roofy

60-62 Catalpa Avenue

Queens, NY 11385BBL 4-03535-0008Map

Owner of record: Aba Future LLC

60-62 Catalpa Avenue is a walk-up apartment building built in 1909 in Queens, 11385. It has 6 residential units across 3 floors. The owner of record is Aba Future LLC. HPD has recorded 47 housing violations here, most recently on May 7, 2026. 25 of the 47 most recent violations are still open.

HPD violations
47
DOB violations
7
ECB violations
1
HPD complaints
88

What to know

Concern
20 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 47

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story

    Nov 16, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story

    Nov 16, 2025

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective entrance door in the 1st room from north located at apt 3r, 3rd story, 1st apartment from east at south

    Nov 16, 2025 · Apt 3R

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective electric fixtures at ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south

    Nov 16, 2025 · Apt 3R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3r, 3rd story, 1st apartment from east at south

    Nov 16, 2025 · Apt 3R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles. in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Closed — Violation dismissed
  • C

    Remove the illegal fastening consisting of self lockable door handle installed on bulkhead door to roof, 3rd sty at public hall, 3rd story

    Oct 6, 2025

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on bulkhead door to roof at public hall, 3rd story

    Oct 6, 2025

    Closed — Violation dismissed
Show 37 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective west wall electric outlet in the kitchen located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective rubber gasket in the refrigerator in the kitchen located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Open — Not complied with
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color south and west wall in the 4th room from north located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Open — Not complied with
  • A

    Properly repair or replace the broken or defective door frame in the entrance located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on door in the entrance located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq feet on ceiling and window frame in the bathroom located at apt 3r, 3rd story, 2nd apartment from east at south

    Oct 6, 2025 · Apt 3R

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 4, 2022

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective stone lintel at 2nd story south 2 window at front of building.

    Jun 17, 2021

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective stone lintel at 2nd story south 1 window at front of building.

    Jun 17, 2021

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective stone lintel at 3rd story south 2 window at front of building.

    Jun 17, 2021

    Closed — Violation closed
  • I

    Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts #1r, dated april 1, 2020 vacate #153569

    Mar 31, 2020

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 1r, 1st story

    Feb 18, 2020 · Apt 1R

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2018

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Mar 15, 2006 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st closet from north at east wall door, 1st riser from east at south wall, south wall in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Mar 15, 2006 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from west at north wall in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south

    Mar 15, 2006 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from west at north wall in the 2nd room from north located at apt 1r, 1st story, 2nd apartment from east at south

    Mar 15, 2006 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) door frame from east at south wall in the 4th room from north located at apt 1r, 1st story, 2nd apartment from east at south

    Oct 2, 2005 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) door frame from north at east wall, riser from east at south wall in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Oct 2, 2005 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, door frame from west at north wall in the private hallway located at apt 1r, 1st story, 2nd apartment from east at south

    Oct 2, 2005 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) riser from south at west wall in the 2nd room from north located at apt 1r, 1st story, 2nd apartment from east at south

    Oct 2, 2005 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) door frame from east at south wall, north wall in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south

    Oct 2, 2005 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, ceiling, 1st door frame from east at south wall, 1st door frame from south at west wall, south wall, east wall, 1st window frame from south at west wall in the 4th room from east located at apt 1l, 1st story, 1st apartment from north at east

    Sep 24, 2005 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, ceiling, 1st door frame from east at south wall, 1st door frame from north at east wall, 11th door frame from north at east wall, north wall, west wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 5th room from east located at apt 1l, 1st story, 1st apartment from north at east

    Sep 24, 2005 · Apt 1L

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st base cabinet from west at north wall, baseboard at east wall, 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from south at west wall in the kitchen located at apt 1l, 1st story, 1st apartment from north at east

    Sep 24, 2005 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from east at south wall, north wall, south wall, east wall, 1st window frame from west at north wall in the bathroom located at apt 1l, 1st story, 1st apartment from north at east

    Sep 24, 2005 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, baseboard at west wall, ceiling, 1st door frame from north at east wall, 1st door frame from south at west wall, west wall, 1st window frame from north at east wall in the 2nd room from east located at apt 1l, 1st story, 1st apartment from north at east

    Sep 24, 2005 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, north wall, south wall in the private hallway located at apt 1l, 1st story, 1st apartment from north at east

    Sep 24, 2005 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from west at north wall, 1st door frame from south at west wall, west wall in the foyer located at apt 1l, 1st story, 1st apartment from north at east

    Sep 24, 2005 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Aug 15, 2005 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    Aug 15, 2005 · Apt 1R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the private hallway located at apt 1r, 1st story, 1st apartment from east at south

    Aug 15, 2005 · Apt 1R

    Open — Defect letter issued
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Aug 15, 2005 · Apt 1R

    Closed — Violation closed

DOB building violations · 7

  • Construction other optional

    Due to matters not provided for: there is extensive fire damage throughout apt 1r, rendering the unit inhabitable until necessary repairs are made, there doesn't appear to be any structural damage

    Dec 20, 2019

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - active

ECB violations · 1

  • Class - 2

    Pedestrian protection does not meet code specification.note at the time of inspection against a complaint to a building jobsite with no workin progress.noted sidewalk shed is in place with valid permit.observed

    Sep 27, 2021 · Penalty $10,000

    Active

Complaints

  • Door/window

    Door

    Mar 26, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Mar 26, 2026 · Apt BLDG

    Close
  • Outside building

    Skylight

    Mar 26, 2026 · Apt BLDG

    Close
  • Flooring/stairs

    Stairs

    Mar 26, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Mar 26, 2026 · Apt 3L

    Close
  • Door/window

    Door

    Mar 26, 2026 · Apt 3L

    Close
  • Door/window

    Door

    Mar 26, 2026 · Apt 1L

    Close
  • Safety

    Carbon monoxide detector

    Mar 26, 2026 · Apt 1L

    Close
  • Electric

    Wiring

    Mar 26, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Oct 2, 2025 · Apt 3R

    Close
Show 40 more ↓
  • Flooring/stairs

    Floor

    Oct 2, 2025 · Apt 3R

    Close
  • Appliance

    Refrigerator

    Oct 2, 2025 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Oct 2, 2025 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Oct 2, 2025 · Apt 3R

    Close
  • Door/window

    Door frame

    Oct 2, 2025 · Apt 3R

    Close
  • Door/window

    Door

    Oct 2, 2025 · Apt 3R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 19, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 24, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 24, 2023 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Feb 22, 2006 · Apt 1R

    Close
  • Plumbing

    Shower-stall

    Feb 22, 2006 · Apt 1R

    Close
  • Heating

    Heat related

    Jan 15, 2006 · Apt 1R

    Close
  • General

    Windows

    Dec 12, 2005 · Apt 1R

    Close
  • Electric

    Lighting

    Dec 3, 2005 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Dec 3, 2005 · Apt 1R

    Close
  • General

    Doors

    Dec 3, 2005 · Apt 1R

    Close
  • General

    Doors

    Dec 3, 2005 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Dec 3, 2005 · Apt 1R

    Close
  • General

    Floor

    Dec 3, 2005 · Apt 1R

    Close
  • Plumbing

    Shower-stall

    Dec 3, 2005 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Dec 3, 2005 · Apt 1R

    Close
  • Electric

    Lighting

    Dec 3, 2005 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Dec 3, 2005 · Apt 1R

    Close
  • General

    Doors

    Dec 3, 2005 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Dec 3, 2005 · Apt 1R

    Close
  • General

    Windows

    Dec 3, 2005 · Apt 1R

    Close
  • General

    Floor

    Dec 3, 2005 · Apt 1R

    Close
  • Nonconst

    Vermin

    Dec 3, 2005 · Apt 1R

    Close
  • General

    Windows

    Dec 3, 2005 · Apt 1R

    Close
  • General

    Windows

    Dec 3, 2005 · Apt 1R

    Close
  • Nonconst

    Vermin

    Dec 3, 2005 · Apt 1R

    Close
  • Electric

    Wiring

    Dec 3, 2005 · Apt 1R

    Close
  • Heating

    Heat related

    Nov 22, 2005 · Apt 1R

    Close
  • Heating

    Heat related

    Nov 17, 2005 · Apt 1R

    Close
  • Heating

    Heat related

    Nov 17, 2005 · Apt 1R

    Close
  • General

    Windows

    Nov 3, 2005 · Apt 1R

    Close
  • General

    Windows

    Nov 3, 2005 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Nov 3, 2005 · Apt 1R

    Close
  • Nonconst

    Vermin

    Nov 3, 2005 · Apt 1R

    Close
  • General

    Doors

    Nov 3, 2005 · Apt 1R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1909
Floors
3
Residential units
6
Building area
5,100 ft²
Lot area
2,521 ft²
Zoning
R5B
Community board
405
Council district
30
Block / lot
3535 / 8
Assessed value
$381,600
Landmark / historic district
Central Ridgewood Historic District

HPD registration #407523, last renewed Jul 10, 2025.

Questions about 60-62 Catalpa Avenue

Who owns 60-62 Catalpa Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Aba Future LLC.

Does 60-62 Catalpa Avenue have violations?

Yes. NYC HPD has recorded 47 housing violations at this property.

Is 60-62 Catalpa Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 60-62 Catalpa Avenue built?

City records list 1909 as the year it was built.

How many apartments are in 60-62 Catalpa Avenue?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.