roofy

Violations at 88-66 Myrtle Avenue

Queens, NY 11385 · BBL 4-03870-0124 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

16 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 16, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 19, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 15, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 1, 2006

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed

ECB violations

9 ECB violations, newest first.

  • Class - 2

    Failure to maintain building in code compliant manner. no fire stopping per bc 712.3, 27-345. noted: at basement, ceiling with multiple penetrations in several locations (throughout) remedy: comply with code

    Jul 9, 2018 · Penalty $625

    Active
  • Class - 2

    Exit door not self-closing. noted: (1) exterior fpsc door at 1st fl not self closing when tested (2) at hallway interior fpsc door not self-closing when tested. remedy: comply with code

    Jul 9, 2018 · Penalty $312

    Active
  • Class - 2

    50- "36" boiler not registered after permit is pulled 'bl' then you must have boiler division sign off job. noted: bring up to code

    Jul 6, 2010 · Penalty $500

    Resolve
  • Class - 2

    36,40,50. 50- "36" boiler not registered "after permits pulled 'bl' then you must have boiler division sign off job. note bring up to code.

    Jul 6, 2010 · Penalty $500

    Resolve
  • Class - 2

    36,24b,50,50a. 50- "36" boiler not registered after permit is pulled "bl" then you must have boiler division sign off. 50a- defective valveon supply line. note: bring up to code.

    Jul 6, 2010 · Penalty $500

    Resolve
  • Class - 2

    36,15,24b,32a,50,50a,50b,50c. 50- "36" boiler not registered "after permit is pulled" bl then you must have boiler division sign off job. 50a- not enough fresh air as per code for equipment. *note bring up to c

    Jul 6, 2010 · Penalty $500

    Resolve
  • Class - 1

    Newly installed gas boilers w.o 'bl' work type permit "work w.o a permit" pull full permit for boilers & boiler rm to legalize work. gas enerjet heating boiler model bg4= 75,000 btu's 1= gas enerjet model bg5=

    Jul 6, 2010 · Penalty $1,600

    Resolve
  • Non-hazardous

    50. 50-low water cut off installed above isolation valve (must be installed between isolation valve and boiler)

    Oct 17, 2003

    Resolve
  • Non-hazardous

    50. 50:low water cut off installed above isolation valve (must be installted between isolation valve) and boiler)

    Oct 17, 2003

    Resolve