Violations at 144-36 Gravett Road
Queens, NY 11367 · BBL 4-06527-0026 · Back to the property
HPD housing violations
20 HPD violations, newest first.
- BHazardous
Properly repair the source and abate the evidence of a water leak ceiling at cellar
Apr 26, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling at cellar
Apr 26, 2025
Closed — Violation closed - BHazardous
Remove the illegal fastening at metal security door in the entrance located at apt 1, 1st story, 1st apartment from east at south
Apr 26, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Refit door in the entrance located at apt 1, 1st story, 1st apartment from east at south
Apr 26, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Apr 26, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Apr 26, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet lower level in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Apr 26, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling, upper and lower level in the private hallway located at apt 1, 1st story, 1st apartment from east at south
Apr 26, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling, lower level in the 2nd room from north at east located at apt 1, 1st story, 1st apartment from east at south
Apr 26, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Apr 26, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and east wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Apr 26, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east at south located at apt 1 upper level, 1st story, apartment at south
Mar 4, 2015 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 1 upper level, 1st story, apartment at south
Mar 4, 2015 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north at east located at apt 1 upper level, 1st story, apartment at south
Mar 4, 2015 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 1 upper level, 1st story, apartment at south
Mar 4, 2015 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the foyer located at apt 1 lower level, 1st story, apartment at south
Mar 4, 2015 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 1 lower level, 1st story, apartment at south
Mar 4, 2015 · Apt 1
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story
Nov 21, 2014 · Apt 1FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling (2 sty apt. duplex apt.) in the entire apartment located at apt 1fl, 1st story
Nov 21, 2014 · Apt 1FL
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling (at 2 sty duplex apt.) in the entire apartment located at apt 1fl, 1st story
Nov 21, 2014 · Apt 1FL
Closed — Violation closed
DOB building violations
1 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 13, 2015
Dob violation - dismissed
ECB violations
4 ECB violations, newest first.
- Class - 2
Failure to comply w/commissioner's order contained in summons/viola tion #35310993p issued on 06/28/2018 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01 (d)(2). an acceptable cer
Apr 9, 2019 · Penalty $625
Resolve - Class - 3
Failure to maintain building in code compliant manner.observed at exposure#1(front)roof gutter is dripping rain water onto neighbors front porch.gutter appears to be leaking.rem:repair and/or replace.
Jun 28, 2018 · Penalty $500
Resolve - Class - 2
Fail to maintain bldg in code compliant manner:re installation/maintance of plumbing materials/equipment of plumbing materials per bc 102.3-27-962.observed on 02/07/15 @ 9:20am in bsmt-illegal rubber cap on was
Feb 7, 2015 · Penalty $500
Resolve - Class - 1
Work w/o a permit.observed on 02/07/15 @ 9:15am in bsmt-new gas boiler,gas hot water heater & gas stove w/ gas piping,water piping no dob permit on file-photos taken.rem:obtain a permit or restore to prior lega
Feb 7, 2015 · Penalty $1,600
Resolve