50-44 213 Street
Queens, NY 11364BBL 4-07389-0026Map
Owner of record: Star213property LLC
50-44 213 Street is an one-family home built in 1945 in Queens, 11364. It has 1 residential unit across 1.5 floors. The owner of record is Star213property LLC. HPD has recorded 18 housing violations here, most recently on September 22, 2024. 12 of the 18 most recent violations are still open.
- HPD violations
- 18
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 27
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- CImmediately hazardous
Remove the illegal fastening double cylinder lock at building front secuirty gate in the entrance located at apt 1, 1st story
Sep 22, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story
Sep 22, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture above entrance door, house front located at apt 1, 1st story
Sep 22, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Remove the illegal fastening double cylinder locke at metal security door in the entrance located at apt 1, 1st story, 1st apartment from south at west
Aug 24, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the missing handrail stair railing from intermediant landing to the 2nd story in the private hallway located at apt 1, 1st story, 1st apartment from south at west
Aug 24, 2024 · Apt 1
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures north wall light switch to ceiling light fixture in the foyer located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with - BHazardous
Provide a safe and adequate supply of electric service to the fixtures north wall light switch to ceiling light fixture in the private hallway located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall leading to east 4 room in the private hallway located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak south wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with
Show 8 more ↓
- BHazardous
Properly repair or replace the broken or defective light switch north wall staircase leading to upper level in the private hallway from north at east located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall upper level in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective acustic ceiling tiles upper in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood panneling south wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with - BHazardous
Abate the infestation consisting of vermin ants in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with - ANon-hazardous
Refit door upper level in the 2nd bathroom from east located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic tiles west wall upper in the 2nd bathroom from east located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective electrical receptacles at south wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west
Aug 2, 2024 · Apt 1
Open — Not complied with
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Work w/o a permit. work noted: at rear of premises exp #3 erected wooden deck approx 12'w x 15l w/vertical posts,(blisters),handrails,supporter by vertical wooden posts. remedy: obtain permit or restore to prio
Nov 28, 2012
Resolve
Complaints
- Unsanitary condition
Pests
Nov 11, 2024 · Apt 1
Close - Electric
Outlet/switch
Nov 6, 2024 · Apt PVT
Close - Door/window
Door
Nov 6, 2024 · Apt PVT
Close - Unsanitary condition
Pests
Nov 6, 2024 · Apt PVT
Close - Flooring/stairs
Stairs
Nov 6, 2024 · Apt PVT
Close - Paint/plaster
Wall
Nov 6, 2024 · Apt PVT
Close - Plumbing
Basin/sink
Nov 6, 2024 · Apt PVT
Close - Plumbing
Basin/sink
Nov 6, 2024 · Apt PVT
Close - Flooring/stairs
Floor
Nov 6, 2024 · Apt PVT
Close - Door/window
Door
Nov 6, 2024 · Apt PVT
Close
Show 17 more ↓
- Unsanitary condition
Pests
Nov 6, 2024 · Apt PVT
Close - Paint/plaster
Wall
Aug 20, 2024 · Apt 1
Close - Electric
Outlet/switch
Aug 20, 2024 · Apt 1
Close - Paint/plaster
Cabinet
Aug 20, 2024 · Apt 1
Close - General
Ventilation system
Aug 20, 2024 · Apt 1
Close - Paint/plaster
Wall
Aug 20, 2024 · Apt 1
Close - Paint/plaster
Ceiling
Aug 6, 2024 · Apt PVTHOU
Close - Paint/plaster
Wall
Aug 6, 2024 · Apt PVTHOU
Close - Safety
Window guard broken/missing
Aug 6, 2024 · Apt PVTHOU
Close - Paint/plaster
Ceiling
Aug 6, 2024 · Apt PVTHOU
Close - Paint/plaster
Wall
Aug 6, 2024 · Apt PVTHOU
Close - Safety
Carbon monoxide detector
Aug 6, 2024 · Apt 1
Close - Electric
Wiring
Jul 31, 2024 · Apt 1
Close - Door/window
Door
Jul 31, 2024 · Apt 1
Close - Electric
Outlet/switch
Jul 31, 2024 · Apt 1
Close - Paint/plaster
Ceiling
Jul 31, 2024 · Apt 1
Close - Door/window
Window frame
Jul 31, 2024 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- One-family home (A0)
- Year built
- 1945
- Floors
- 1.5
- Residential units
- 1
- Building area
- 1,344 ft²
- Lot area
- 4,000 ft²
- Zoning
- R2A
- Community board
- 411
- Council district
- 23
- Block / lot
- 7389 / 26
- Assessed value
- $70,860
- Landmark / historic district
- No
Questions about 50-44 213 Street
Who owns 50-44 213 Street?
The owner of record in NYC Department of City Planning PLUTO data is Star213property LLC.
Does 50-44 213 Street have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 50-44 213 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 50-44 213 Street built?
City records list 1945 as the year it was built.
How many apartments are in 50-44 213 Street?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.