Violations at 150 Greenway Terrace
Queens, NY 11375 · BBL 4-03272-0001 · Back to the property
HPD housing violations
The newest 50 of 157 HPD violations. The city keeps the complete history.
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 1st room from north at east located at apt 12w, 1st story, 1st apartment from west at north
Feb 10, 2026 · Apt 12W
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 12w, 1st story, 1st apartment from west at north
Feb 10, 2026 · Apt 12W
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 22e, 2nd story, 1st apartment from south at west
Jan 28, 2026 · Apt 22E
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 22e, 2nd story, 1st apartment from south at west
Jan 28, 2026 · Apt 22E
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jan 28, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 21e, 2nd story, 3rd apartment from east at south
Jan 28, 2026 · Apt 21E
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 21e, 2nd story, 3rd apartment from east at south
Jan 28, 2026 · Apt 21E
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Open — Lead docs submitted, not acceptable - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 2nd room from east located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 2nd door frame from west at north wall in the foyer located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the 1st room from east at south, the private hallway located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the bathroom located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Properly secure the loose upper cabinet door at south wall in the kitchen located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls, ceiling and trim in the entire apartment located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall in the 2nd room from east located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, 1st window frame from east at south wall in the 2nd room from east located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from south at west wall door in the foyer located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 2nd door from west at north wall, 1st door from west at north wall in the foyer located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the bathroom located at apt 23e, 2nd story, 1st apartment from east at south , section ''east''
Aug 9, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Properly secure the loose watercloset in the bathroom located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in water closet in the bathroom located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east and west walls in the private hallway located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the kitchen located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets sink in the kitchen located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wall door cabinet hinges in the kitchen located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from east located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the radiator cover in the 1st room from east located at apt 23e, 2nd story, 1st apartment from north at east
Jul 29, 2024 · Apt 23E
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 22, 2024
Closed — Violation dismissed - BHazardous
Replace with new the missing safety cap at electrical outlet at south wall at lobby area at public hall, 1st story
Mar 22, 2024
Closed — Violation dismissed - BHazardous
Replace with new the missing safety cap at electrical outlet at north wall at public hall, 6th story, section ''west''
Mar 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective secondary egress door hinges located at apt 26e, 2nd story, 1st apartment from south at west , section ''e''
Feb 1, 2024 · Apt 26E
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked to boiler room at cellar
Dec 9, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 12w, 1st story, 1st apartment from west at north
Dec 9, 2023 · Apt 12W
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 12w, 1st story, 1st apartment from west at north
Dec 9, 2023 · Apt 12W
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 12w, 1st story, 1st apartment from west at north
Dec 4, 2023 · Apt 12W
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 12w, 1st story, 1st apartment from west at north
Dec 4, 2023 · Apt 12W
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 12w, 1st story, 1st apartment from west at north
Dec 4, 2023 · Apt 12W
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 12w, 1st story, 1st apartment from north at east
Nov 29, 2023 · Apt 12W
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead to roof at stair ''a'' at public hall, 6th story, section at west
Nov 9, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 18e, 1st story, 1st apartment from west at north
Mar 21, 2023 · Apt 18E
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 18e, 1st story, 1st apartment from west at north
Mar 21, 2023 · Apt 18E
Closed — Violation dismissed
DOB building violations
The newest 50 of 62 DOB violations. The city keeps the complete history.
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Hazardous condition (facade) facade required
Fisphaz-hazardous condition (facade) facade required
Oct 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 26, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 31, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Failure to correct swarmp conditions (facade) facade required
Cycle 9c failure to correct swarmp conditions
Oct 22, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 17, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2016
Dob violation - resolved - Elevator elevatorrequired
Cease use
Dec 13, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2015
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2009
Dob violation - resolved - Construction other optional
The queens boro commissioner has revoked job# 401381991 and ordered all work at this bldg/site stopped as of 1/12/05. the arch/eng of reco rd must contac the qns boro comm's office (718-286-0601) to resolve this matter. aapprox. 60 % of the work was completed as of this date stop all work-make safe
Feb 28, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2002
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2002
Dob violation - resolved - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Feb 28, 2002
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Oct 19, 2001
Dob violation - dismissed - Elevator elevatorrequired
4p1512
Oct 20, 2000
Dob violation - resolved - Elevator elevatorrequired
4p1511
Oct 20, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations
The newest 50 of 51 ECB violations. The city keeps the complete history.
- Class - 2
Removal of public protection from unsafe facade without approval from the department.at the time of inspection observed there is no public protection along the exterior facade that filed unsafe.rem:comply with
Jan 2, 2024
Resolve - Class - 2
Failure to file acceptable amended cycle 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#811183.remedy:file acceptable report.
Oct 8, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to notify dept of accident/incident that resulted in a fatality or injury.note:worker fell from supported pipe scaffold was taken to hospitl by ambulance for treatment.as per check of dept records permi
May 11, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to maintain exterior bldg facade or appurtenances.note:atoi,observed@1)exp1,n elevation:broken-missing roof tiles@3fl.(i)missing window pane glass@6fl.(ii)cracked-spalled secs over main entrance door.2)
May 6, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to safeguard all person and property effected by construction.note:at time of my inspection responding to complaint that one worker fell from supported pipe scaffold during installation in progress.insp
Apr 2, 2021
Resolve - Class - 1
Failure to maintain/display on site documents require by chapter 33.note:at time of my inspection observed active jobsite the supported pipescaffold installed in progress upon request for approved drawing unabl
Apr 2, 2021
Resolve - Class - 2
Pedestrian protection does not meet code specifications note:at time of my inspection observed sidewalk shed installed out side of the building and are not maintain as required the sidewalk shed bolt uncaped as
Apr 2, 2021
Resolve - Class - 1
Failure to maintain exterior bldg facade & appurtenances.note:at the time of inspection observed defective facade.expo.#1,north elevation: defective masonry work such as:cracks,loosing stucco layer,defective
Mar 24, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to provide adequate safety measure,such as shed,netting,etc,where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-06. facade technical report filed as unsafe
Feb 23, 2021 · Penalty $25,000
Resolve - Class - 1
Failure to provide adequate safety measure,such as shed,netting,etc,where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-06. facade technical report filed as unsafe
Dec 29, 2020 · Penalty $10,000
Resolve - Class - 2
Failure to maintain exterior building facade/walls and appurtenances. note:at the time of inspection observed at exposure 3,south elevation:defect at gable roof/decorative stone over terrace,defective window li
Dec 29, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to take and provide adequate safety such as sidewalk shed fence etc where require to protect and secure public safety from documented unsafe facade as per 103-04. facade technical report file unsafe by
Oct 31, 2020 · Penalty $10,000
Resolve - Class - 1
Failure to maintain building exterior walls/facade and appurtenances. note at the time of inspections observed at exposure 3:defect at gableroof decorative stone over terrace,causing movement. remedy:maintain b
Oct 31, 2020 · Penalty $2,500
Resolve - Class - 3
Failure to maintain building in code compliant.at the time of inspection,the exterior wall condition certificate was not posted in the interior of the building (lobby or vestibule room)rem:comply with the code
Sep 16, 2020 · Penalty $250
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances.note:north elevator exp#1:observed defective window lintel,open joints spalling bricks,cracked stone and broken window pane east elevation:cracked
Sep 16, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to provide adequate safety measure,such as shed,er,where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-04.facade technical report filed as unsafe by qewi(pe
Sep 16, 2020 · Penalty $10,000
Resolve - Class - 2
No motor room ventilation , provide
Jun 26, 2020 · Penalty $310
Resolve - Class - 1
2 elevators being taken out simultaneously for alteration , leaving building with no elevator service , restore elevators to working order;
Jun 8, 2020 · Penalty $1,250
Resolve - Class - 1
2 elevators being taken ot simultaneously for alteration , leaving building with no elevator service , restore elevators to working order
Jun 8, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#811183.rem:submit acceptable required t
Feb 13, 2020 · Penalty $1,250
Resolve - Class - 2
Work without a permit. noted: six story multi-unit apartment building front yard brick and stone wall approx. 4' in height has approx. 100 section was demolished and under repair no filing in dob records for
Aug 23, 2018 · Penalty $3,125
Resolve - Class - 1
Cu45x10; cu66x10; cu42x10; 13x10. 45x10-governor switch is not operative; 66x10-rope gripper is not operative; 42x10-door monitoring systems is not operative; asme a17.1 2000 (2.26.5); 13x10-repair emergency
Aug 15, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: provide required corridor width per bc1016.2;27-369. noted: at 5th fl,in stairway,bicyclehas been chained to railing causing partial obstruction passageway.
Nov 10, 2015
Resolve - Class - 2
05m07,99b07,05m07-provide door zone restrictor,99b07-in correct date on cai i test tag.
Jun 6, 2014
Resolve - Class - 2
05m07,67x10,99b07,59l11-provide door zone lock,67x10-repair emergcencyphone,59l11-replace defective cotter pon,on one of the brake pin,99b7 incorrect fate on cat 1 test tag.
Jun 6, 2014 · Penalty $250
Resolve - Class - 2
77b11,19m07.(77)provide proper size toe guard 3.3.2.
Nov 23, 2010
Resolve - Class - 2
97x07. 97- restore to service.
Nov 1, 2010
Resolve - Class - 2
52h11,53h11.
May 8, 2010
Resolve - Class - 2
52h11,26d06,32m10. 32m- ctwt bottom right roller guide missing an another damaged.
May 5, 2010
Resolve - Class - 2
26d06/ 81m07/ 69m07
Apr 30, 2010
Resolve - Non-hazardous
45m7/45-up trip switch.
Mar 12, 2007
Resolve - Non-hazardous
85m5/
Mar 12, 2007 · Penalty $350
Resolve - Non-hazardous
84l10. (84-l-10) cab phone defective repair.
Oct 2, 2006
Resolve - Non-hazardous
84l10. (84-l-10) cab phone defective repair.
Oct 2, 2006
Resolve - Non-hazardous
40b07/41b06 (40) provide up over speed tripping switch and certify to proper calibrations as per ansi a: 17.1 sections 206.4a and 206.4b (3)(41) properly secure relay on controller.
Feb 1, 2005
Resolve - Hazardous
Failure to file an amended fifth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report followinf remedia
Jul 30, 2004
Resolve - Non-hazardous
No approved plan upon inspection at the above proeprty alteration workin progress and no drivway for my inspection removed wall and ceiling ne electrical unfinished all new wires at outlet and fixtures access
Jun 3, 2004
Resolve - Hazardous
Failure to maintain building 'haz' defects noted. 1) perimeter wall isloose and has pulled away from columns in various locations around entire building (east, west, across the street from p.s. 102 elementary
May 21, 2004 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall 'haz' noted: 1) ac units supported from outside sill with blocks/bricks. thru-out building on allfloors in various locations 2) exterior window jam is rooted and in
May 21, 2004 · Penalty $800
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department indicating correction of unsafe conditions described in initial ll 11/98 report.remedy:file an amended report following remedial repair
Sep 30, 2003
Resolve - Non-hazardous
Failure to file an amednded round five report acceptable to this department indicating correction of unsafe conditions described in initial ll11/98 report.remedy:file an amended report following remedial repair
Jul 14, 2003 · Penalty $1,750
Resolve - Non-hazardous
Failure to file an amended round five report acceptable to this department indicating correction of unsafe conditions described in initial ll11/98 report.remedy:file an amended report following remedial repairs
May 23, 2003 · Penalty $10,000
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy : file a
Sep 6, 2002 · Penalty $1,000
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y.32-03b(5)indicating correction of hazardous conditions described in initialo ll11/98 report remedy file an ame
Jul 5, 2002 · Penalty $1,000
Resolve - Hazardous
Failure to file an amended round 5 report acceptable to this department pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll11/98 report remedy file an amende
May 3, 2002 · Penalty $400
Resolve - Non-hazardous
Failure to maintain defect is:at front of premises slate flagstone walk-way in disrepair,flag stone missing, loose and broken causing a tripping hazard to the public, at rear of premises brick walk wayat public
Oct 15, 2001 · Penalty $800
Resolve - Non-hazardous
Failure to maintain exterior building wall: defect is at rear of structure, parapet level a section of concrete cornis loose and in danyer of collapse causing a hazardous condition to public and tennants of bui
Oct 15, 2001 · Penalty $800
Resolve - Non-hazardous
874 m 15 j 05 x 55 x 57 o 25 o 73 o 74 counter wright hold down reds, replace catter pins at top and properly secure nuts, 15 3rd fl door, 05 car dor restrictor, 73 car top and parts of device
Apr 2, 1997
Resolve - Non-hazardous
22 d 05 x 55 x 57 o 25 o 73 o 05 door for cab restrictor 73 car top and parts device
Apr 2, 1997
Resolve - Non-hazardous
03,22d,25m,35t,35l,36w,37r,50f,55l,(03)car top lighting (22)secure from top of car. (25)electric box cover (35)post elevator sign. (35)replace broken glass to windows (36)remove door lock (37)romove paper to r
Sep 9, 1991
Resolve