Violations at 196-10 Union Turnpike
Queens, NY 11423 · BBL 4-07290-0001 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
14 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
ECB violations
15 ECB violations, newest first.
- Class - 1
At time of inspection, i observed excavation that exceeded more than 5ft and no sheeting/ shoring /bracing was installed to support it sides/ stop all excavation work. support side of excavation.
Jun 7, 2026 · Penalty $5,000
Resolve - Class - 2
Bc3304.4.4 observed site closed excavation work in progress upon visual inspection noted no shoring when 6 feet deep has been excavated, spoil pile is also at the edge of excavation making 10 feet high ., miss
Jun 7, 2026 · Penalty $2,500
Active - Class - 2
Observed : site closed upon inspection noted : chain fence contrary to approved documents e-002.00 missing panel view, fence ties or top rails,& stel post t pin and kepper pin see detail type #1&2
Jun 7, 2026 · Penalty $1,250
Active - Class - 2
Observed active excavation work was taking place without approved permit for excavation. no valid dob approved permit for excavation work was obtained or posted @ site prior to the commencement of this work. st
Apr 20, 2026
Resolve - Class - 2
Bc3301.13.5 alternate: during inspection of an alteration at cunningham park, review of the logbook and talking to the competent person revealed that the superintendent had not been onsite since november 7, 202
Dec 2, 2025 · Penalty $2,500
Resolve - Class - 2
Atthe time of my inspection of active construction job site-upon asking for site safety plan,pre-shift log book and orientation log book -none were provided-not on site-stop all work under aplication # 42176476
Oct 21, 2025 · Penalty $1,250
Resolve - Class - 2
Found peerless 6306 steam boiler not registered, maintain boiler; register the boiler and submit a certificate of correction
Jun 7, 2023 · Penalty $625
Active - Class - 2
Found peerless 6306 steam boiler not registered, no storage in boiler room need pigtail on steam gauge register the boiler and correct violating onditions submit a certificate of correction
Jun 7, 2023 · Penalty $625
Active - Class - 2
A fire extinguisher shall be provided as required by the dob mc-1301.8 . anti siphon valve shall be installed as required by the dob mc-130.4 fuel-burning and fuel-oil storage equipment plans. construction docu
Jun 15, 2022
Resolve - Class - 2
Found weil mclain wgo-4 serial# cp 5004137 in building with rest rooms in rear of paking lot not registered not enough fresh air in room,missing manual reset aquastat, and storage in boiler room, maintain boile
Jul 12, 2021 · Penalty $625
Active - Class - 1
Found weil mclain wtgo-3 serial# cp 6130163 located in building with rest rooms in rear of parking lot not registered missing manual reset aquastat discharge pipe on relief valve, maintain boiler; register the
Jul 12, 2021 · Penalty $1,250
Active - Class - 2
Found peerless model# 63-06 gas fired boiler not registered, maintain boiler; register the boiler and submit a certificate of correction
Jul 12, 2021 · Penalty $625
Active - Class - 1
Found hb smith 19-5 serial# f93-382 in concession building no# not registered relief valve defective on water heater, maintain boiler; register the boiler and correct violating conditions submit a certificate o
Jul 12, 2021 · Penalty $1,250
Active - Class - 2
Discharge pipe missing from relief valve on water heater,found peerless model# 63-06 gas fired boiler not registered register the boiler and submit a certificate of correction
Jul 12, 2021 · Penalty $625
Active - Class - 2
Found smith 350-11 gas fired steam boiler not registered,no storage in boiler room, maintain boiler; register the boiler and submit a certificate of correction
Jul 12, 2021 · Penalty $625
Resolve