219-18 Hor Harding Ep Sr S
Queens, NY 11364BBL 4-07609-0008Map
Owner of record: 220 Hh LLC
219-18 Hor Harding Ep Sr S is an office building built in 2015 in Queens, 11364. The owner of record is 220 Hh LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 4
- ECB violations
- 12
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 4
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 16, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 4, 2015
Dob violation - dismissed
ECB violations · 12
- Class - 2
59bb5, 57m7, 99bb5 59bb, perform current brake maintenance. 57m, provide fire extinguisher in control room. 99bb, perform & file current 1 yr. test
Sep 27, 2019
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. nb-job# 420651477 on an energy compliance insp, observed 8condensing units @ roof top, 3 air handlers @ 2nd flr & 5 air handlers
Dec 30, 2016 · Penalty $500
Resolve - Class - 2
Bc3301.7 failure to provide pe approved design drawings. as noted:at time of inspection on an active construction site observe at floor#1 to #2 structural steel steps and cmu blocks parapet wall at roof level
Mar 30, 2016 · Penalty $400
Resolve - Class - 1
Failure to provide sidewalk shed where required. as noted: at time of inspection on an active construction site, observe at exp#2 a flatbed truck unloading material hoisting to roof level. failure to provide
Mar 30, 2016 · Penalty $4,800
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperation. as noted: at time of inspection on an active construction site, observe workers laying cmu blocks for parapet walk at roof level
Mar 30, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction.no toeboards. as noted: at time of inspection on an active construction site observe at floor #2, roof level at exp1,2,4 failur
Mar 30, 2016 · Penalty $1,000
Resolve - Class - 1
Bc3303.4.1 failure to maintain sidewalk free from equipment. as noted at time of inspection on an active construction site observe at exp2 a flatbed truck unloading material to roof level.flatbed truck outrig
Mar 30, 2016 · Penalty $2,400
Resolve - Class - 2
Jobsite fence not constructed pursuant to subsection as noted:@time ofsite insp observed plywood jobsite fence not constructed pursuant to subsection plywood fence not toward sidewalk,not built solid for their
Aug 10, 2015
Resolve - Class - 1
Work does not conform to approved construction documents or amended documents. as noted: at time of inspection on an active construction site cmu block placement at celalr level for elevator shaft.observed
Aug 4, 2015 · Penalty $1,030
Resolve - Class - 1
Failure to institute/maintain safety equipment or temporary construction (no guardrails) noted @ time of inspection @ an active constructionsite observe @ grade level failure to institute/maintain safety equipm
Jul 15, 2015 · Penalty $1,200
Resolve
Show 2 more ↓
- Class - 2
Bc3301.7 failure to provide p.e approved design drawings.reinspection call 2123132730.noted @ time of inspection on an active construction site,observe @ cellar level:worker installing bare plate & anchor bolts
Jul 15, 2015 · Penalty $830
Resolve - Class - 2
Bc28-105.5 forms filed with dob do not have required signatures as noted: forms filed witht he dob donot have required signatures at line #5concrete producers statement and signature on tr3. call 212-393-2730
Mar 9, 2015
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O5)
- Year built
- 2015
- Floors
- 2.5
- Residential units
- —
- Building area
- 18,840 ft²
- Lot area
- 6,239 ft²
- Zoning
- R4
- Community board
- 411
- Council district
- 23
- Block / lot
- 7609 / 8
- Assessed value
- $1,759,500
- Landmark / historic district
- No
Questions about 219-18 Hor Harding Ep Sr S
Who owns 219-18 Hor Harding Ep Sr S?
The owner of record in NYC Department of City Planning PLUTO data is 220 Hh LLC.
Does 219-18 Hor Harding Ep Sr S have violations?
NYC HPD has no housing violations on record for this property.
Is 219-18 Hor Harding Ep Sr S rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 219-18 Hor Harding Ep Sr S built?
City records list 2015 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.