Violations at 208-02 Cross Island Parkway
Queens, NY 11360 · BBL 4-05843-0140 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
44 DOB violations, newest first.
- Construction other optional
Bc notice of order to stop work immediately due to special progress inspection agency withdrawal of application #q00610042-i1. stop all work immedatly and make site safe.
Nov 14, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2020
Dob violation - resolved - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 27, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 31, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2011
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - dismissed - Construction other optional
C-construction other optional
May 19, 2010
Dob violation - active - Construction other optional
C-construction other optional
Feb 5, 2010
Dob violation - active - Construction other optional
Work w/out permit
Feb 2, 2010
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2008
Dob violation - resolved - Construction other optional
C-construction other optional
Feb 26, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2003
Dob violation - resolved - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 1992
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 1991
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatorrequired
#(35) provide access to elevator motor zoom for a computer inspec tion to be made
Feb 2, 1990
Dob violation - resolved - Elevator elevatorrequired
(04) repair direction arows in car (47)remove all new elevator storage in motor room
Jan 26, 1989
Dob violation - resolved - Construction other optional
C-construction other optional
Mar 30, 1988
Dob violation - dismissed
ECB violations
20 ECB violations, newest first.
- Class - 2
Failure to comply with commissioner's order contained in summons/violation#35446156k issued on 11/8/2019,and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible certifi
Feb 3, 2021 · Penalty $1,250
Resolve - Class - 3
Work wihtout a permit.noted:at rear erected a metal storage shed approx.10 ft l x 3 ft w x 11 ft h with(2)access doors.
Nov 8, 2019 · Penalty $500
Resolve - Class - 2
Altered bldg occupied w/o a valid c/o. bldg altered under alt type 1) job #400480868. all work completed and bldg is occupied as a strip mall. job not signed off c/o (final), never obtained - note - a temp c/o
Apr 27, 2012 · Penalty $2,500
Active - Class - 3
Work does not conform to approved construction documents or amendments.noted: job #420176449/a2/dwg's dated 4/20/2010 1)2nd flr. gymboree ply & music children center art room & music room installed wall to ceil
Jul 11, 2011 · Penalty $200
Active - Class - 2
New building occupied w/expd tco note: occupied strip mall,7 eleven, ridgewood savings etc in use & occupied w/exp tco #40480868t018 expired on 6/28/09. remedy: obtain valid c of o.
Feb 25, 2011 · Penalty $2,500
Resolve - Class - 1
New bldg occupied w/o a valid c/o. noted: c/o #40480868t018 expired 6.28.09. 15 retail stores are being operated. remedy: obtain valid c/o.
Dec 1, 2010 · Penalty $5,000
Active - Class - 3
24b,50; 50 ceiling in boiler room must be fire proof (repair)
Apr 19, 2010
Resolve - Class - 1
Work w/o a permit. noted: at 2nd flr west demo'd interior partitions, exposing electric - wires & panels, removed service equipment, leavinguncapped gas lines at various locations. demo'd area is approx
Feb 2, 2010 · Penalty $8,000
Resolve - Class - 2
67x10.100x10 67x10 in car emergency ph inoperative repair 100x10 pi position indicatorinoperative
Sep 2, 2009
Resolve - Class - 2
02x10.100y13.69m7.100m7 02x10 in car emergency ph. inoperative 100y13 plunger oil leak seal 100m7 provide fire extinguisher inmotor rm 100m7 provide elevator co. info sticker
May 12, 2009
Resolve - Class - 2
02x10.70o02.71q03.100m07 02x10 in car alarm bell doesn't work 70o02 remove water from the pit 100m07 provide capacity plate in the car
Mar 4, 2009
Resolve - Non-hazardous
Failure to comply with the commissioners order to correct violating condition & file certificate of correction with nyc dept of bldgs for ecb notice of violation #34217975z, 38160657y.remedy:correct violating
Feb 26, 2008 · Penalty $500
Resolve - Non-hazardous
66y02,63m07,60m07,86bb05,84x10,17m11. (63) disconnect sw. (60) serviceco. name (84) phone.
Sep 26, 2006 · Penalty $180
Resolve - Non-hazardous
57y11,57o02,74m07. 57y- cylinder packing seal leaking. 57o- clean up pit oil and water. 74m- provide outside communications.
Jun 26, 2000 · Penalty $350
Resolve - Non-hazardous
Operation of place of assembly without a current permit. remedy: obtain place of assembly permit.
Oct 6, 1999 · Penalty $2,500
Resolve - Non-hazardous
Failure to post sign with occupant loads. occupancy sign not posted. remedy: post occupancy sign.
Oct 6, 1999 · Penalty $2,500
Resolve - Non-hazardous
57y57y
Apr 1, 1998 · Penalty $180
Resolve - Non-hazardous
07m,57z-provide safty edge.
Jan 19, 1995 · Penalty $1,000
Resolve - Non-hazardous
11q, 30z, 35p.
May 14, 1993 · Penalty $200
Resolve - Non-hazardous
14p,35p.#14 provide allen screw.
Oct 15, 1991 · Penalty $150
Resolve