roofy

Violations at 43-01 170 Street

Queens, NY 11358 · BBL 4-05428-0037 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

47 DOB violations, newest first.

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 26, 2019

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 24, 2018

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2017

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2017

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2016

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2016

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 18, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2015

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 6, 2014

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 3, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 7, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 28, 2010

    Dob violation - resolved
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 26, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 26, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 3, 2006

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 8, 2005

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 1, 2000

    Vw*-violation - work w/o permit dismissed
  • Plumbing none

    P-plumbing none

    Feb 2, 1999

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Nov 5, 1997

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Nov 22, 1995

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 22, 1995

    Dob violation - dismissed
  • Construction other optional

    Jv

    Dec 21, 1989

    Dob violation - active

ECB violations

43 ECB violations, newest first.

  • Non-hazardous

    Failure to safeguard public and property affected by construction operation. (osha 1926. 452 (w)(e) "no screw jacks"

    Jun 3, 2008 · Penalty $1,500

    Resolve
  • Non-hazardous

    Failure to safeguard public and property affected by construction operations. "no tie-ins to structures" (osha 1926. 451(c)(ii)

    Jun 3, 2008 · Penalty $1,500

    Resolve
  • Non-hazardous

    27-1042(g)(1) scaffold does not meet building code standards. "no guard rail"

    Jun 3, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    27-1042(a)(4) scaffold does not meet building code standards. "pipe frame sitting on cider blocks" no mud sills

    Jun 3, 2008 · Penalty $800

    Resolve
  • Hazardous

    Work w/o a permit demo violation noted:at time of inspec. bldg was demolished with a new bldg under construction on the lot.there was no work or activity.dob records show there were three structures on the lot

    Sep 17, 2007

    Resolve
  • Hazardous

    Work w/o a permit demo violation noted:at time of inspec. bldg was demolished with a new bldg under const. on the lot.there was no work or activity.dob records show there were structures on the lot & only one

    Sep 17, 2007

    Resolve
  • Non-hazardous

    Work w/o a permit. work noted: expired permit 8'high wood const fence in place thru-out premises under fence permit #401995070 which expired 12/31/06. nb #402319362. remedy: renew permit.

    Jan 10, 2007 · Penalty $500

    Resolve
  • Hazardous

    Work w/o a permit (demolition) violation noted: at time of inspection,bldg was demolished, with a new two story bldg under construction. there was no work or activity. dob record show, no demolition permit was

    Apr 19, 2006

    Resolve
  • Non-hazardous

    Failure to provide panic hardware in place of assembly. 1st floor premises garage converted to church. occupied more 80) peoples. at time of inspection not observed panic hardware or exit sign or lighting.

    Sep 1, 2005 · Penalty $350

    Resolve
  • Hazardous

    Failure to provide a least two means of egress. 1st floor premises garage converted to church. occupied more 80) peoples no p.a. permit. no secondary means of egress. remedy: provide required means of egress.

    Sep 1, 2005 · Penalty $400

    Resolve
  • Non-hazardous

    Place of assembly contrary to approved plans. dob records indicates 1st floor premises to garage. pemit #402125179 to convert existing dwelling revoked 05/16/05. now garage converted to church. occupied more 80

    Sep 1, 2005 · Penalty $250

    Resolve
  • Non-hazardous

    Work without a permit. work noted: at attic level premises installed water and waste lines for a 3) piece bathroom (toilet, sink, tub) also at 1st floor front premises installed store front with door (glasses

    Sep 1, 2005

    Resolve
  • Non-hazardous

    Occupancy contrary to dept. of building records. dob records indicatespremises to be garage 1st floor and 1) family apt. (care taker) 2nd floor, attic not occupied illegal occupancy noted: at 1st floor premises

    Sep 1, 2005

    Resolve
  • Non-hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved number of families. dept of building records indicates premises to be garage 1st floor and 1) family care take apt 2nd floor,

    Sep 1, 2005

    Resolve
  • Non-hazardous

    Occupancy contrary to build dept records. garage converted into place of worship and residence. remedy: discontinue illegal use or amend c of o.

    Aug 31, 2005 · Penalty $800

    Resolve
  • Hazardous

    Work without a permit work noted removed garage doors and installed glass double doors installed exterior roll own gate interior partitions for entrance clothing closet alt 2 dissapproved 11/13/00 permit

    Aug 31, 2005

    Resolve
  • Non-hazardous

    Failure to file tr-1 prior to start of controlled work for alt1-402125179.no controlled responsibilities files for;welding,high strength bolts and structural stability.iron work is 80% complete at cellar,1st an

    Jun 22, 2005 · Penalty $350

    Resolve
  • Non-hazardous

    Alteration permit:plans required:all appl.shall be accompanied by sucharch,struct,and mechan.plans as necessary.no structural plans found for horizontal and vertical structural iron work,either permanently or t

    Jun 22, 2005 · Penalty $400

    Resolve
  • Non-hazardous

    Failure to comply with stop work order #050405c0703cs.remedy:comply with stop work order noted:stop all work immediately

    Jun 21, 2005 · Penalty $1,500

    Resolve
  • Non-hazardous

    Failure to safely and properly remove materials/debris from construction site defects noted:6ft pilesof masonary debris,plaster sheetrock,lumber,metal studs,siding,tiles rubbish,steel beams,rebar,q-deck through

    Jun 21, 2005 · Penalty $500

    Resolve
  • Non-hazardous

    Work w/out a permit work noted work done under permit # 401841897 exp 9-29-5 alt noted removed all of 1 fl and added new steal beam joist and i beams and add to foundation walls more than 50 % this bldg falls

    Dec 14, 2004

    Resolve
  • Hazardous

    Failure to perform adequate housekeeping heavy accumulation of const debris insible & outsid throuout. remedy: perform housekeeping. remove the debris

    Sep 17, 2004

    Resolve
  • Non-hazardous

    Work doesn't conform to approved plans work noted: (1)existing extention at south approx. 9' x 20' x 9' & exist extent at the west approx 8' x 12' x 9' been removed, excavated. remedy: stop all work: amend plan

    Sep 17, 2004

    Resolve
  • Non-hazardous

    Failure to provide approved plans at time of inspection noted application# 401841897az work noted extension of existing work structual steelwith multiple penatrations to structure foundation penatrations w/out

    Jul 26, 2004 · Penalty $130

    Resolve
  • Non-hazardous

    Work without a permit.work noted.removal of an existing garage door.construction of exterior masonary wall to replace garage door,with the installation of a window and door at the facade.rem:obtain all necessar

    Aug 1, 2000 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work w/o a permit. work noted: 1 1/2 stories erected making garage 2 1/2 stories high. note: at 2nd fl level full partition walls erectedcreating a kitchen w/ a gas stove. note: at attic leel full partition

    Jun 9, 1999 · Penalty $800

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by the bldg dept records. illegal occupancy noted: garage being used as an acupuncture clinic at 1st fl.noted: at 2nd fl level being used for storage.

    Jun 9, 1999 · Penalty $800

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by the building department records.at the time of inspection found accupuncture clinic at cellar level ofpremises. remedy: discontinue illegal use or amend the c. of o.

    Mar 10, 1999 · Penalty $2,500

    Resolve
  • Hazardous

    Work without a permit. work noted on east side of premises. a structure was constructed approx 28 feet wide by 40 feet deep 2 1/2 stories high structure is completely finished inside and out and being used as

    Mar 6, 1999 · Penalty $2,500

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by the building department records.illegal occupancy noted at east side yard of dwelling, a building was constructed approx 28' wide 40' deep 2 1/2 stories high. this illegal

    Mar 6, 1999 · Penalty $2,500

    Resolve
  • Hazardous

    Residence altered for occupancy as a dwelling for more than the legal-ly approved # of families. bldg. dept. records indicate residence is legally approved for one family. residence now altered for occupancy

    Feb 28, 1999 · Penalty $14,300

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by building dept. records. illegal occupancy noted: legal 1 family converted to 10 sro's. note: at first floor level 3 sro's, at second floor level 4 sro's, at attic level 3

    Feb 28, 1999 · Penalty $800

    Resolve
  • Hazardous

    Failure to maitnain plumbing and or appurtenances hazardous new gas piping installed from 170-04 43 ave to 170-08 43 ave inorder to supply fas to boiler and hot water heater by a illegal connection to gas pipin

    Feb 2, 1999 · Penalty $2,500

    Resolve
  • Hazardous

    Plumbing work without a permit. in the cellar rough plumbing installed for bathroom and sink without permit. obtain a permit if feasible or restore to prior legal condition. obtain plumbing permit for remedy.

    Feb 2, 1999 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintian plumbing and or appurtenances hazardous gas piping altered at drip tee of hot water heater in order to make new connection to supply gas to make new connection to supply gas to 170-08 43 ave

    Feb 2, 1999

    Resolve
  • Non-hazardous

    Work without a permit. garage door removed. store front installed (glass& aluminum) at 1st story.

    Nov 5, 1997 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work without a permit work noted at garage door area removed garage door and installed 3'wx5'hx picture window where garage door existed and installen next to the window installed 3'x7' entrance door. remedy: o

    Aug 7, 1996 · Penalty $350

    Resolve
  • Non-hazardous

    Work without a permit work noted garage door removed store front (glass + aluminum) installed at 1st sty. remedy: obtain a permit if feasible or restore premises to prior legal condition.

    Jan 4, 1996 · Penalty $1,000

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by the building dept. records from a one car garage to a real estate office bayside realty one person present at time of inspection. remedy: discontinue illegal use or amend c

    Oct 17, 1995 · Penalty $800

    Resolve
  • Non-hazardous

    Work without a permit work noted:(1) removed grage door installed commercial store front/glass window/door (2) constructed partitions w/sheet rock creating office in garage. remedy: obtain a permit if feasible

    Oct 17, 1995 · Penalty $350

    Resolve
  • Non-hazardous

    Altered building occupied without a valid c of o alt184/87. remedy: discontinue the illegal occupancy.

    Jun 13, 1994 · Penalty $875

    Resolve
  • Non-hazardous

    Altered building occupied without a valid certificate of occupancy: premises used as a business without current c. of o. alt# 184-87. remedy: obtain a valid c of o

    Feb 17, 1993 · Penalty $350

    Resolve
  • Non-hazardous

    Occupancy premises without a cert. of occupancy under approved alt. remedy: discontinue the illegal occupancy.

    May 1, 1989 · Penalty $250

    Resolve