Violations at 29-01 149 Street
Queens, NY 11354 · BBL 4-04812-0012 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
8 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed
ECB violations
27 ECB violations, newest first.
- Class - 2
Found hb smith gas fired steam boiler corrodec piping off header,water feeder not operating pop safety corroded and no discharge pipe correct all violating conditions and submit a certificate of correction
Sep 22, 2025 · Penalty $1,250
Active - Class - 2
Safety relief valves missing discharge piping, gauge glass cock missing handle and missing gauge glass rod. correct all violating conditions and submit a certificate of correction.
Jul 31, 2023 · Penalty $625
Active - Class - 2
Reissue#35381194r date:03.21.2019 failure to maintain building in codecompliant manner.at the time of inspection i observed and noted chinging room and ladis toilet roof water penetrating in different places.pl
Apr 18, 2022 · Penalty $1,562
Resolve - Class - 2
Pedestrian protection does not meet code specification. observed sidewalk shed at non-active job site. sws not maintained as required. bottom of posts close to the footing,the wood blocking are rusting away fro
Apr 11, 2022 · Penalty $2,400
Resolve - Class - 2
Failure to obtain a temporary permit prior to installation/use of tempequipment. observed sidewalk shed erected at exposure#1&4. no filing in bis&dob now for permit for the sws found. remedy:obtain temp const p
Apr 11, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code compliant manner. changing room&ladies toilet roof water penetrating in different places. place is covered by sidewalk shed,entrance gate is defective and sidewalk way throu
Mar 21, 2019
Resolve - Class - 3
Reissue 35101251p failure to maintain observed: at main entrance,masonry columns missing mortar,stones stepped. rmdy: maintain premises.
Apr 29, 2015
Resolve - Class - 3
Reissue #35022672h.failure to maintain:@ entrance to athletic field decorative madonary columns have missing(mortar)w/ settling/displacementof concrete blocks.rem:repair defect or remove.
Sep 5, 2014
Resolve - Class - 2
Reissue: 34981854x 9' feet high stone masonry column is missing mortarbetween blocks located by the main entrance. remedy: replace missing mortar.
Jul 9, 2013
Resolve - Class - 3
Reissue #34907015j defective stone masonry. at entry the 9' stone masonry columns have loose & missing mortar joints. rem:repair stone masonry.
Jun 8, 2012
Resolve - Class - 2
Reissue : 34861894y exterior glass windows are cracked & defective @ the mens & womens bathroom. remedy: repair &/or replace windows
Mar 16, 2011
Resolve - Class - 2
Reissue : 34861975x exterior concrete block columns is missing mortar and loose located by the main entrance. remedy : repair concrete blockcolumns
Mar 16, 2011
Resolve - Class - 2
Failure to maintain. observed: at entry columns adjacent restroom, mising mortar, loose, shifted blocks. remedy: maintain bldg.
Jul 20, 2010
Resolve - Class - 2
Reissue 34791528n. failure to maintain. observed: broken/cracked glasswindows at men's/ladies rooms. remedy: maintain bldg.
Jul 20, 2010
Resolve - Class - 2
Reissue: 34692334l exterior windows are broken & the glass are broken /vracked at the men's & ladies bathroom. remedy: maintain exterior windows.
Jun 10, 2009
Resolve - Class - 2
Reissue: 34692336p the brick facade at the men's & women's bathroom is missing mortar & has stress cracks. remedy: repair/replace brick facade.
Jun 10, 2009
Resolve - Class - 2
Reissue: 34692335n the plaster is spalling off the walls & ceiling located in the men's & woman's bathroom. remedy: repair/replace plaster.
Jun 10, 2009
Resolve - Class - 2
Reissue 34586796r failure to maintain wall or appunrtenances noted:mortar is missing leaving open gaps for the brick on exposure of the fromentrance ii.remedy:maintain exterior bldg wall
Jul 30, 2008
Resolve - Class - 2
Reissue 34586795p failure to maintain bldg in code-compliant manner noted:plaster is spalling on the ceiling in the women's bathrm remedy:repair & or replace plaster wall & ceiling
Jul 30, 2008
Resolve - Class - 2
Reissue 34586794n failure to maintain bldg walls or appunrtenances noted:windows are cracked & broken at the mens 7 women batrm remedy:maintain exterior bldg wall
Jul 30, 2008
Resolve - Non-hazardous
Reissue:34519103p.exterior bricks are cracked leaving gaps between mortar & bricks located on the 1st floor on the side of the bldg.remedy:repair/replace bricks.
Jul 2, 2007
Resolve - Non-hazardous
Reissue:34519102n.interior plaster is cracked & spalling located in teh boys bathroom & locker room.remedy:repair/replace plaster wall & ceiling.
Jul 2, 2007
Resolve - Non-hazardous
Reissue: 34519101l.windows throughout the bldg are rotten & defective on the 1st floor.remedy:replace/repair windows.
Jul 2, 2007
Resolve - Hazardous
Failure to maintain exterior of bldg. brick wall throughout bldg has cracks & spalling. remedy:repair defective brick work
Mar 31, 2006
Resolve - Hazardous
Failure to maintain interior of bldg. plaster wall & ceiling are spalding & cracking & lifting of wall & ceiling.remedy:repair defective walls & ceiling throughout
Mar 31, 2006
Resolve - Hazardous
Failure to maintain exterior of bldg windows. noted:windows throughoutbldg rotted and in disrepair. remedy:replace windows that are in disrepair
Mar 31, 2006
Resolve - Hazardous
Failure to provide 24hr notice prior to demolishing viewing stands at park remedy:provide 24hr notice of start of demolition.
May 5, 2000 · Penalty $800
Resolve