roofy

Violations at 90-60 Union Turnpike

Queens, NY 11385 · BBL 4-03880-0097 · Back to the property

HPD housing violations

27 HPD violations, newest first.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
  • CImmediately hazardous

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Mar 9, 2021 · Apt 2M

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Oct 18, 2017

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective ceramic tiles at the south wall in the bathroom located at apt 3c, 3rd story, 4th apartment from north at east

    Mar 30, 2017 · Apt 3C

    Closed — Violation closed
  • ANon-hazardous

    Properly repair with similar material the broken or defective ceramic tiles at the north wall in the bathroom located at apt 3c, 3rd story, 4th apartment from north at east

    Mar 30, 2017 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective glazing in the battub in the bathroom located at apt 3c, 3rd story, 4th apartment from north at east

    Mar 30, 2017 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at the south wall (1 sq ft) in the kitchen located at apt 3c, 3rd story, 4th apartment from north at east

    Mar 30, 2017 · Apt 3C

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 30, 2017

    Closed — Violation closed
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Mar 30, 2017

    Closed — Violation closed
  • BHazardous

    Arrange and make self-closing the doors , in the entrance located at apt 3c, 3rd story, apartment at east , section ''90-60''

    Sep 27, 2016 · Apt 3C

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair the source and abate the evidence of a water leak at the west wall and ceiling in the bathroom located at apt 3c, 3rd story, apartment at east , section ''90-60''

    Sep 27, 2016 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 3c, 3rd story, apartment at east , section ''90-60''

    Sep 27, 2016 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak , moisture penetrating the south wall in the kitchen located at apt 3c, 3rd story, apartment at east , section ''90-60''

    Sep 27, 2016 · Apt 3C

    Closed — Violation closed
  • ANon-hazardous

    Trace and repair the source and abate the nuisance consisting of mold ... approximately 4 square feet at the south wall in the kitchen located at apt 3c, 3rd story, apartment at east , section ''90-60''

    Sep 27, 2016 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 3c, 3rd story, apartment at east , section ''90-60''

    Sep 27, 2016 · Apt 3C

    Open — Not complied with
  • CImmediately hazardous

    Properly secure the loose ceramic floor tile in the kitchen located at apt 3c, 3rd story, apartment at east , section ''90-60''

    Sep 27, 2016 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective grout at floor in the kitchen located at apt 3c, 3rd story

    Sep 22, 2016 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroom located at apt 3c, 3rd story, section ''90-60'', at south

    Aug 23, 2016 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak south wall in the kitchen located at apt 3c, 3rd story, section ''90-60'', at south

    Aug 23, 2016 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective counter- balance at north window in the 3rd room from north located at apt 3c, 3rd story, section ''90-60'', at south

    Aug 23, 2016 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective counter- balance at noth window in the 2nd room from north located at apt 3c, 3rd story, section ''90-60'', at south

    Aug 23, 2016 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak west wall in the bathroom located at apt 3c, 3rd story, section ''90-60'', at south

    Aug 23, 2016 · Apt 3C

    Closed — Violation closed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 3c, 3rd story, section ''90-60 '', at south

    Aug 23, 2016 · Apt 3C

    Open — Not complied with
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 16, 2015

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective fire retarding ceiling at west garage (parkinglot)

    Mar 3, 2010

    Closed — Violation closed
  • BHazardous

    D26-10.01 adm code replace with new the missing elec interlocking device fireproof vestibule cellar south 90-60 unit.

    Mar 16, 1988

    Closed — Violation closed

DOB building violations

The newest 50 of 60 DOB violations. The city keeps the complete history.

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 28, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 28, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 28, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 28, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 7, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 7, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 7, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 7, 2014

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 14, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 14, 2013

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 11, 2012

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 4, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 19, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 19, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 19, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 19, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 20, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 20, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 20, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 20, 2007

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 27, 2001

    Vw*-violation - work w/o permit dismissed
  • Elevator elevatorrequired

    4p4113

    Oct 23, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    4p4110

    Oct 23, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    4p4112

    Oct 23, 2000

    Dob violation - resolved
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    May 2, 2000

    Dob violation - dismissed
  • Elevator elevatorrequired

    4p4112

    Feb 12, 1999

    Dob violation - resolved
  • Elevator elevatorrequired

    4p4111

    Feb 12, 1999

    Dob violation - resolved
  • Elevator elevatorrequired

    4p4110

    Feb 12, 1999

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations

19 ECB violations, newest first.

  • Class - 2

    Active construction occurring at a nonessential construction site.noteat time of my inspection,observed ongoing construction activities contrary to governor's executive order#202.6,202 and subsequent order and

    Apr 27, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Sec. 28-116.4.1. cease use 97r07- operating device w/o c/compliance, no report of inspection submitted to dob and no witnessing of test by dob,when ready contact dob ([email protected]) to schedule test

    Apr 14, 2012 · Penalty $1,600

    Resolve
  • Class - 2

    44h08 52h11

    Mar 14, 2011 · Penalty $250

    Resolve
  • Class - 1

    Inadequate safety measures operation of hoisting equipment in unsafe manner. noted: upon inspection found numerous defective cables running from underneath of hoisting motors,w/kinks,bird caging on 4 rigs,1 rig

    Feb 10, 2011 · Penalty $4,800

    Resolve
  • Class - 1

    Failure to maintain exterior bldg wall balcony located at apt 9# had section of concrete dislodge at corner support post for railing rem: submit engineers report & make all repairs in a safe and lawful manner

    May 23, 2010 · Penalty $1,000

    Resolve
  • Class - 3

    Failure to maintian bldg in a code compliant manner.noted:@ parking garage-concrete spalling & disloged;exposed & rusting re-bar in various locations throughout, water damage in various locations throughout.rem

    Dec 14, 2009 · Penalty $200

    Resolve
  • Hazardous

    Exit passageway or corridor: total obstruction partial obstruction found at elevator corridor leading to exit door. enclosure of plywood found approx 4 feet wide x 8 feet long x approx 9 feet high with swing ga

    Feb 23, 2008

    Resolve
  • Hazardous

    Work without a permit. work noted: at 15th,17th&a9th floor-punched in three elevatior wall found providing entry door opening for elevation access on odd floors with enclosure evident."stop all work"remedy:make

    Feb 23, 2008

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r c n y 32-03b(5) indicating correction of hazardous condtions described in initial ll11/98 report remedy file an amen

    Aug 31, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this depatment pursuant to rule rcny 32-03b(5), indicating correction of hazardous condition described in initial ll11/98 report. remedy: file an amend

    Jul 27, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll11/98 report.remedy:file an ame

    Jun 25, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y 32-03(5) indicating correction of hazardous conditions described in initial ll10/80 report. rem:file an amende

    May 25, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to provide adequate protection for sidewalk and walkways during construction operations.covered walkway at ground level not sealed with appropriate materials.remedy:stop all construction except to make

    May 4, 2001

    Resolve
  • Hazardous

    Sidewalk shed does not meet building code specification shed not extended 20 feet for building more than 100' in in height.remedy:stop all construction work except to make safe.make safe immediately.conform to

    May 4, 2001 · Penalty $2,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this dept pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous condition described in initial ll10/80report.rem:file an amended report

    Apr 20, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file an ame

    Mar 9, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an

    Jul 14, 2000 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report remedy:file an am

    Jun 19, 2000 · Penalty $400

    Resolve
  • Non-hazardous

    8v1,35s9,74m7. -35 remove rug's from all motor room's, -74 install fire ext.

    Mar 19, 1999

    Resolve