Violations at 59-28 Norman Street
Queens, NY 11385 · BBL 4-03588-0024 · Back to the property
HPD housing violations
17 HPD violations, newest first.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt baseme, 1st apartment from east at south
May 5, 2023 · Apt BASEME
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt baseme, 1st apartment from east at south
May 5, 2023 · Apt BASEME
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt baseme, 1st apartment from east at south
May 5, 2023 · Apt BASEME
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt baseme, 1st apartment from east at south
May 5, 2023 · Apt BASEME
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt baseme, 1st apartment from east at south
May 5, 2023 · Apt BASEME
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the west wall in the kitchen located at apt baseme, 1st apartment from east at south
May 5, 2023 · Apt BASEME
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the private hallway located at apt baseme, 1st apartment from east at south
May 5, 2023 · Apt BASEME
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at the south wall( approximately 12 square feet) in the private hallway located at apt baseme, 1st apartment from east at south
May 5, 2023 · Apt BASEME
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the south wall in the private hallway located at apt baseme, 1st apartment from east at south
May 5, 2023 · Apt BASEME
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operating double cylinder lock at building entrance metal door at basement
Nov 17, 2022
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at south wall approx 1 square feet at basement in the kitchen located at apt 1, 1st apartment from north at east
Nov 17, 2022 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at bsmt-apt 1, 1st bsmt-apt from east at south
Oct 22, 2022 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective laminated floor tiles in the 2nd room from north located at bsmt-apt 1, 1st bsmt-apt from east at south
Oct 22, 2022 · Apt 1
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Sep 16, 2022
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective laminated wood floor (walking area) in the 3rd room from east located at bsmt-apt 1, 1st bsmt-apt from north at east
Sep 15, 2022 · Apt 1
Closed — Violation closed
DOB building violations
No DOB violations on record
ECB violations
2 ECB violations, newest first.
- Hazardous
Work without permits. wor noted: at basement erected full height partitions creating (2) rooms and a bathroom installed water and waste lines for a 3pc bathroom. (shower) and a residential sink, also installed
Apr 2, 2003
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved # of families building dept of records, which indicate residence legally approved for (2) families residence now altered for occu
Apr 2, 2003 · Penalty $3,050
Resolve