roofy

Violations at 213-09 73 Avenue

Queens, NY 11364 · BBL 4-07633-0001 · Back to the property

HPD housing violations

14 HPD violations, newest first.

  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt b, 2nd story

    Sep 21, 2018 · Apt B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the 2nd room from east located at apt b, 2nd story, apartment at south

    Aug 24, 2018 · Apt B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective connection at waste line under sink in the kitchen located at apt b, 2nd story, apartment at south

    Aug 24, 2018 · Apt B

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt b, 2nd story, apartment at south

    Aug 24, 2018 · Apt B

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective grout and acrylic sealer around bath tub in the bathroom located at apt b, 2nd story, apartment at south

    Aug 24, 2018 · Apt B

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective porcelain surface at the interior at bathtub (reglaze) in the bathroom located at apt b, 2nd story, apartment at south

    Aug 24, 2018 · Apt B

    Closed — Violation closed
  • BHazardous

    Remove all obstructions and repair all defects in waste pipe under wash basin in the bathroom located at apt b, 2nd story, apartment at south

    Aug 24, 2018 · Apt B

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of mice in the entire apartment located at apt b, 2nd story

    Oct 28, 2015 · Apt B

    Open — Invalid certification
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department ceiling & east wall in the kitchen located at apt b, 2nd story

    Apr 13, 2015 · Apt B

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department west wall in the bathroom located at apt b, 2nd story

    Apr 13, 2015 · Apt B

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... mildew at south wall. appox. 2 sq.ft in the kitchen located at apt a, 1st story, section ''69-53a'', at east

    Apr 22, 2010 · Apt A

    Open — Nov certified late
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tile at north wall in the bathroom located at apt a, 1st story, section ''69-53a'', at east

    Apr 22, 2010 · Apt A

    Open — Nov certified late
  • BHazardous

    Properly repair the broken or defective electric outlet at south wall in the 1st room from east located at apt a, 1st story, section ''69-53a'', at east

    Apr 22, 2010 · Apt A

    Open — Nov certified late
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the entire apartment located at apt a, 1st story, section ''69-53a'', at east

    Apr 22, 2010 · Apt A

    Open — Nov certified late

DOB building violations

13 DOB violations, newest first.

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2023

    Jun 23, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2022

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed

ECB violations

2 ECB violations, newest first.

  • Class - 2

    A8 unapproved unsafe/ unsuitable electrical equipment, apparatus, materials, devices,appliances or wiring in use. defective feeder conductor, and feeder disconnect switch in use for apt 210-20b, comply with ec;

    Aug 16, 2023 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner installation/maintenance of plumbing materials/equipment per pc 102.3, 27-902.observed & photo taken pvc flexible drain tailpiece under kitchen sink & tenant sh

    May 18, 2010

    Resolve