71-10 60 Lane
Queens, NY 11385BBL 4-03518-0026Map
Owner of record: 0117 Lane LLC
71-10 60 Lane is a walk-up apartment building built in 1901 in Queens, 11385. It has 3 residential units across 2 floors. The owner of record is 0117 Lane LLC. HPD has recorded 29 housing violations here, most recently on March 28, 2023. 20 of the 29 most recent violations are still open.
- HPD violations
- 29
- DOB violations
- 3
- ECB violations
- 9
- HPD complaints
- 34
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 29
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 14, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 23, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 1, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2016
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the entire apartment located at apt 1flr, 1st story, 1st apartment from south at west
Feb 3, 2016 · Apt 1FLR
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1flr, 1st story, 1st apartment from south at west
Feb 3, 2016 · Apt 1FLR
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1flr, 1st story, 1st apartment from south at west
Feb 3, 2016 · Apt 1FLR
Open — Nov sent out - ANon-hazardous
Refit door in the bathroom located at apt 1flr, 1st story, 1st apartment from south at west
Feb 3, 2016 · Apt 1FLR
Open — Nov sent out - ANon-hazardous
Refit door in the entrance located at apt 1flr, 1st story, 1st apartment from south at west
Feb 3, 2016 · Apt 1FLR
Open — Nov sent out
Show 19 more ↓
- BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1flr, 1st story, 1st apartment from south at west
Feb 3, 2016 · Apt 1FLR
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1flr, 1st story, 1st apartment from south at west
Feb 3, 2016 · Apt 1FLR
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 15, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 26, 2015
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 4th room from east, the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north
Jan 15, 2015 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the private hallway located at apt 1, 1st story, 1st apartment from west at north
Jan 15, 2015 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1, 1st story, 1st apartment from west at north
Jan 1, 2015 · Apt 1
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at private hallway, 1st story, apartment
Jan 1, 2015 · Apt 1
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at entrance door to bldg.
Jan 1, 2015
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls & ceiling in the bathroom located at apt 1, 1st story
Nov 19, 2011 · Apt 1
Open — Nov certified late - BHazardous
Replace the broken or defective missing wash basin in the bathroom located at apt 1, 1st story
Nov 19, 2011 · Apt 1
Open — Nov certified late - BHazardous
Properly repair the broken or defective upper & lower sash windows in the entire apartment located at apt 1, 1st story
Nov 19, 2011 · Apt 1
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at public hall, 1st story
Feb 9, 2011
Open — Nov sent out - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
Aug 31, 2009
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. north wall at north in the 3rd room from north at east located at apt 1, 1st story, apartment at north
Aug 20, 2001 · Apt 1
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface on wood trim, doors, or windows - using exclusive interim controls, which include a surface dust test in accordance with statute. south door molding at south in the 3rd room from north at east located at apt 1, 1st story, apartment at north
Aug 20, 2001 · Apt 1
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. north wall at north, west wall at west in the 2nd room from north located at apt 1, 1st story, apartment at north
Aug 20, 2001 · Apt 1
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the bathroom located at apt 1, 1st story, apartment at north
Aug 20, 2001 · Apt 1
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. west wall at west, east wall at east, ceiling in the room from north at east located at apt 1, 1st story, apartment at north
Aug 20, 2001 · Apt 1
Open — Defect letter issued
DOB building violations · 3
- Construction other optional
C-construction other optional
Sep 18, 1999
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Sep 18, 1999
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Sep 18, 1999
Dob violation - active
ECB violations · 9
- Class - 1
Unlawful acts.fail to comply w/an order of the comm's noted:resp failed to correct the conditions cited in prior nov#34789604n, having installed 2 gas lines for 2 new water heaters in the cellar w/o permit. no
Oct 30, 2009 · Penalty $12,000
Resolve - Class - 2
Fail to comply w/the comm's order to file a cofc with the dob noted:resp failed to comply with the comm's order to correct the violating conditions & file a cofc pursuant to 28.204.2 for nov#34789604n.rem:file
Oct 30, 2009 · Penalty $4,000
Resolve - Class - 1
Plumbing work w/o a permit. work noted: at cellar level installed 2 gas lines for 2 new gas hot water heaters noted: new 2 separated gas lines). remedy: obtain permit or restore to prior legal condition.
Jun 26, 2009 · Penalty $8,000
Active - Non-hazardous
Failure to comply with the commissioners order to file a certificate of correction with the department of buildings for the violating condition cited in notice of violation #34163106x.remedy:correct the violati
Dec 20, 2000
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families. building dept. records indicates residence legally approved for 3 families. residence now altered for occupan
Jul 10, 1998 · Penalty $2,500
Resolve - Hazardous
Occupancy contrary to that aloowed by the building department record illegal occupancy : work noted. from a legal cellar for storage to an illegal class "a" apt erected sheetrock partition throughout cellar cre
Jul 10, 1998 · Penalty $2,500
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved # of families building dept seconds indicate residence legally approved for 3 families residence now altered for occupancy by 4 f
Dec 12, 1997 · Penalty $2,500
Resolve - Hazardous
Occupancy contrary to that allowed by the building department records illegal occupancy noted three family dwelling converted into 4 family dwelling cellar converted from storage boiler to 2 bed apt with full
Dec 11, 1997 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit work noted: partition walls erected throughout 1st and 2nd floors subdividing apartments. (at 1st floor 1 apt converted into 2 the same at 2nd floor total 4 apartments. remedy: obtain perm
Oct 16, 1997
Resolve
Complaints
- Heat/hot water
Entire building
Mar 20, 2016 · Apt 2R
Close - Door/window
Door
Jan 18, 2016 · Apt 1FLR
Close - Door/window
Door
Jan 18, 2016 · Apt 1FLR
Close - Paint/plaster
Ceiling
Jan 18, 2016 · Apt 1FLR
Close - Unsanitary condition
Pests
Jan 18, 2016 · Apt 1FLR
Close - Unsanitary condition
Pests
Jan 18, 2016 · Apt 1FLR
Close - Paint/plaster
Ceiling
Jan 18, 2016 · Apt 1FLR
Close - Paint/plaster
Wall
Jan 18, 2016 · Apt 1FLR
Close - Unsanitary condition
Mold
Jan 18, 2016 · Apt 1FLR
Close - Electric
No lighting
Dec 29, 2015 · Apt 1
Close
Show 24 more ↓
- Heat/hot water
Apartment only
Nov 20, 2015 · Apt 1
Close - Heat/hot water
Entire building
Jan 13, 2015 · Apt 1FL
Close - Heat/hot water
Entire building
Oct 23, 2014 · Apt 1STFL
Close - General
Cabinet
Nov 17, 2011 · Apt 1
Close - General
Stairs
Nov 17, 2011 · Apt 1
Close - General
Windows
Nov 17, 2011 · Apt 1
Close - General
Doors
Nov 17, 2011 · Apt 1
Close - Heating
Heat related
Nov 17, 2011 · Apt 1
Close - General
Doors
Jan 14, 2011 · Apt 1
Close - Heating
Heat related
Jan 14, 2011 · Apt 1
Close - Heating
Heat related
Nov 1, 2010 · Apt BLDG
Close - Heating
Heat related
Jan 19, 2010 · Apt 1
Close - Heating
Heat related
Dec 16, 2009 · Apt 2
Close - Plumbing
Bathtub/shower
Dec 16, 2009 · Apt 2
Close - General
Windows
Dec 16, 2009 · Apt 2
Close - Nonconst
Signage
Jun 23, 2009 · Apt BLDG
Close - Nonconst
Carbon monoxide
Jun 23, 2009 · Apt BLDG
Close - Nonconst
Illegal
Nov 26, 2004 · Apt BLDG
Close - Electric
Lighting
Nov 26, 2004 · Apt BLDG
Close - Electric
Lighting
Nov 26, 2004 · Apt BLDG
Close - Paint/plaster
Wall
Nov 26, 2004 · Apt BLDG
Close - Nonconst
Illegal
Nov 26, 2004 · Apt BLDG
Close - Nonconst
Carbon monoxide
Nov 26, 2004 · Apt BLDG
Close - Electric
Lighting
Sep 14, 2004 · Apt PH
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1901
- Floors
- 2
- Residential units
- 3
- Building area
- 3,420 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6B
- Community board
- 405
- Council district
- 30
- Block / lot
- 3518 / 26
- Assessed value
- $72,060
- Landmark / historic district
- No
HPD registration #405900, last renewed Aug 14, 2025.
Questions about 71-10 60 Lane
Who owns 71-10 60 Lane?
The owner of record in NYC Department of City Planning PLUTO data is 0117 Lane LLC.
Does 71-10 60 Lane have violations?
Yes. NYC HPD has recorded 29 housing violations at this property.
Is 71-10 60 Lane rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 71-10 60 Lane built?
City records list 1901 as the year it was built.
How many apartments are in 71-10 60 Lane?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.