71-08 72 Street
Queens, NY 11385BBL 4-03688-0011Map
Owner of record: Naguib, Ayman G
71-08 72 Street is a walk-up apartment building built in 1910 in Queens, 11385. It has 3 residential units across 3 floors. The owner of record is Naguib, Ayman G. HPD has recorded 46 housing violations here, most recently on May 6, 2026. 5 of the 46 most recent violations are still open.
- HPD violations
- 46
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 10
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 46
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Nov 14, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
Nov 14, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of shoe racks at public hall, 3rd story
Nov 14, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 14, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 14, 2024
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system incorrect sign material
Nov 14, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing upper and lower window sashes in the bathroom located at apt 3rdfl, 3rd story, 1st apartment from south at west
Sep 17, 2024 · Apt 3RDFL
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3rdfl, 3rd story, 1st apartment from south at west
Sep 17, 2024 · Apt 3RDFL
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 4, 2024
Open — First no access to re- inspect violation
Show 36 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 4, 2024
Open — First no access to re- inspect violation - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Sep 4, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of hook and eye installed on building entrance door to public hall , 1st story
Sep 4, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of hook and eye installed on vestibule door to public hall , 1st story
Sep 4, 2024
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Sep 4, 2024
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Aug 20, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Aug 20, 2024
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling 1st window frame from west at north wall in the 4th room from east at north located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... more that 10 sqft ceiling in the bathroom located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroom located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window sash upper spring balance second window from south at west in the 4th room from east at north located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 3rd room from east located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from east located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at north located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 3rd story
Aug 20, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Aug 20, 2024
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door at public hall, 1st story
Aug 20, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall 1st window frame from west at north wall in the 4th room from east at north located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window sash upper spring balance first window from south at west in the 4th room from east at north located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 3rd room from east located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the bathroom located at apt 3rdflo, 3rd story, 1st apartment from south at west
Aug 20, 2024 · Apt 3RDFLO
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Aug 20, 2024
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 20, 2024
Open — First no access to re- inspect violation - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system not posted at public hall, 1st story
Aug 20, 2024
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 14, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 14, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 1, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 23, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 4, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 15, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 26, 2015
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Non-hazardous
Work w/o a permit. noted: kitchen cabinets,stove,bathroom,interior,partitions. electrical work plumbing work all done for new basement apt w/o 1st obtaining plans approvals or permits.
Sep 25, 2007 · Penalty $250
Resolve - Non-hazardous
Residence alt for occupancy as a dwelling for more then the legally approved number of families. premises converted from 3 family to 4 family dwelling. illegal apt created in basement area w/o any permits
Sep 25, 2007 · Penalty $3,050
Resolve
Complaints
- Water leak
Heavy flow
Aug 19, 2024 · Apt 3RDFLO
Close - Door/window
Window frame
Aug 19, 2024 · Apt 3RDFLO
Close - Plumbing
Bathtub/shower
Aug 19, 2024 · Apt 3RDFLO
Close - Door/window
Window frame
Aug 19, 2024 · Apt 3RDFLO
Close - Unsanitary condition
Mold
Aug 19, 2024 · Apt 3RDFLO
Close - Paint/plaster
Ceiling
Aug 19, 2024 · Apt 3RDFLO
Close - Paint/plaster
Wall
Sep 16, 2023 · Apt 3
Close - Water leak
Heavy flow
Sep 16, 2023 · Apt 3
Close - Unsanitary condition
Mold
Sep 16, 2023 · Apt 3
Close - Unsanitary condition
Pests
Sep 21, 2022 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1910
- Floors
- 3
- Residential units
- 3
- Building area
- 3,675 ft²
- Lot area
- 2,000 ft²
- Zoning
- R4-1
- Community board
- 405
- Council district
- 32
- Block / lot
- 3688 / 11
- Assessed value
- $91,860
- Landmark / historic district
- No
HPD registration #403533, last renewed Aug 30, 2025.
Questions about 71-08 72 Street
Who owns 71-08 72 Street?
The owner of record in NYC Department of City Planning PLUTO data is Naguib, Ayman G.
Does 71-08 72 Street have violations?
Yes. NYC HPD has recorded 46 housing violations at this property.
Is 71-08 72 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 71-08 72 Street built?
City records list 1910 as the year it was built.
How many apartments are in 71-08 72 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.