roofy

Violations at 79-11 146 Street

Queens, NY 11367 · BBL 4-06672-0057 · Back to the property

HPD housing violations

The newest 50 of 61 HPD violations. The city keeps the complete history.

  • CImmediately hazardous

    Remove device preventing door from being self-closing wood wedge at fire door at public hall, 3rd story

    Apr 23, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Remove device preventing door from being self-closing wood wedge at fire door at public hall, 2nd story

    Apr 23, 2025

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 16, 2015

    Closed — Violation dismissed
  • BHazardous

    M/d law abate the nuisance consisting of base board moulding separating from floor in the 1st room from east located at apt 1l, 1st story, 1st apartment from west at north

    May 27, 2007 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color east & north wall in the 1st room from east located at apt 1l, 1st story, 1st apartment from west at north

    May 27, 2007 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls at bulkhead to roof pub hall.

    May 21, 1999

    Open — Nov certified late
  • BHazardous

    Replace with new the missing concrete platform for free fall of dropladder at west side of bldg.

    May 21, 1999

    Open — Nov certified late
  • BHazardous

    Remove all encumbrances consisting of household items at bulkhead of roof.

    May 21, 1999

    Open — Nov certified late
  • BHazardous

    Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the north side of bldg under fire escape.

    May 21, 1999

    Open — Nov certified late
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 3 sty balcony at south stack of west wall.

    Jul 28, 1998

    Open — Nov certified late
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall kitchen wall bathroom & ceiling 1 sty apt 1m. , section '' ''

    Jul 8, 1994 · Apt 1M

    Open — Nov certified late
  • BHazardous

    Repair or replace the smoke detector defective 1 sty apt 1m gutierrez. , section '' ''

    Jul 8, 1994 · Apt 1M

    Open — Nov certified late
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling south wall bsmt apt at north south west room .

    Apr 9, 1994

    Open — Nov certified late
  • BHazardous

    M/d law abate the nuisance consisting of foul oder emanatins from door bsmt apt at center west room.

    Apr 9, 1994

    Open — Nov certified late
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls of south west room closet bsmt apt at north.

    Apr 9, 1994

    Open — Nov certified late
  • BHazardous

    Replace with new the missing wall cabinets bsmt apt at north kitchen.

    Apr 9, 1994

    Open — Nov certified late
  • BHazardous

    Abate the nuisance consisting of vermin roaches bsmt apt at north.

    Apr 9, 1994

    Open — Nov certified late
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls ceiling bsmt apt at north center north room.

    Apr 9, 1994

    Open — Nov certified late
  • BHazardous

    Properly repair with similar material the broken or defective woodfloor north west room bsmt apt at north.

    Apr 9, 1994

    Open — Nov certified late
  • CImmediately hazardous

    Repair the leaky and/or defective faucets kitchen sink and bathroom in bathroom 1 sty apt 1j er1 fixed. , section '' ''

    Jan 9, 1994 · Apt 1J

    Open — Nov certified late
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall and ceiling of center room basement apt 1. , section '' ''

    Nov 22, 1993 · Apt 1

    Open — Nov certified late
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling of rear north room of basement apt 1. , section '' ''

    Nov 22, 1993 · Apt 1

    Open — Nov certified late
  • BHazardous

    Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the at northeast fixture rear east yard.

    Nov 9, 1993

    Open — Nov certified late
  • BHazardous

    Provide mailbox at 1 sty vestibule for cellar rear apt.

    Nov 4, 1993

    Open — Nov certified late
  • BHazardous

    M/d law abate the nuisance consisting of stationary column installed floor to ceiling boiler room at cellar rear.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    Repair the broken or defective connection wasteline sink kitchen at cellar apt rear.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    Repair the broken or defective connection wasteline ceiling center room cellar apt rear er1.

    Nov 4, 1993

    Open — Nov certified late
  • BHazardous

    Abate the nuisance consisting of vermin mice thruout cellar rear apt.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the furniture wood etc at north and south room cellar room.

    Nov 4, 1993

    Open — Nov certified late
  • BHazardous

    Arrange and make self-closing the doors street rear cellar entrance and cellar apt entrance.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    M/d law abate the nuisance consisting of steam in electrical outlet center room cellar apt er1.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    M/d law abate the nuisance consisting of concealed ceiling leak at bathroom cellar apt er1.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    M/d law abate the nuisance consisting of leaky around metal window frame at kitchen cellar apt er1.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    M/d law abate the nuisance consisting of concealed leaky ceiling and wall northwest room cellar apt er1.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    M/d law abate the nuisance consisting of concealed leak and extremely hot steam in ceiling floor and wall center room cellar apt er1.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color wall kitchen at cellar apt rear er1.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling bathroom at cellar rear apt er1.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling northwest room at cellar rear apt er1.

    Nov 4, 1993

    Open — Nov certified late
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and wall north center room cellar rear apt er1.

    Nov 4, 1993

    Open — Nov certified late
  • BHazardous

    Replace with new the missing cabinet kitchen wall at cellar apt rear.

    Nov 4, 1993

    Open — Nov certified late
  • BHazardous

    Abate the nuisance consisting of vermin roaches thruout basement apt.

    Nov 4, 1993

    Open — Nov certified late
  • BHazardous

    Properly repair with similar material the broken or defective floor thruout basement apt cellar.

    Nov 4, 1993

    Open — Nov certified late
  • BHazardous

    Section 12 m/d law discontinue the storage of combustible material at cellar center hallway.

    Nov 4, 1993

    Open — Nov certified late
  • BHazardous

    Repair the broken or defective connection locknut at wasteline at sink apt 1 cellar kitchen. , section '' ''

    Aug 17, 1993 · Apt 1

    Open — Nov certified late
  • BHazardous

    Properly repair with similar material the broken or defective parquet floor apt 1 cellar center room north. , section '' ''

    Aug 17, 1993 · Apt 1

    Open — Nov certified late
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling walls apt 1 cellar center and west room. , section '' ''

    Aug 17, 1993 · Apt 1

    Open — Nov certified late
  • BHazardous

    Abate the nuisance consisting of vermin roaches rear basement apt thruout apt.

    Jul 6, 1993

    Open — Nov certified late
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls ceilings rear basement apt thruout apt.

    Jul 6, 1993

    Open — Nov certified late
  • BHazardous

    Repair or replace the smoke detector missing 1 sty southeast apt 1d mr lipton. located at apt 1d

    Jun 23, 1993 · Apt 1D

    Open — Nov certified late
  • CImmediately hazardous

    Provide ready access to buildings heating system key locked door to boiler from rear yard.

    Jun 23, 1993

    Open — Nov certified late

DOB building violations

6 DOB violations, newest first.

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active

ECB violations

No ECB violations on record