roofy

Violations at 82-68 164 Street

Queens, NY 11432 · BBL 4-06858-0001 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

The newest 50 of 423 DOB violations. The city keeps the complete history.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 22, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 22, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 18, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 18, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 18, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 18, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 18, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 18, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 18, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2020

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 internal high pressure boiler inspection

    Mar 16, 2020

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 external high pressure boiler inspection

    Mar 16, 2020

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 external high pressure boiler inspection

    Mar 16, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 15, 2019

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 23, 2019

    Dob violation - resolved

ECB violations

The newest 50 of 63 ECB violations. The city keeps the complete history.

  • Class - 2

    Exp 1 active driveway for ems first responders w/sws,pipe sf,chain link fence and vert netting obstructing view for drivers when vehicles exit facility.observed no blind mirrors in place and no warning signs fo

    Oct 15, 2022 · Penalty $3,155

    Active
  • Class - 2

    Exp 1 observed loose nets not covering opening above fence for site in facade opearations,hazards of debris/materials going through opening unto driveway/public sidewalk striking vehicles/pedestrians.code stipu

    Oct 15, 2022 · Penalty $3,125

    Active
  • Class - 2

    Exp1 observed 3 foot by 8 foot opening in chain link fence hazard of public gaining access to work zone area facade operations w/suspended sf not lower to sws deck/ground, unsecured to building(3314.10.1)hazard

    Oct 15, 2022 · Penalty $1,250

    Active
  • Class - 2

    Exp1 observed suspend.sf left suspended,not secured,stipulated per code-at end of shift-shall be lowered to the street/sws deck or shall be secured to roof/building in accordance design drawings required by sec

    Oct 15, 2022 · Penalty $1,250

    Active
  • Class - 2

    Failure to file acceptable amended cycle 8b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #811512.rem:file acceptable report

    Aug 1, 2018

    Resolve
  • Class - 1

    Failure to provide the corrected elevator landing signs and diagram signs on each elevator landing signs and diagram signs on each elevator landing. failure to provide elevator identification signs letters 3 in

    Feb 20, 2018

    Resolve
  • Class - 1

    Failure to install photoluminescent exit path marking in high rise building. rem: install photoluminescent exit path markings as per requirement.

    Feb 20, 2018

    Resolve
  • Class - 1

    Failure to provide the corrected elevator landing signs and diagram signs on each elevator landing. failure to provide elevator identification sign letters 3 inches high. failure to provide combined elevator la

    Feb 20, 2018

    Resolve
  • Class - 1

    Failure to provide elevator identification sign letters 3 inches high. failure to provide the corrected elevator landing signs and diagram signs on each elevator landing. rem: provide and install signage as per

    Feb 20, 2018

    Resolve
  • Class - 2

    Failure to file a final inspection for completed work within 1 year ofpermit expiration. premises under alt2 #420503994 which permits expir ed on 12-31-13 application filed for renovations of portions of 3rd le

    Feb 5, 2018 · Penalty $4,000

    Active
  • Class - 2

    Failure to file annual certification that cooling tower 1000001972 hasbeen inspected,tested,& disinfected,& that a maintenance plan has beendeveloped & implemented by 11/1/16. remedy: file annual certification

    Jun 20, 2017

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Nov 13, 2014

    Resolve
  • Class - 2

    Exit door #2 off hinges and detached from frame, door inoperable, interference w/exit flow. remedy: repair door

    Jul 26, 2013

    Resolve
  • Class - 2

    Illegal hardware on exit passageway door leading to kitchen staff area2 flr, key cylinder in place. remedy: remove cylinder

    Jul 26, 2013

    Resolve
  • Class - 2

    Cert of occupancy no#402043178t005 has expired on 4/10/12 and bldg being occupied by student teachers and stuff time of insp rem; obtain valid c/o or discontinue illegal occupancy

    May 31, 2012

    Resolve
  • Class - 1

    Supervision or use of rigging equipment w/o a riggers license.note:no waiver or rigger on site

    Mar 17, 2010

    Resolve
  • Class - 2

    Failure to file an architect/engineer report certifying exit/directional signs are connected to emergency power source/storage battery equipment. remedy: file architect/engineer report.

    Jan 27, 2010 · Penalty $4,000

    Active
  • Class - 1

    Failure to file affidavits and/or comply w/other requirements set forth for photoluminescent exit path marking. remedy: comply w/requirements of reference standards (rs) 6-1.

    Sep 25, 2008

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments nb #402043178,shoring plan #402869883 a temporary construction pit was created to hold contaminated water approx. 20-25'deep.

    Aug 22, 2008

    Resolve
  • Class - 1

    Job #nb 402043178 failure to provide protection at sides of excavationnoted: throughout job site numerous area where no sheeting,shoring or bracing are provided + found angle of repose from greater than 45 to s

    Aug 22, 2008

    Resolve
  • Hazardous

    Dept of transportation permit for street/sidewalk closing not posted. expired.

    Mar 2, 2008

    Resolve
  • Hazardous

    Failure to provide contractor's sign

    Mar 2, 2008 · Penalty $250

    Resolve
  • Hazardous

    No permit for sidewalk shed

    Mar 2, 2008

    Resolve
  • Hazardous

    Hazardous, cease use. b4b, 51. 51- safety valves not lifting at set pressure set pressure for one at 245 psi & 2nd one at 250 psi. vavles did not lift until 270 psi.

    Sep 13, 2006

    Resolve
  • Hazardous

    Hazardous, cease use. b4b, 51. 51- safety valves not lifting at set pressure set pressure for one at 245 psi & one at 250 psi. valves did not lift until 270 psi

    Sep 13, 2006

    Resolve
  • Non-hazardous

    Failure to safe guard public and property affected by construction operations pipe scaffolding on top of side walk shed is six tiers high two tiers of scaffolding collapsed onto 164th street four tiers in dange

    Jan 11, 2003 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to physicaly remove construction debris in a safe manner work noted. steel beam approx 12' long and masory nord being pushed out of 8'x8' opening at northeast sides of building at 7 fl by small bulldove

    Dec 13, 2002 · Penalty $500

    Resolve
  • Hazardous

    Failure to maintain exterior building wall defect is; facades facing to grand central pkwy, 164st, specifically, displaced masonry untils, masonry supported on ununtels, cracked bricks, missing mortar. remedy:

    Feb 25, 2002

    Resolve
  • Non-hazardous

    Work without a permit. work noted: appl.#401407447- approved. installing sidewalk shed araound building. remedy: obtain a permit.

    Feb 25, 2002

    Resolve
  • Hazardous

    Failure to maintain exterior of building severe cracks in brick masonly on east & north elevation parapet where's resting off angles 1 rans movement in parapet wall's remedy : make safe for public erect side

    Feb 22, 2002

    Resolve
  • Hazardous

    Failure to mantain. defect is concrete slab at loading dock has disconnected parts of concrete shows rusted bars and cracks at beams and slab and signs of leaking. all at the buttom side. also bars appeared

    Apr 17, 2000

    Resolve
  • Non-hazardous

    Failure to submit a 4th round technical report: periodic inspection ofexterior walls & appurtenances as required by ll 10 of 1980 & the deptof bldgs rules & regulations. remedy: file the required report.

    Mar 3, 1999

    Resolve
  • Non-hazardous

    Failure to submit a fourth round technical report periodic inspection of ecterior walls and appurtenances as required by local law 10of 80 and the dept of buildings rules and regulations remedy file the require

    Dec 21, 1998

    Resolve
  • Hazardous

    Failure to provide protection at sides of excavation sheeting and shoring stop all work remedy provide protection make safe immediately

    Dec 7, 1998 · Penalty $5,000

    Resolve
  • Hazardous

    Failure to safeguard public and property affected by demolition operations. noted no guard rail provided around foundation from 6'-0' deep with a 25'-0'deep stair opening in the cellar of building d.

    Aug 5, 1998 · Penalty $5,000

    Resolve
  • Hazardous

    Failure to protect safe guard public and property affected by demolit-ion operations in that a 12'-0'x15-0'x14'-0' deep was left open and not protected by a guard rail on building c. on the ground fl. remedy

    Aug 5, 1998 · Penalty $5,000

    Resolve
  • Hazardous

    Failure to remove in excess of 25 cubic yards of combustible debris stored on site noted 4 30 cubic on site filled with combustible debrisno empty container for remainder of combustible debris. remedy:

    Aug 5, 1998 · Penalty $2,500

    Resolve
  • Non-hazardous

    Demolition work without a permit. noted 2 buildings 4 stories high. known as building c and building d. demolished to grade under permit #400851404-dm issue on 04-30-98.

    Aug 5, 1998 · Penalty $2,500

    Active
  • Hazardous

    Failure to provide 24 hour notice prior to the start of demolition operations noted building d a 4 story building demolished to grade. remedy: provide 24 hour notice.

    Aug 5, 1998 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to provide 24 hour notice prior to the star of demolition operations noted building c a 4 story building demolished to grade remedy: provide 24 hour notice

    Aug 5, 1998 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to submit a 4th round technical report: periodic inspection ofexterior walls & appurtenances as required by ll 10 of 1980 & the deptof bldgs rules & regulations. remedy: file the required report.

    Jun 3, 1998

    Resolve
  • Non-hazardous

    Work w/o a permit. work noted: renovation at 2nd fl rooms #217, 218, 219, 220 & 221. additional sheetrock walls built, doors & ceiling levels have been changed. remedy: obtain a permit or restore premises.

    Mar 13, 1998

    Resolve
  • Non-hazardous

    Work without a permit. work noted: 1-#n-1st fl-converted gymnasium into class rms. 2-#n-8th fl-converted school of nursing into offices. 3-#a-7th fl-converted medical into offices. remedy: obtain a permit.

    Jan 28, 1998

    Resolve
  • Non-hazardous

    75u,30o,57o, 75-perform 5 year test and file elevator 3 form with this office

    Dec 17, 1997

    Resolve
  • Non-hazardous

    75u,30o, 57o, 75-perform 5 year test and file elevator 3 form with this office

    Dec 17, 1997

    Resolve
  • Non-hazardous

    57o,74w-provide lock for secondary door.

    Dec 17, 1997

    Resolve
  • Non-hazardous

    74o,75t, 74-clean car top 75-perform 5 year test and file elevator 3 form with this office

    Dec 17, 1997

    Resolve
  • Non-hazardous

    50y,57o,02l,

    Dec 17, 1997

    Resolve
  • Non-hazardous

    57o,30b,50y,

    Dec 17, 1997

    Resolve
  • Non-hazardous

    57o,50y,40o,

    Dec 17, 1997

    Resolve