Violations at 86-18 Union Turnpike
Queens, NY 11385 · BBL 4-03848-0001 · Back to the property
HPD housing violations
The newest 50 of 69 HPD violations. The city keeps the complete history.
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and south wall at public hall, 1st story
Oct 17, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and south wall at public hall, 1st story
Oct 17, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall at public hall, 1st story
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective electric outlet at east wall in the kitchen located at apt c4, 3rd story, 1st apartment from west at north
Oct 17, 2026 · Apt C4
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c4, 3rd story, 2nd apartment from west at north
Oct 17, 2026 · Apt C4
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt c4, 3rd story, 2nd apartment from west at north
Oct 17, 2026 · Apt C4
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 4th room from east located at apt c4, 3rd story, 2nd apartment from west at north
Oct 17, 2026 · Apt C4
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt c4, 3rd story, 2nd apartment from west at north
Oct 17, 2026 · Apt C4
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt c4, 3rd story, 2nd apartment from west at north
Oct 17, 2026 · Apt C4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt c4, 3rd story, 2nd apartment from west at north
Oct 17, 2026 · Apt C4
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt c4, 3rd story, 2nd apartment from west at north
Oct 17, 2026 · Apt C4
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch assembly building entrance door to public hall , 1st story
Aug 21, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 1st story, section at east
Aug 21, 2025
Open — False certification - BHazardous
Properly repair or replace the broken or defective latch assembly at public hall, 1st story, section at east
Aug 21, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch assembly 2nd from east at north door to storage room at public hall, 1st story, section at east
Aug 21, 2025
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective latch assembly compactor closet door at public hall, 1st story, section at east
Aug 21, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch compactor closet door at public hall, 1st story, section at east
Aug 21, 2025
Open — Invalid certification - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt a3, 1st story, 1st apartment from north at east
Aug 21, 2025 · Apt A3
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt a3, 1st story, 1st apartment from north at east
Aug 21, 2025 · Apt A3
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a3, 1st story, 1st apartment from north at east
Aug 21, 2025 · Apt A3
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balconies east stack east side of the building at fire escape, 3rd story
Apr 27, 2025
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt a6, 1st story, 1st apartment from south at west
Dec 22, 2024 · Apt A6
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt a6, 1st story, 1st apartment from south at west
Dec 22, 2024 · Apt A6
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt a6, 1st story, 1st apartment from south at west
Dec 22, 2024 · Apt A6
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a6, 1st story, 1st apartment from south at west
Dec 22, 2024 · Apt A6
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system near or at mailbox at public hall, 1st story
Dec 19, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at basement story at public hall
Dec 19, 2024
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt c1, 3rd story, 2nd apartment from east at south
Dec 19, 2024 · Apt C1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt c1, 3rd story, 2nd apartment from east at south
Dec 19, 2024 · Apt C1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt c1, 3rd story, 2nd apartment from east at south
Dec 19, 2024 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt c1, 3rd story, 2nd apartment from east at south
Dec 19, 2024 · Apt C1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c1, 3rd story, 2nd apartment from east at south
Dec 19, 2024 · Apt C1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt c1, 3rd story, 2nd apartment from east at south
Dec 19, 2024 · Apt C1
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Dec 17, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 17, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Dec 17, 2024
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction material at bulkhead at public hall, 3rd story
Dec 14, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door in the bathroom located at apt c1, 3rd story, 2nd apartment from east at south
Dec 14, 2024 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt c1, 3rd story, 2nd apartment from east at south
Dec 14, 2024 · Apt C1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling in the kitchen located at apt c1, 3rd story, 2nd apartment from east at south
Dec 14, 2024 · Apt C1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt c1, 3rd story, 2nd apartment from east at south
Dec 14, 2024 · Apt C1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c1, 3rd story, 2nd apartment from east at south
Dec 14, 2024 · Apt C1
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Dec 11, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Dec 11, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing , 1st story
Dec 11, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Dec 11, 2024
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door lock , 1st story
Sep 6, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt b4, 2nd story, 2nd apartment from west at north
Sep 6, 2024 · Apt B4
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective upper sash window glass at cellar first window northwest side at front building entrance
Apr 5, 2021
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of air conditioner protruding beyond window sill at 2nd stry balcony at north (building front )
Mar 13, 2021
Open — Nov sent out
DOB building violations
1 DOB violations, newest first.
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations
1 ECB violations, newest first.
- Class - 2
Failure to maintain bldg walls or appurtenances.ini apt b2 (2nd flr) observed water spots & plaster peeling on ceiling 2nd exterior wall caused by water pentrating through exterior brick wall.remedy:repair defe
Sep 12, 2011 · Penalty $2,500
Resolve