roofy

Violations at 69-27 Metropolitan Avenue

Queens, NY 11379 · BBL 4-03050-0042 · Back to the property

HPD housing violations

11 HPD violations, newest first.

  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 8, 2024 · Apt 2L

    Open — Nov sent out
  • ANon-hazardous

    Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 8, 2024 · Apt 2L

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the visible mold condition... approx 8 sq ft at ceiling, and approx 6sq ft at west wall in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 8, 2024 · Apt 2L

    Open — First no access to re- inspect violation
  • BHazardous

    Repair the roof so that it will not leak above ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 8, 2024 · Apt 2L

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 8, 2024 · Apt 2L

    Open — Nov sent out
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 8, 2024 · Apt 2L

    Open — Nov sent out
  • BHazardous

    Replace the broken or defective washbasin in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 8, 2024 · Apt 2L

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective connection in wasteline at washbasin in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 8, 2024 · Apt 2L

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 8, 2024 · Apt 2L

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 8, 2024 · Apt 2L

    Open — Nov sent out
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west yard

    Apr 21, 2016

    Open — Nov sent out

DOB building violations

11 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Nov 28, 2000

    Vw-violation work without permit - active
  • Construction other optional

    C-construction other optional

    Sep 20, 1995

    Vw-violation work without permit - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Feb 8, 1993

    Vw-violation work without permit - active

ECB violations

6 ECB violations, newest first.

  • Non-hazardous

    Work without a permit:work noted:having constructed and completed a 1sty extension to the front,of the bldg:note extension is approx 8'x40'x1sty and finished with bride and glass panels.rem:obtain a permit or r

    Nov 28, 2000 · Penalty $2,500

    Active
  • Non-hazardous

    Work without a permit work noted: extension at rear of building size: 6feet*15feet extension located on 1st floor. remedy: obtain a permit if feasible or restore premises to prior legal condition

    Apr 20, 1994

    Resolve
  • Non-hazardous

    Work without a permit: work noted: one story brick extention at front of building approx: 6'*40'*8' high w/o d.o.b permits. remedy: obtain permits if feasible or restore to prior legal condition

    Apr 20, 1994

    Resolve
  • Non-hazardous

    Work without a permit. construction of one story brick extension at front of building approx 6' depth x 40' width x 12' height with masonary roof line. bn 1709-86 to legalize was never finalized

    Apr 9, 1993

    Resolve
  • Non-hazardous

    Work without a permit work noted: extension at rear of building. size: 6 feet * 15 feet. extension located on first floor. remedy: obtain a permit if feasible or restore premise to prior legal condition

    Oct 14, 1992 · Penalty $1,000

    Active
  • Non-hazardous

    Work without a permit work noted one story brick extension at front approx 6'deep x 40' wide x 8'high remedy obtain a permit if feasible or restore to prior legal condition

    May 12, 1992 · Penalty $285

    Active