roofy

14-34 110 Street

Queens, NY 11356BBL 4-04044-7501Map

Owner of record: Unavailable Owner

14-34 110 Street is a condominium built in 2002 in Queens, 11356. It has 34 residential units across 7 floors. The owner of record is Unavailable Owner. HPD has recorded 223 housing violations here, most recently on September 5, 2026. 36 of the 50 most recent violations are still open.

HPD violations
223
DOB violations
72
ECB violations
28
HPD complaints
250

Available now in this building

Show 7 more ↓

What to know

Concern
14 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 223

  • B

    Properly repair or replace the broken or defective electrical outlet at south wall in the 1st room from east located at apt 4d, 4th story, 3rd apartment from east at south

    Sep 5, 2026 · Apt 4D

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower sash spring balance at south wall window in the 2nd room from east located at apt 4d, 4th story, 3rd apartment from east at south

    Sep 5, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective counter balance at lower sash both windows in the 1st room from east at south located at apt 4d, 5th story, 3rd apartment from east at south

    Sep 3, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective counter balance at lower sash both windows in the 1st room from east at north located at apt 4d, 5th story, 3rd apartment from east at south

    Sep 3, 2026 · Apt 4D

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Feb 25, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system near mailbox at public hall, 1st story

    Feb 25, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door , 1st story

    Feb 25, 2026

    Closed — Violation closed
  • C

    Remove the illegal fastening unacceptable electromagnetic locking device installed at vestibule door to building at public hall, 1st story

    Feb 15, 2026

    Open — Nov sent out
  • B

    Provide security in the event of power outage by means of an acceptable mechanical heavy-duty lock and latch set at vestibule door to building at public hall, 1st story

    Feb 15, 2026

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at west located at apt 5l, 5th story, 5th apartment from west at north

    Jan 31, 2026 · Apt 5L

    Open — Nov sent out
  • B

    Provide security in event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door leading to public hall , 1st story

    Jan 30, 2026

    Open — Nov sent out
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule door leading to public hall , 1st story

    Jan 30, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system near mailbox at public hall, 1st story

    Jan 30, 2026

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jan 30, 2026

    Open — Nov sent out
  • B

    Replace with new the missing electrical outlet cover at south wall at public hall, 1st story

    Jan 30, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door at south wall leading to residential stair 4 at public hall, 1st story

    Jan 30, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2025

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5l, 5th story, 5th apartment from west at north

    Aug 15, 2025 · Apt 5L

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5l, 5th story, 5th apartment from west at north

    Aug 15, 2025 · Apt 5L

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 5l, 5th story, 5th apartment from west at north

    Aug 15, 2025 · Apt 5L

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 5l, 5th story, 5th apartment from west at north

    Aug 15, 2025 · Apt 5L

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective ceiling light fixture in the kitchen located at apt 5l, 5th story, 5th apartment from west at north

    Aug 15, 2025 · Apt 5L

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective glass at vestibule door to public hall , 1st story

    Jun 18, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 13, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges 1st from west at north labelled 'elevator motor room' at public hall, 1st story

    Jun 12, 2025

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the 4th room from east located at apt 5h, 5th story, 1st apartment from west at north

    May 30, 2025 · Apt 5H

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 5h, 5th story, 1st apartment from west at north

    May 30, 2025 · Apt 5H

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from east located at apt 5h, 5th story, 1st apartment from west at north

    May 30, 2025 · Apt 5H

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the private hallway located at apt 5h, 5th story, 1st apartment from west at north

    May 30, 2025 · Apt 5H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 5h, 5th story, 1st apartment from west at north

    May 30, 2025 · Apt 5H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from east located at apt 5h, 5th story, 1st apartment from west at north

    May 30, 2025 · Apt 5H

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the kitchen located at apt 5h, 5th story, 1st apartment from west at north

    May 30, 2025 · Apt 5H

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5h, 5th story, 1st apartment from west at north

    May 30, 2025 · Apt 5H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 5h, 5th story, 1st apartment from west at north

    May 30, 2025 · Apt 5H

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at refuse room , 6th story

    May 23, 2025

    Open — Not complied with
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system near mailbox at public hall, 1st story

    May 23, 2025

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    May 23, 2025

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective glass pane at building vestibule leading to public hall , 1st story

    May 23, 2025

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at north located at apt 5l, 5th story, 5th apartment from west at north

    May 4, 2025 · Apt 5L

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 5l, 5th story, 5th apartment from west at north

    May 4, 2025 · Apt 5L

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 5l, 5th story, 5th apartment from west at north

    May 4, 2025 · Apt 5L

    Closed — Violation dismissed
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed on vestibule door , 1st story

    Apr 30, 2025

    Open — Nov sent out
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock set vestibule door , 1st story

    Apr 30, 2025

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from east at north located at apt 5i, 5th story, 2nd apartment from west at north

    Apr 3, 2025 · Apt 5I

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at north located at apt 5i, 5th story, 2nd apartment from west at north

    Apr 3, 2025 · Apt 5I

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east located at apt 5i, 5th story, 2nd apartment from west at north

    Apr 3, 2025 · Apt 5I

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak ceiling in the 2nd room from east located at apt 5i, 5th story, 2nd apartment from west at north

    Apr 3, 2025 · Apt 5I

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 5i, 5th story, 2nd apartment from west at north

    Apr 3, 2025 · Apt 5I

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 5c, 5th story, 2nd apartment from east at south

    Mar 19, 2025 · Apt 5C

    Open — Nov sent out

DOB building violations · 72

  • Construction other optional

    Vacate order due to; cracked/spalling bricks at multiple locations above teraces on exposure #1 east elevation. remedy: vacate all terraces at exposure #1 east elevation. restrict access to vacated areas

    May 8, 2025

    Dob violation - active
  • Construction other optional

    Filure to maintain bldg in code compliant manner.exp#1 multiple brk face spalling or spalled. cracks in peir @exp1.exp3 broken window spalling cracked mortar joints at exp#4 observed crack brick face multiple locations. in parking lot observed sink hole. remedy: repair and replace

    May 2, 2025

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
Show 40 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 13, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 16, 2022

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9a unsafe report filed

    Dec 7, 2021

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 5, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 3, 2020

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 4, 2019

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 10, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 10, 2018

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - active
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 22, 2017

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)

    Feb 16, 2017

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 4, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 4, 2017

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - active
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 2, 2016

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2016

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2016

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)

    Jun 1, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 12, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2015

    Dob violation - resolved

ECB violations · 28

  • Class - 2

    At time of inspection, i observed on the sidewalk shed @exp#1, a realty company advertising condominium's on the front and right side. this is contrary to bc 3301.9.7 other signs prohibited. remove illegal sign

    Sep 21, 2026 · Penalty $2,500

    Active
  • Class - 2

    At time of inspection, i observed a missing blindspot mirror under the sidewalk shed @exp#1 for the left side driveway in order to see pedestrians walking from past the corner of the adjacent building @exp#4. t

    Sep 21, 2026 · Penalty $2,400

    Active
  • Class - 2

    Failure to file acceptable amended cycle 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #919062. agg1: prior nov 37026603p under 28-302

    Apr 20, 2026 · Penalty $10,000

    Active
  • Class - 2

    Aot observed sidewalk shed / temporary construction equipment installed at exp1 with a expired permit. q00323556-i1-sh issued on 04/04/2023 and expired on 04/04/2024., renew permit

    Aug 11, 2025

    Resolve
  • Class - 2

    Class 2. in-car communication device is not working properly, needs tobe repaired.

    Mar 17, 2025 · Penalty $625

    Resolve
  • Class - 2

    Class 2. in-car communication device is not working properly, needs to be repaired.

    Mar 17, 2025 · Penalty $625

    Resolve
  • Class - 2

    Failure to file acceptable amended cycle 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#919062.rem:file acceptable report.

    Jan 16, 2024 · Penalty $6,250

    Active
  • Class - 2

    Pedestrian protection does not meet code specifications. note: atoi of a (5) floor building, i observed a sidewalk shed erected at expo#1 with (2) driveways missing high visibility markings as code requires,cre

    Aug 9, 2023 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to take requsted safety measures to protect public safety fromdocumented unsafe facade.note:as previous violation#35663782z issued on 07-18-2022 and violation#35663783k issued on 07-18-2022 and as of to

    Sep 30, 2022 · Penalty $25,000

    Active
  • Class - 1

    Unlawful acts.failure to comply with commissioner's order note:respondent failed to comply with previously issued ecb#35651382l dated on 05-20-2022 which requires respondent to comply with commissioner's order

    Jul 18, 2022 · Penalty $6,250

    Resolve
Show 18 more ↓
  • Class - 1

    Failure to maintain building exterior walls or appurtenances.note:at time of inspection observed defective-spalled brickwork and open sections on facade in multiple locations with defective-inadequate temporary

    Jul 18, 2022 · Penalty $2,500

    Active
  • Class - 1

    Unlawful acts.failure to comply with commissioner's order.respondent failed to comply with previously issued ecb#35647139j dated 3/28/22 stated safety measures shall be in place to protect public safety.as of t

    May 20, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to take required safety measures to protect public safety from documented unsafe facade.note:qewi submitted unsafe filing #911697 dated 2/18/22 as of today 5/20/22 no safety measures in place at exp #2

    May 20, 2022 · Penalty $10,000

    Active
  • Class - 1

    Failure to take & provide adequate safety measures sidewalk shed netting fence controlled access zone where require to protect & secure public safety from documented unsafe facade.the unsafe notification(fisp 3

    Mar 28, 2022 · Penalty $10,000

    Active
  • Class - 1

    Failure to take&provide adequate safety measures sws netting fence controlled access zone where require to protect&secure public safety.fromdocumented unsafe facade.unsafe notification (fisp3) deport from pe/ra

    Jan 22, 2022 · Penalty $10,000

    Active
  • Class - 3

    Failure to post building exterior wall certification as required under1 rcny 103-04.at time of inspection certificate was not posted in the lobby of vestibule.remedy:post building exterior wall certificate in l

    Nov 23, 2021 · Penalty $500

    Active
  • Class - 1

    Failure to take and provide adequate safety measures,sidewalk shed,netting,fence,controlled access zone where required to protect and securepublic safety from documented unsafe facade.the unsafe notification(fi

    Nov 23, 2021 · Penalty $10,000

    Active
  • Class - 2

    At exposure 4 (right side) at 3rd floor setback, bricks are spalling and pieces have fallen to grade., maintain exterior building wall

    Mar 5, 2020 · Penalty $6,250

    Active
  • Class - 2

    3b1, 40m7: (3,m,1) device stops abruptly when taking off and coming into the landing. (40,m,7) no access to the machine room control space super not on site keys missing talk with the super on the phone

    Dec 9, 2019 · Penalty $625

    Resolve
  • Class - 1

    Cease use 7.x.10,6.h.11,59.m.7,5.h.11=7-x-10 zon elock inoperative allowing the car door to be opened at all times causing a hazardous condition repair /6-h-11; roller (that activates gates swicth worn ) repla

    Jul 18, 2019

    Resolve
  • Class - 2

    05a10. restrictor is not opertive. this is safety device to ensure elevator passengers safety.

    Jul 12, 2017 · Penalty $500

    Resolve
  • Class - 2

    05x10;07l01:(05x10)restrictor is not operative;(07l01)needs to be ajusted car door reopening

    Feb 13, 2017

    Resolve
  • Class - 2

    95x19 restrictor is not operative.

    Dec 16, 2016

    Resolve
  • Class - 2

    05x10,59b01,58l10,71x11. 05x10- restrictor is not operative; 59b01- need be adjust brake; 58l10- worm gear need be repair.

    Dec 16, 2016

    Resolve
  • Class - 1

    97x10 failure to maintain bldg in code compliant manner service equipment elevator as per bc 3001.2 and27-9987. dob records show the only elevator in bldg or section of bldg as active. upon inspection the dev

    Nov 25, 2016 · Penalty $5,000

    Active
  • Class - 1

    97x10 failure to maintain bldg in code compliant manner;service equipment elevator as per bc3001.2 nd 27-987. dob records show the only elevator in bldg (section of building) as active.upon inspection,the dev

    Aug 1, 2016 · Penalty $5,000

    Active
  • Class - 2

    05x10,99bb05,70o02,70x10,03i10. 05x10-repair door zone lock; 70o02-remove water from th pit; 70x10-repair pit light; 03110-repair damaged directional arrows inside the elevator.

    Feb 12, 2014 · Penalty $2,500

    Resolve
  • Class - 2

    05x10,39x10,40p16. 05x10-repair door zone lock; 39x10-repair top of a car light.

    Feb 12, 2014 · Penalty $2,500

    Resolve

Complaints

  • Electric

    Outlet/switch

    Oct 13, 2026 · Apt 4D

    Open
  • General

    Ventilation system

    Oct 13, 2026 · Apt 4D

    Open
  • Paint/plaster

    Wall

    Oct 13, 2026 · Apt 4D

    Open
  • Door/window

    Window frame

    Aug 25, 2026 · Apt 4D

    Close
  • Plumbing

    Radiator

    Aug 25, 2026 · Apt 4D

    Close
  • Electric

    Outlet/switch

    Jun 29, 2026 · Apt 4D

    Close
  • Electric

    Power outage

    Feb 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 6C

    Close
  • Plumbing

    Water supply

    Feb 4, 2026 · Apt 5L

    Close
  • Water leak

    Heavy flow

    Jan 28, 2026 · Apt 5F

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    Jan 28, 2026 · Apt 5F

    Close
  • Unsanitary condition

    Mold

    Jan 28, 2026 · Apt 5F

    Close
  • Door/window

    Door

    Jan 28, 2026 · Apt 5F

    Close
  • Water leak

    Slow leak

    Jan 28, 2026 · Apt 5F

    Close
  • Electric

    Power outage

    Dec 20, 2025 · Apt 5L

    Close
  • Flooring/stairs

    Floor

    Dec 20, 2025 · Apt 5L

    Close
  • Water leak

    Slow leak

    Dec 20, 2025 · Apt 5L

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 5, 2025 · Apt 4A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 9, 2025 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Oct 15, 2025 · Apt 5L

    Close
  • Electric

    Wiring

    Aug 25, 2025 · Apt 5L

    Close
  • Door/window

    Door frame

    Jul 31, 2025 · Apt 5L

    Close
  • Door/window

    Window frame

    Jul 31, 2025 · Apt 5L

    Close
  • Flooring/stairs

    Floor

    Jul 31, 2025 · Apt 5L

    Close
  • Unsanitary condition

    Pests

    Jul 31, 2025 · Apt 5L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 31, 2025 · Apt 5L

    Close
  • Unsanitary condition

    Sewage

    Jul 25, 2025 · Apt 6G

    Close
  • Safety

    Fire escape

    Jun 12, 2025 · Apt 5L

    Close
  • Unsanitary condition

    Pests

    Jun 12, 2025 · Apt 5L

    Close
  • Flooring/stairs

    Floor

    Jun 12, 2025 · Apt 5L

    Close
  • Flooring/stairs

    Floor

    May 27, 2025 · Apt 5L

    Close
  • Plumbing

    Radiator

    May 23, 2025 · Apt 6G

    Close
  • Flooring/stairs

    Floor

    May 20, 2025 · Apt 5H

    Close
  • Paint/plaster

    Ceiling

    May 20, 2025 · Apt 5H

    Close
  • Door/window

    Door

    Apr 30, 2025 · Apt 5L

    Close
  • Unsanitary condition

    Mold

    Apr 30, 2025 · Apt 5L

    Close
  • Flooring/stairs

    Floor

    Apr 30, 2025 · Apt 5L

    Close
  • Unsanitary condition

    Mold

    Apr 25, 2025 · Apt 5L

    Close
  • Flooring/stairs

    Floor

    Apr 25, 2025 · Apt 5L

    Close
  • Door/window

    Door

    Apr 18, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Apr 10, 2025 · Apt 6G

    Close
  • Paint/plaster

    Ceiling

    Apr 1, 2025 · Apt 5I

    Close
  • Heat/hot water

    Apartment only

    Mar 18, 2025 · Apt 5C

    Close
  • Water leak

    Slow leak

    Mar 18, 2025 · Apt 5C

    Close
  • Paint/plaster

    Ceiling

    Mar 18, 2025 · Apt 5C

    Close
  • Unsanitary condition

    Mold

    Mar 18, 2025 · Apt 5C

    Close
  • Electric

    Power outage

    Mar 18, 2025 · Apt 5C

    Close
  • Heat/hot water

    Apartment only

    Mar 5, 2025 · Apt 4E

    Close
  • Door/window

    Window frame

    Feb 21, 2025 · Apt 4E

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
2002
Floors
7
Residential units
34
Building area
69,447 ft²
Lot area
64,000 ft²
Zoning
M2-1
Community board
407
Council district
19
Block / lot
4044 / 7501
Assessed value
$4,626,608
Landmark / historic district
No

HPD registration #428929, last renewed Feb 11, 2026.

Questions about 14-34 110 Street

Who owns 14-34 110 Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 14-34 110 Street have violations?

Yes. NYC HPD has recorded 223 housing violations at this property.

Is 14-34 110 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 14-34 110 Street built?

City records list 2002 as the year it was built.

How many apartments are in 14-34 110 Street?

It has 34 residential units and 47 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.