Violations at 58-04 Utopia Parkway
Queens, NY 11365 · BBL 4-06882-0001 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
42 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 2, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 25, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 26, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2004
Dob violation - resolved - Elevator elevatorrequired
4p3202
Apr 23, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 25, 1991
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed
ECB violations
The newest 50 of 97 ECB violations. The city keeps the complete history.
- Class - 2
Failure to maintain building in code compliant manner.noted crumbling/missing concrete at step stairs to electrical room.rem:repair and/or replace.
May 7, 2026 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner.noted loading dock in disrepair-water leaking into space below.rem:repair and/or replace.
May 7, 2026 · Penalty $1,250
Active - Class - 2
Reissued ecb#35721243m failure to maintain building in code-compliant manner.noted smoke doors not closing properly at:classroom#109,by exit#18,2nd floor stairs b,e,f,i;3rd floor stairs a,b,c,d,e,g,h,l,m.rem:re
May 7, 2026 · Penalty $3,125
Active - Class - 2
Reissued ecb#35721244y failure to maintain building in code-compliant manner.noted at boiler room water penetration through foundation and floor slab.rem:repair and/or replace.
May 7, 2026 · Penalty $3,125
Active - Class - 2
Reissued ecb#35721246h failure to maintain building in code-compliant manner.noted no guardrails at all roof parapet walls.rem:repair and/orreplace.
May 7, 2026 · Penalty $3,125
Active - Class - 2
Reissued ecb#35721247j failure to maintain building in code-compliant manner.noted water damaged ceilings at classrooms#219 and 1st floor corridor by cafeteria.rem:repair and/or replace.
May 7, 2026 · Penalty $3,125
Active - Class - 2
Reissued ecb#35721248l exit door not self-closing.noted exit doors notself-closing at:exit#16,exit#18.rem:repair/replace door.
May 7, 2026 · Penalty $1,562
Active - Class - 2
Reissued ecb#35721249n failure to maintain building in code-compliant manner.illumination for exits,exit discharges and pubic corridors per bc 1006.1;27-381.noted emergency lights not working at 1st floor stair
May 7, 2026 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code-compliant manner. lack of emergency lighting for exits, exit discharges and public corridors per bc 1006.1; 27-542. noted: emergency lights that did not work when tested wer
Jul 22, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner. noted: 3rd flr staircases a and b, c and d, e, g and h, l and m does not close properly.2nd flr staircases b, e and f, i does not close properly. exit 16 a
Jul 22, 2025 · Penalty $625
Active - Class - 2
Failure to maintain building in code-compliant manner. noted: water penetration from 3rd floor room 313 science lab to room 219 ceiling. also water penetration from roof to 1st flr. ceiling in two spots near bo
Jul 22, 2025 · Penalty $1,250
Active - Class - 2
Reissue #35684807z. failure to maintain building in code-compliant manner. noted: rooftop parapet walls under required 42" height, no guardrails provided. remedy: repair and/or replace.
Jul 22, 2025 · Penalty $3,125
Active - Class - 2
Reissue #35684808k. failure to maintain building wall(s) or appurtenances. noted: roof level chimney has step cracks with seperating bricks,along mortar joints. additionally step crack in masonary walls at 1st
Jul 22, 2025 · Penalty $6,250
Resolve - Class - 2
Reissue #35684809m. failure to maintain building in code-compliant manner. noted: at cellar level boiler room, water penetration through foundation walls and floor slab. approx 1" of standing water accumulated
Jul 22, 2025 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code-compliant manner. noted: self-closing classroom doors have to be forced closed on 3rf flr at 339, 337, 335, 334, 332, 326, 324, 319, 320, 318, 315, 313, 311, 310, 308, 306,
Jul 22, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. noted: 2rd flr exit signs at signs at staircase(g and h). 1st flr exit
Jul 22, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner. noted: first floor room "109" does not close properly. have to force door close. remedy: repair and/or replace.
Jul 21, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner: illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. noted emergency lights not working when tested at 2nd fl library #64, #
Aug 26, 2024 · Penalty $625
Resolve - Class - 2
Exit door not self-closing. noted exterior doors not self-closing properly at: exit #18, 3, 5, 13, main entranc(far left and far right) and 6 exterior door leading to/from courtyard. remedy: replace/repair door
Aug 26, 2024 · Penalty $625
Resolve - Class - 2
Failure to maintain in code-compliant manner. noted interior ppsc doors not working/closing properly. at 3rd fl stair a/b and c/d. 2nd fl stair i, e/f and b. at 1st fl interior smoke doors at exit #18, 1, 2, 3,
Aug 26, 2024 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner. noted at cellarlevel boiler room, water penetration through foundation walls and floor slab. approx 1" of standing water accumualted in corner by boiler ro
Aug 26, 2024 · Penalty $625
Active - Class - 2
Failure to maintain building wall(s) or appurtenances. noted roof level chimney has step cracks with seperating bricks, along mortar joints.additionally step crack in masonry walls at 1st fl levels by exit #11
Aug 26, 2024 · Penalty $1,250
Resolve - Class - 2
Reissue #35672997k. failure to maintain building in code-compliant manner. noted rooftop parapet walls under required 42" height. no railingprovided. remedy: provide railing/parapet height.
Aug 26, 2024 · Penalty $1,562
Active - Class - 2
Reissue # 35655414p: failure to maintain building in code-compliant manner at rooftop parapet failure to provide proper height railing at minimum 42" remedy: provide railing to height at rooftop
Jul 21, 2023 · Penalty $1,562
Active - Class - 2
Reissue35591777y(8/24/21) failure to maintain bldg in codecompliant manner:rooftop parapet walls under required 42"ht repair/provide rails
Jun 21, 2022 · Penalty $1,562
Active - Class - 2
28-301.1 reissue35591779h(8/24/21) failure to provide natural or mechanical ventilation to occupied spaces per mc401.2@rm111f occupied as office w/no proper ventilation&no windows.comply w/notice of vio&provide
Jun 21, 2022 · Penalty $3,125
Resolve - Class - 2
Reissue35591780p(8/24/21) failure to maintain bldg in codecompliant manner:@cellar level,boiler rm water infiltration from roof&foundation.repair &or replace
Jun 21, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue35591781r(8/24/21) failure to maintain bldg in codecompliant manner:@cellar level electrical rm 2"waterfilled cement fl due to water infiltration from foundation wall.repair &or replace (foundation wall)
Jun 21, 2022 · Penalty $1,562
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. at time of inspection on an active jobsite,observed worker cutting/grinding metal bracket using unguarded angle grinder w/wheel
Mar 21, 2022 · Penalty $625
Resolve - Class - 1
Sec. bc 3301.1.2 failure to comply w/nyc fire code. at time of inspection on an active jobsite,observed hot work operations-worker cutting metal bracket generating sparks by using angle grider at 1st fl at rear
Mar 21, 2022 · Penalty $625
Resolve - Class - 2
Sec. bc 3314.4.8 failure to maintain scaffold as per code subsection. at time of inspection on an active jobsite,observed 2 pipe scaffolds framed at the stairlandings of staircase a & b to accomodate the cmu in
Mar 21, 2022
Resolve - Class - 2
Failure to maintain building in code compliant manner.lack of emergency lighting for exits discharges and public corridors.per bc 1006.1;27-542.noted:at temporary trailers t1, t2, t3, t4 all four emergency ligh
Aug 24, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code compliant manner.lack of emergency lighting for exits,exit discharges and public corridors per bc 1006.1;27-542.noted:at auditorium 4 emergency lighting observed defective w
Aug 24, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:at main electrical room aprox 3" water puddle observed due to porous foundation walls.remedy:maintain foundation walls.
Aug 24, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:at cellar at boiler room entrance active roof drain leak.remedy:repair and/or replace.
Aug 24, 2021 · Penalty $625
Resolve - Class - 2
28-301.1 failure to provide natural or mechanical ventilation to occupied spaces per mc 401.2.noted:at room 111f swithboard illegally converted into office with 2 desks and no ventilation.remedy:comply with not
Aug 24, 2021 · Penalty $3,125
Resolve - Class - 2
Nov #35500840l.failure to maintain building in code compliant manner.noted:at cellar level boiler room foundation walls have become porous allowing water into boiler room.remedy:maintain exterior wall/foundatio
Aug 24, 2021 · Penalty $1,562
Resolve - Class - 2
Nov #35500841n.failure to maintain building in code compliant manner.noted:at rooftop parapet is less than 42" in height.remedy:provide railing/parapet.
Aug 24, 2021 · Penalty $1,562
Active - Class - 1
3308.4 responsiblity and supervision-installation,adjustment,maintenance,repair and removal of all safety netting system and guardrail.at the time of inspection at 3 story new building active jobsite,i observed
Jun 30, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at roof top,parapet is less than 42'inch in height. remedy: provide railing/parapet.
Jul 13, 2020 · Penalty $625
Active - Class - 2
Reissue#35452127m failure to maintain bldg in code compliant manner. noted: at cellar level,boiler room,foundation wall has become porous allowing the water into the boiler room. also water is seeping through
Jul 13, 2020 · Penalty $1,562
Resolve - Class - 2
Sec. 28-301.1 reissue#35452130n failure to provide natural or mechanical ventilation to occupied spaces per mc 401.2. noted: at room 111f,switch board,illegally converted into an office space w/2 desks & no ven
Jul 13, 2020 · Penalty $3,125
Resolve - Class - 2
Reissue#35452131p failure to maintain bldg in code compliant manner: illumination for exits,exit discharges & public corridors per bc 1006.1;27-381. noted: at auditorium,4 emergency exit lighting inoperative.
Jul 13, 2020 · Penalty $1,562
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: illumination for exits;exit discharges & public corridors per bc 1006.1;27-381 existing emergency exit lights are not operational when tested throughout entire
Sep 18, 2019 · Penalty $625
Resolve - Class - 2
Sec. 28-301.1 failure to provide natural or mechanical ventilation to occupied spaces per mc 401.2. at room 111f switch board observed 2 desks in illegally converted closet space being used as office space w/o
Sep 18, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: use of prohibited door &/or hardware per bc 1008.1.8;27-371(j). illegal hardware on doors includes the use of kickstops bolts,chains,& anything that culd cause
Sep 18, 2019 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. security chain fence & gate at sidewalk near loading deck to exit 10 was hit by truck & is in danger of falling. the post to the hinge for the left gate is una
Sep 18, 2019 · Penalty $625
Resolve - Class - 2
Reissue#35336358l failure to maintain bldg in code compliant manner. @boiler room in cellar there are a couple of inches of standing water,clogged floor drains,broken sump pumps,& a broken water pump to push
Sep 18, 2019 · Penalty $1,562
Resolve - Class - 2
Reissue#35336357j exit doors not self closing. exit doors throughout school in various locations have broken hardware,are in disrepair & are not fire proof self closing doors. at 3rd fl,stairs#a,b,i,at 2nd floo
Sep 18, 2019 · Penalty $1,562
Resolve - Class - 2
Construction superintendent failed to perform duties per code-construction super daily log book-inadequate. at time of inspection on a active jobsite currently at foundation phase,upon reviewing daily log book
Aug 9, 2019 · Penalty $2,500
Resolve