78-35 73 Place
Queens, NY 11385BBL 4-03823-0013Map
Owner of record: Unavailable Owner
78-35 73 Place is a two-family home built in 1925 in Queens, 11385. It has 2 residential units across 2 floors. The owner of record is Unavailable Owner. HPD has recorded 35 housing violations here, most recently on December 15, 2021. 31 of the 35 most recent violations are still open.
- HPD violations
- 35
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 12
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 2nd closet from east at south wall door frame in the private hallway located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from north at east wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 5th room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective wood cabinet base at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Nov sent out
Show 25 more ↓
- BHazardous
Properly repair the broken or defective lower window sash at north wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 15, 2021 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and all walls in the bathroom located at apt 2, 2nd story
Apr 13, 2021 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story
Apr 13, 2021 · Apt 2
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective celo-tex tiles at ceiling in the 1st room from east at south located at apt 2, 2nd story
Apr 13, 2021 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass at lower sash north window in the 1st room from east at north located at apt 2, 2nd story
Apr 13, 2021 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2, 2nd story
Apr 13, 2021 · Apt 2
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mold at north wall at bath-tub in the bathroom located at apt 2, 2nd story
Apr 13, 2021 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings and all walls in the entire apartment located at apt 2, 2nd story
Apr 13, 2021 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace the broken or defective watercloset in the bathroom located at apt 2, 2nd story
Apr 13, 2021 · Apt 2
Closed — Violation closed - BHazardous
Replace the broken or defective wasteline at wash basin in the bathroom located at apt 2fl, 2nd story
Apr 2, 2021 · Apt 2FL
Open — Certification postponment denied - BHazardous
Replace with new the broken or defective lower window sash in the 1st room from east at north located at apt 2fl, 2nd story
Apr 2, 2021 · Apt 2FL
Open — Certification postponment denied - BHazardous
Replace with new the broken or defective wasteline at wash basin in the bathroom located at apt 2fl, 2nd story
Apr 2, 2021 · Apt 2FL
Open — Certification postponment denied - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 square feet at north wall around window in the bathroom located at apt 2fl, 2nd story
Apr 2, 2021 · Apt 2FL
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 2 square feet at north wall around window in the bathroom located at apt 2fl, 2nd story original violation 14164159 issued 02-apr-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 2, 2021 · Apt 2FL
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color al walls and ceilings in the bathroom located at apt 2fl, 2nd story
Apr 2, 2021 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2fl, 2nd story
Apr 2, 2021 · Apt 2FL
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin in the bathroom located at apt 2fl, 2nd story
Apr 2, 2021 · Apt 2FL
Open — Certification postponment denied - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 2fl, 2nd story
Apr 2, 2021 · Apt 2FL
Open — Certification postponment denied - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color celotex ceiling tiles and plaster ceiling in the 1st room from east at south located at apt 2fl, 2nd story
Apr 2, 2021 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 2fl, 2nd story
Apr 2, 2021 · Apt 2FL
Open — Certification postponment denied - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 3, 2020
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 2 square feet ceiling, approx 2 square feet west wall,approx 2 square feet niorth wall,approx 2 square feet east wall in the bathroom located at apt 2fl, 2nd story original violation 13747044 issued 30-jul-20 has been upgraded to class b per administrative code ''''27-2017.3a(3)(a) or (b).
Jul 30, 2020 · Apt 2FL
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 square feet ceiling, approx 2 square feet west wall,approx 2 square feet niorth wall,approx 2 square feet east wall in the bathroom located at apt 2fl, 2nd story
Jul 30, 2020 · Apt 2FL
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2fl, 2nd story
Jul 30, 2020 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story
Jul 30, 2020 · Apt 2FL
Open — Certification postponment denied
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Door/window
Window frame
Dec 13, 2021 · Apt 2
Close - Unsanitary condition
Mold
Dec 13, 2021 · Apt 2
Close - Paint/plaster
Ceiling
Dec 13, 2021 · Apt 2
Close - Heat/hot water
Apartment only
Dec 13, 2021 · Apt 2
Close - Plumbing
Basin/sink
Dec 13, 2021 · Apt 2
Close - Plumbing
Toilet
Apr 12, 2021 · Apt TOPFLR
Close - Heat/hot water
Apartment only
Apr 12, 2021 · Apt TOP
Close - Plumbing
Toilet
Mar 31, 2021 · Apt TOPFLO
Close - Paint/plaster
Wall
Mar 31, 2021 · Apt TOPFLO
Close - Heat/hot water
Entire building
Oct 5, 2020 · Apt 1
Close
Show 2 more ↓
- Heat/hot water
Entire building
Jul 24, 2020 · Apt 2FL
Close - Heat/hot water
Entire building
Jul 24, 2020 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1925
- Floors
- 2
- Residential units
- 2
- Building area
- 2,225 ft²
- Lot area
- 2,742 ft²
- Zoning
- R4-1
- Community board
- 405
- Council district
- 32
- Block / lot
- 3823 / 13
- Assessed value
- $68,520
- Landmark / historic district
- No
HPD registration #924122, last renewed Aug 24, 2025.
Questions about 78-35 73 Place
Who owns 78-35 73 Place?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 78-35 73 Place have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 78-35 73 Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 78-35 73 Place built?
City records list 1925 as the year it was built.
How many apartments are in 78-35 73 Place?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.