roofy

74-41 64 Lane

Queens, NY 11385BBL 4-03599-0010Map

Owner of record: 74-41 64th Lane INC.

74-41 64 Lane is a walk-up apartment building built in 1931 in Queens, 11385. It has 4 residential units across 2 floors. The owner of record is 74-41 64th Lane INC.. HPD has recorded 107 housing violations here, most recently on May 6, 2026. 3 of the 50 most recent violations are still open.

HPD violations
107
DOB violations
0
ECB violations
0
HPD complaints
94

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 6, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 107

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 6, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 11, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2024

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jan 26, 2023 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jan 26, 2023 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jan 26, 2023 · Apt 1R

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at apt in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Jan 26, 2023 · Apt 1R

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of house hold items at public hall, 1st story

    Oct 17, 2022

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing hook and eye installed at south wall at vestibule at public hall, 1st story

    Jun 1, 2022

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx 2 square feet ceiling,approx 2 square feet north wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jun 1, 2022 · Apt 1R

    Closed — Violation closed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 5th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Jun 1, 2022 · Apt 1R

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approx 2 square feet ceiling,approx 2 square feet north wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south original violation 15192980 issued 01-jun-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jun 1, 2022 · Apt 1R

    Open — Defect letter issued
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 4th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Jun 1, 2022 · Apt 1R

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustical tiles at ceiling in the 4th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Jun 1, 2022 · Apt 1R

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling (approx. 5 sq ft) in the bathroom located at apt 1r, 1st story, 1st apartment from east at south original violation 15145424 issued 12-may-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    May 12, 2022 · Apt 1R

    Open — Defect letter issued
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling (approx. 5 sq ft) in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    May 12, 2022 · Apt 1R

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    May 12, 2022 · Apt 1R

    Closed — Violation dismissed
  • B

    Abate the infestation consisting of vermin ants in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    May 12, 2022 · Apt 1R

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective tank at water closet in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    May 12, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective vinyl floor covering in the 2nd room from east located at apt 1r, 1st story, 1st apartment from east at south

    May 12, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    May 12, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    May 12, 2022 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair the broken or defective spring balance of lower and upper sashes of window at east wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    May 12, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 5th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Apr 21, 2022 · Apt 1R

    Closed — Violation dismissed
  • C

    Properly repair the broken or defective west 2 window lower sash counter balance in the 5th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Apr 21, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the 2nd room from east located at apt 1r, 1st story, 1st apartment from east at south

    Apr 21, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 21, 2022

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Apr 21, 2022

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Apr 21, 2022

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Apr 21, 2022

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 21, 2022

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Apr 21, 2022

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration celotex tiles at ceiling in the 4th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Apr 21, 2022 · Apt 1R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 4th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Apr 21, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 23, 2022

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of house hold items at public hall, 2nd story

    Mar 23, 2022

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx 2 square feet at ceiling and west wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approx 2 square feet at ceiling and west wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south original violation 15065278 issued 23-mar-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Mar 23, 2022 · Apt 1R

    Open — Defect letter issued
  • A

    Refit door in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood door frame in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation steam pipe riser in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustical drop ceiling in the 5th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak ceiling in the 5th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of lockable slide bolt installed at secondary entrance door in the 5th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak west and north wall in the 5th room from east located at apt 1r, 1st story, 1st apartment from east at south

    Mar 23, 2022 · Apt 1R

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 23, 2022

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Mar 23, 2022

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Safety

    Carbon monoxide detector

    Jan 24, 2023 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Jan 24, 2023 · Apt 1R

    Close
  • Plumbing

    Toilet

    Jan 24, 2023 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Jan 24, 2023 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Jan 24, 2023 · Apt 1R

    Close
  • Safety

    Smoke detector

    Jan 24, 2023 · Apt 1R

    Close
  • Plumbing

    Toilet

    Jan 24, 2023 · Apt 1R

    Close
  • Safety

    Window guard broken/missing

    Jan 24, 2023 · Apt 1R

    Close
  • Door/window

    Door

    Jan 24, 2023 · Apt 1R

    Close
  • Door/window

    Window frame

    Jan 23, 2023 · Apt 1FLRRI

    Close
Show 40 more ↓
  • Door/window

    Window frame

    Jan 23, 2023 · Apt 1FLRIG

    Close
  • Plumbing

    Basin/sink

    Dec 27, 2022 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Dec 27, 2022 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Dec 27, 2022 · Apt 1R

    Close
  • Plumbing

    Toilet

    Dec 27, 2022 · Apt 1R

    Close
  • Door/window

    Door

    Dec 27, 2022 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Oct 13, 2022 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Oct 13, 2022 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Sep 14, 2022 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Sep 14, 2022 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Sep 14, 2022 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Sep 14, 2022 · Apt 1R

    Close
  • Plumbing

    Water supply

    Sep 14, 2022 · Apt 1R

    Close
  • Door/window

    Window frame

    May 2, 2022 · Apt 1R

    Close
  • Plumbing

    Water supply

    May 2, 2022 · Apt 1R

    Close
  • Plumbing

    Toilet

    May 2, 2022 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    May 2, 2022 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Apr 30, 2022 · Apt 1R

    Close
  • Paint/plaster

    Window/frame

    Apr 19, 2022 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Apr 19, 2022 · Apt 1R

    Close
  • Safety

    Smoke detector

    Apr 19, 2022 · Apt 1R

    Close
  • Door/window

    Window frame

    Apr 19, 2022 · Apt 1R

    Close
  • Water leak

    Slow leak

    Apr 19, 2022 · Apt 1R

    Close
  • Door/window

    Door frame

    Apr 19, 2022 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Apr 19, 2022 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Apr 19, 2022 · Apt 1R

    Close
  • Plumbing

    Toilet

    Apr 19, 2022 · Apt 1R

    Close
  • Plumbing

    Water supply

    Apr 7, 2022 · Apt 1R

    Close
  • Plumbing

    Toilet

    Apr 7, 2022 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Apr 7, 2022 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Mar 31, 2022 · Apt 1R

    Close
  • Door/window

    Door frame

    Mar 31, 2022 · Apt 1R

    Close
  • Door/window

    Window frame

    Mar 31, 2022 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Mar 31, 2022 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Mar 31, 2022 · Apt 1R

    Close
  • Water leak

    Heavy flow

    Mar 31, 2022 · Apt 1R

    Close
  • Plumbing

    Toilet

    Mar 31, 2022 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Mar 17, 2022 · Apt 1R

    Close
  • Door/window

    Window frame

    Mar 15, 2022 · Apt 1STFLO

    Close
  • Paint/plaster

    Wall

    Mar 15, 2022 · Apt 1STFLO

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1931
Floors
2
Residential units
4
Building area
3,551 ft²
Lot area
2,642 ft²
Zoning
R5B
Community board
405
Council district
30
Block / lot
3599 / 10
Assessed value
$312,300
Landmark / historic district
No

HPD registration #404771, last renewed Oct 6, 2025.

Questions about 74-41 64 Lane

Who owns 74-41 64 Lane?

The owner of record in NYC Department of City Planning PLUTO data is 74-41 64th Lane INC..

Does 74-41 64 Lane have violations?

Yes. NYC HPD has recorded 107 housing violations at this property.

Is 74-41 64 Lane rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 74-41 64 Lane built?

City records list 1931 as the year it was built.

How many apartments are in 74-41 64 Lane?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.