143-23 Ash Avenue
Queens, NY 11355BBL 4-05184-0009Map
Owner of record: Korean Presbyterian Church Of Queens, In C.
143-23 Ash Avenue is a religious facility built in 2023 in Queens, 11355. The owner of record is Korean Presbyterian Church Of Queens, In C.. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 0
- ECB violations
- 30
- HPD complaints
- 9
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 0
No DOB violations on record
ECB violations · 30
- Class - 1
Bc3307.1 failure to provide&maintain protection of pedestrian.@4story incomplete&expired nb permit site observe incomplete facade@4th fl adjacent to sidewalk on ash ave with no pedestrian protection sidewalk sh
Jun 2, 2025 · Penalty $5,000
Active - Class - 2
Upon approaching the site, i observed the construction fence had collapsed onto the sidewalk at exposure #1, approx:20ft, blocking sidewalk and in danger of further collapse, scews and wall-ties exposed,fence w
Dec 18, 2023 · Penalty $1,000
Resolve - Class - 2
Observed jobsite fence at exp#1 with multiple fence panels warped, loose, and/or partially detached from posts, multiple screws protruding out into the pedestrian walkway/sidewalk, multiple viewing panels not b
Sep 5, 2023 · Penalty $1,030
Resolve - Class - 1
Observed ongoing excavation operations of a trench approx. 9ft deep at exposure 3 of jobsite. no guardrails provided as per bc3304.4.4 for a drop more than 6ft.obserevd unsafe work conditions in excavation mor
Jun 15, 2023 · Penalty $2,500
Resolve - Class - 2
Observed a platform set-up in the stairwell at the second floor approx. 14ft x 8ft constructed with pipe scaffold, metal stud and ply wood, upon request to review the p.e. design drawing, i was informed no desi
Mar 30, 2023 · Penalty $625
Resolve - Class - 2
Observed a mobile suppor6ted scaffold set-up on wheels on the 2nd floor, scaffold was approx.:30ft high and was not tied-in or diagonally braced as required, also on the same floor was a baker scaffold approx.:
Mar 30, 2023 · Penalty $625
Resolve - Class - 2
Observed the construction fence @ exposure #2 had collapsed approx. 16ft, upon applying pressure to the remaining fence left standing it was swaying in and out and was not stable, posts were not secured as requ
Mar 30, 2023 · Penalty $500
Resolve - Class - 1
Failure to safeguard public from site hazards.@4 story nb site observe public access restriction measures at exposure#2/4 @ash avenue adjacent to occupied neighbor properties not in place with open excavation,u
Jan 31, 2023 · Penalty $6,250
Resolve - Class - 1
Failure to provide job site fence. observed missing job site fence at exp#4 towards adjacent occupied building this condition made the site accessible for unauthorized personal creating a hazard for public wond
Nov 21, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to maintain docs to be kept onsite-imposed loads letter atoi on active 4sty jobsite under nb permit420663482,it was observed supported scf (illegible) on overhead protection exp3 which is aprx48'.upon i
Dec 15, 2021 · Penalty $625
Resolve
Show 20 more ↓
- Class - 1
Failure to display docs to be kept onsite-design drawing overhead protection atoi on 4sty jobsite under nb permit420663482,it was observed overhead protection@[email protected] request for design drawings none
Dec 15, 2021 · Penalty $625
Resolve - Class - 1
Bc3314.1 scfs atoi on 4sty jobsite under nb permit420663482,it was observed supported scfs aprx48'@exp2&3.upon insp it was observed multipleviolating conditions on said scf,missing planks,missing pins&great amt
Dec 15, 2021 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved p.e construction documents.as noted:at time of inspection at an active jobsite,observed concrete placed onmetal deck from ground level to fourth level.upon request of concrete
Jul 21, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to provide tr3 design mix for lightweight concrete.as noted:attime of inspeciton at an active jobsite,observed concreted placed on metal deck from ground level to fourth floor level.upon request of conc
Jul 21, 2021 · Penalty $1,250
Resolve - Class - 1
Bc33017-failure to provide approved p.e construction documents.as noted:at time of inspeciton at an active jobsite,observed metal stair caseplace from cellar level to fourth floor level.upon request of metal st
Jul 21, 2021 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit/ work noted/approx 7000 sq ft of horizontal deveopment of vacant lot into parking lot including - drywell for drainageand stripping for car parking occupancy contrary to that allowed by
Jan 26, 2005 · Penalty $800
Resolve - Non-hazardous
Occupancy constrary to that or building dept records illegal occupancynoted vacant lot is now cosuerted to parking lot lot is paved and lined with wrought iron ken of surrounding it. remedy; discontinue illegal
Sep 9, 2002 · Penalty $1,000
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy or building department records.vacant lot used as a parking lot.remedy:discontinue illegal use or amend c of o
Jun 25, 2001 · Penalty $800
Active - Non-hazardous
Illegal use in a residential district vacant land is paved with black top and surrounded by wrought iron fence with no parking sign posted and is being used as a parking lot for church goers across the street.n
Apr 1, 2001 · Penalty $480
Active - Non-hazardous
Occupancy contrary to that allowed by building dept. record. demo permit #400791372 for demolilition of structure now land is paved with black top and used as a parking lot. remedy: discontinue illegal use or a
Jan 31, 2001 · Penalty $800
Resolve - Non-hazardous
Illegal use in a residential disrtict use is parking lot paved with black top and surrounded by fence with no parking sigh, contrary to zoning use r3-2. remedy: discontinue illegal use.
Jan 31, 2001 · Penalty $480
Active - Non-hazardous
Illegal use in a residential district illegal use noted. entire premises used as a parking lot after legally demolishing residential building. advertising sign found. signage "all day parking."
Nov 15, 1999 · Penalty $10,000
Active - Non-hazardous
Fence exceeds permitted height. noted: throughout property fence approx 6'6" high. remedy: conform to dob code.
Nov 15, 1999 · Penalty $2,500
Active - Non-hazardous
Illegal use in a residential district. using entire premises as a parking lot after legally demolishing residential bldg. advertising signs found, signage, "all day parking," "only parking, stay until 7:0
Apr 30, 1999 · Penalty $480
Resolve - Hazardous
Failure to remove combustible debris. noted approx. 150 cu. yds of combustible debris piled up and strewn all over site consisting of brokenup lumber no container's to store debris remedy: remove combustible de
Dec 9, 1997 · Penalty $500
Resolve - Hazardous
Failure to provide 24 hour notice prior to the commencement of demolition operations noted: roof and rear part of 2nd floor wall demolished remedy: provide 24 hour notice.
Dec 2, 1997 · Penalty $500
Resolve - Hazardous
Failure to remove all glass prior to the commencement of demolition operations noted: one window on 2nd floor and 10 windows on 1st fl. in place. roof and rear half of 2nd fl. demolished. stop all work remedy:
Dec 2, 1997 · Penalty $500
Resolve - Non-hazardous
Failure to remove all glass prior to the commencement of demolition operations. stop order issued 11-17-97 for glass in place on 1st and 2ndfl. removed 2nd story and glass still in place in 10 windows 2nd doors
Nov 21, 1997 · Penalty $500
Resolve - Non-hazardous
Failure to provide 24 hour notice prior to the commencement of demolition operations. noted door remove handrails on stairs and interior partitions demolished. remedy: provide 24 hour notice.
Nov 17, 1997 · Penalty $500
Resolve - Non-hazardous
Failure to remove all glass prior to the commencement of demolitions. noted glass in 7 windows on 2nd floor and all glass in on 1st floor. roof partitions stair hand rails demolished stop all work remedy: rem
Nov 17, 1997 · Penalty $500
Resolve
Complaints
- Heating
Heat related
Dec 12, 2011 · Apt NA
Close - General
Stairs
Jul 9, 2009 · Apt 1FLR
Close - General
Stairs
Jun 30, 2009 · Apt 1FLR
Close - General
Stairs
Jun 9, 2009 · Apt 1
Close - Plumbing
Water-leaks
Jun 9, 2009 · Apt 1
Close - Nonconst
Vermin
Jun 9, 2009 · Apt 1
Close - Electric
Wiring
Jun 9, 2009 · Apt 1
Close - Plumbing
Water-leaks
Jun 9, 2009 · Apt 1
Close - Heating
Heat related
Jan 29, 2009 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Religious facility (M1)
- Year built
- 2023
- Floors
- —
- Residential units
- —
- Building area
- 23,398 ft²
- Lot area
- 21,340 ft²
- Zoning
- R3X
- Community board
- 407
- Council district
- 20
- Block / lot
- 5184 / 9
- Assessed value
- $2,303,550
- Landmark / historic district
- No
Questions about 143-23 Ash Avenue
Who owns 143-23 Ash Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Korean Presbyterian Church Of Queens, In C..
Does 143-23 Ash Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 143-23 Ash Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 143-23 Ash Avenue built?
City records list 2023 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.