Violations at 213-09 73 Avenue
Queens, NY 11364 · BBL 4-07633-0001 · Back to the property
HPD housing violations
14 HPD violations, newest first.
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt b, 2nd story
Sep 21, 2018 · Apt B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the 2nd room from east located at apt b, 2nd story, apartment at south
Aug 24, 2018 · Apt B
Closed — Violation closed - BHazardous
Repair the broken or defective connection at waste line under sink in the kitchen located at apt b, 2nd story, apartment at south
Aug 24, 2018 · Apt B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt b, 2nd story, apartment at south
Aug 24, 2018 · Apt B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective grout and acrylic sealer around bath tub in the bathroom located at apt b, 2nd story, apartment at south
Aug 24, 2018 · Apt B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain surface at the interior at bathtub (reglaze) in the bathroom located at apt b, 2nd story, apartment at south
Aug 24, 2018 · Apt B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste pipe under wash basin in the bathroom located at apt b, 2nd story, apartment at south
Aug 24, 2018 · Apt B
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt b, 2nd story
Oct 28, 2015 · Apt B
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling & east wall in the kitchen located at apt b, 2nd story
Apr 13, 2015 · Apt B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department west wall in the bathroom located at apt b, 2nd story
Apr 13, 2015 · Apt B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... mildew at south wall. appox. 2 sq.ft in the kitchen located at apt a, 1st story, section ''69-53a'', at east
Apr 22, 2010 · Apt A
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective ceramic tile at north wall in the bathroom located at apt a, 1st story, section ''69-53a'', at east
Apr 22, 2010 · Apt A
Open — Nov certified late - BHazardous
Properly repair the broken or defective electric outlet at south wall in the 1st room from east located at apt a, 1st story, section ''69-53a'', at east
Apr 22, 2010 · Apt A
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the entire apartment located at apt a, 1st story, section ''69-53a'', at east
Apr 22, 2010 · Apt A
Open — Nov certified late
DOB building violations
13 DOB violations, newest first.
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2022
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
ECB violations
2 ECB violations, newest first.
- Class - 2
A8 unapproved unsafe/ unsuitable electrical equipment, apparatus, materials, devices,appliances or wiring in use. defective feeder conductor, and feeder disconnect switch in use for apt 210-20b, comply with ec;
Aug 16, 2023 · Penalty $400
Resolve - Class - 2
Failure to maintain bldg in code compliant manner installation/maintenance of plumbing materials/equipment per pc 102.3, 27-902.observed & photo taken pvc flexible drain tailpiece under kitchen sink & tenant sh
May 18, 2010
Resolve