

    Jul 8, 2024

    Closed — Violation dismissed
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt a, 1st story, 1st apartment from west at north

    Jan 7, 2022 · Apt A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the bathroom , the 1st room from north at west, the private hallway , the 2nd room from north at east located at apt a, 1st story, 1st apartment from west at north

    Nov 22, 2021 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective the door lockset in the entrance located at apt b, 1st story, 1st apartment from east at south

    Mar 5, 2021 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... at south wall 1 sqft in the bathroom located at apt b, 2nd story, 1st apartment from south at west

    Feb 13, 2021 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and south wall in the bathroom located at apt b, 2nd story, 1st apartment from south at west

    Feb 13, 2021 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and north wall in the 2nd bedroom from north at east located at apt b, 2nd story, 1st apartment from south at west

    Feb 13, 2021 · Apt B

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt b, 2nd story, 1st apartment from south at west

    Feb 13, 2021 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective vinyl-tiles floor in the kitchen located at apt b, 2nd story, apartment at south

    Apr 17, 2020 · Apt B

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2019

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the nuisance consisting of scalding hot water in the kitchen located at apt b, 2nd story, 1st apartment from north at east

    May 16, 2019 · Apt B

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt b, 2nd story, 1st apartment from east at south

    Jun 21, 2018 · Apt B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from east at south located at apt b, 2nd story, 1st apartment from east at south

    Jun 21, 2018 · Apt B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling at closet in the 1st bedroom from north at west located at apt 24b, 2nd story, section ''61-74b''

    Mar 31, 2017 · Apt 24B

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department ceiling. in the bathroom located at apt 24b, 2nd story, section ''61-74b''

    Mar 31, 2017 · Apt 24B

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak ceiling. in the entire apartment located at apt 24b, 2nd story, section ''61-74b''

    Mar 31, 2017 · Apt 24B

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 6 sq.ft in the bathroom located at apt 24b, 2nd story, 1st apartment from west at north

    Oct 26, 2016 · Apt 24B

    Closed — Violation dismissed
  • CImmediately hazardous

    Remove the illegal double cylinder key operated locking device at door .. in the entrance located at apt b, 1st story

    Jan 14, 2016 · Apt B

    Closed — Violation closed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story

    Dec 30, 2012 · Apt 2

    Closed — Violation dismissed

DOB building violations

6 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 5, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    Aug 8, 1980

    Dob violation - dismissed

ECB violations

1 ECB violations, newest first.

  • Class - 1

    Work w/o ap ermit. based on physical observation of gas work completed in cellar/basement gas meter rm & apt.of above address, no permits were issued/filed as stated on emergency work notification dated 05/10/1

    Jun 15, 2011 · Penalty $1,600

    Resolve