Violations at 69-27 Metropolitan Avenue
Queens, NY 11379 · BBL 4-03050-0042 · Back to the property
HPD housing violations
11 HPD violations, newest first.
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north
Feb 8, 2024 · Apt 2L
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Feb 8, 2024 · Apt 2L
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 8 sq ft at ceiling, and approx 6sq ft at west wall in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Feb 8, 2024 · Apt 2L
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak above ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Feb 8, 2024 · Apt 2L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Feb 8, 2024 · Apt 2L
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Feb 8, 2024 · Apt 2L
Open — Nov sent out - BHazardous
Replace the broken or defective washbasin in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Feb 8, 2024 · Apt 2L
Open — Nov sent out - BHazardous
Repair the broken or defective connection in wasteline at washbasin in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Feb 8, 2024 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Feb 8, 2024 · Apt 2L
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Feb 8, 2024 · Apt 2L
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west yard
Apr 21, 2016
Open — Nov sent out
DOB building violations
11 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Construction other optional
C-construction other optional
Nov 28, 2000
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Sep 20, 1995
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active - Construction other optional
C-construction other optional
Feb 8, 1993
Vw-violation work without permit - active
ECB violations
6 ECB violations, newest first.
- Non-hazardous
Work without a permit:work noted:having constructed and completed a 1sty extension to the front,of the bldg:note extension is approx 8'x40'x1sty and finished with bride and glass panels.rem:obtain a permit or r
Nov 28, 2000 · Penalty $2,500
Active - Non-hazardous
Work without a permit work noted: extension at rear of building size: 6feet*15feet extension located on 1st floor. remedy: obtain a permit if feasible or restore premises to prior legal condition
Apr 20, 1994
Resolve - Non-hazardous
Work without a permit: work noted: one story brick extention at front of building approx: 6'*40'*8' high w/o d.o.b permits. remedy: obtain permits if feasible or restore to prior legal condition
Apr 20, 1994
Resolve - Non-hazardous
Work without a permit. construction of one story brick extension at front of building approx 6' depth x 40' width x 12' height with masonary roof line. bn 1709-86 to legalize was never finalized
Apr 9, 1993
Resolve - Non-hazardous
Work without a permit work noted: extension at rear of building. size: 6 feet * 15 feet. extension located on first floor. remedy: obtain a permit if feasible or restore premise to prior legal condition
Oct 14, 1992 · Penalty $1,000
Active - Non-hazardous
Work without a permit work noted one story brick extension at front approx 6'deep x 40' wide x 8'high remedy obtain a permit if feasible or restore to prior legal condition
May 12, 1992 · Penalty $285
Active