63-36 Woodhaven Boulevard
Queens, NY 11374BBL 4-02999-0021Map
Owner of record: Highpoint Associates Vi, LLC
63-36 Woodhaven Boulevard is a mixed residential and retail building built in 1930 in Queens, 11374. It has 3 residential units across 2 floors. The owner of record is Highpoint Associates Vi, LLC. HPD has recorded 183 housing violations here, most recently on May 7, 2026.
- HPD violations
- 183
- DOB violations
- 1
- ECB violations
- 4
- HPD complaints
- 218
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 183
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the private hallway , the foyer located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective east closet door in the private hallway located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall, 1st window frame from south at west wall in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st riser from east at south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , 1st door frame from east at south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , 1st door frame from east at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Closed — Violation closed - ANon-hazardous
Post and maintain a notice, written in english and in spanish, on the building entrance door or other conspicuous location in the building common area, stating that: (1) the building is in the alternative enforcement program, (2) that occupants may call 311 or the aep at 212-863-8262 to report housing maintenance complaints, (3) the name, telephone, and address of the owner, and, (4) the identity of any financial institution that holds a mortgage on the property. post at public hall, 1st story
Feb 4, 2026
Closed — Violation closed
Show 40 more ↓
- IInformation / order
The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property
Feb 2, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 8, 2025 · Apt 2F
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 8, 2025 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 8, 2025 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 8, 2025 · Apt 2F
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Closed — Violation dismissed - BHazardous
Properly secure the loose faucet at the wash basin in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Oct 31, 2025 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective entrance door at east in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west
Oct 31, 2025 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Oct 31, 2025 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch assembly vestibule door at public hall, 1st story
Jul 30, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door latch at public hall, 1st story
Jul 30, 2025
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires ceiling at public hall, 2nd story
Jul 8, 2024
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Jul 8, 2024
Closed — Violation closed - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at public hall, 2nd story
Jul 8, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Jul 8, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges vestibule door public hall , 1st story
Jul 8, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Jul 3, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Jul 3, 2024 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Jul 3, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Jul 3, 2024 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Jul 3, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from east at north located at apt 2f, 2nd story, 1st apartment from south at west
Jul 3, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak roof over ceiling and east wall in the 1st room from east at north located at apt 2f, 2nd story, 1st apartment from south at west
Jul 3, 2024 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at building front area way leading to cellar at boiler room
Jul 3, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective ,glass pane lower sash in the 4th room from east at north located at apt 2f, 2nd story, 1st apartment from east at south
May 25, 2024 · Apt 2F
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jan 17, 2024 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water excexceeding maximum temperature of 130 degrees in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jan 17, 2024 · Apt 2R
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the kitchen , the foyer located at apt 2r, 2nd story, 1st apartment from south at west
Sep 24, 2023 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective connection at sink in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Jun 8, 2023 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet frame at washbasin in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Jun 8, 2023 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jun 8, 2023 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jun 8, 2023 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestubule , 1st story
May 28, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at building front entrance , 1st story
May 28, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood cover at scuttle opening , 2nd story
May 28, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall at public hall, 2nd story
May 28, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story
May 28, 2023
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Apr 29, 2023 · Apt 2F
Closed — Violation closed
DOB building violations · 1
- Construction other optional
Boro commissioner has issued stop work order for permit # 421352431
Sep 14, 2016
Dob violation - dismissed
ECB violations · 4
- Class - 2
Ecb violation issued for installation of hot water heater in kitchen closet at apt 2r. no permit on file for job done., obtain all permits
Nov 7, 2025 · Penalty $6,250
Active - Class - 2
Failure to maintain building in code complaint manner noted; at 1st floor level store front broken glass window with a large gapping hole (on the top part)allowing the weather elements enter the inside of build
Feb 14, 2024 · Penalty $3,125
Active - Class - 2
Failure to maintain. noted: observed at front entrance glass window has been damaged and has an 8 inch gaping hole., repair and/or replace
Nov 7, 2022 · Penalty $3,125
Active - Non-hazardous
Failure to maintain exterior of bldg. noted: loose & missing brick at top of 2nd fl at base of chimney. area is immediately about entrance to pizza store on a busy sidewalk. remedy: maintain bldg.
Jan 30, 2006 · Penalty $800
Resolve
Complaints
- Electric
Wiring
Jul 2, 2026 · Apt 2F
Close - Safety
Window guard broken/missing
Jul 2, 2026 · Apt 2F
Close - Paint/plaster
Radiator
Jul 2, 2026 · Apt 2F
Close - Electric
No lighting
Jul 2, 2026 · Apt BLDG
Close - Electric
Wiring
Jul 2, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Jul 2, 2026 · Apt 2R
Close - Door/window
Door
Jul 2, 2026 · Apt 2R
Close - Door/window
Door frame
Apr 8, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 2F
Close
Show 40 more ↓
- Electric
Wiring
Oct 30, 2025 · Apt BLDG
Close - Plumbing
Water supply
Oct 30, 2025 · Apt 2R
Close - Door/window
Door
Oct 30, 2025 · Apt 2R
Close - Unsanitary condition
Pests
Oct 30, 2025 · Apt 2R
Close - Paint/plaster
Radiator
Oct 30, 2025 · Apt 2R
Close - Electric
Wiring
Oct 30, 2025 · Apt 2F
Close - Safety
Carbon monoxide detector
Oct 30, 2025 · Apt 2F
Close - Safety
Smoke detector
Oct 30, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Oct 29, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Oct 17, 2025 · Apt 2R
Close - Unsanitary condition
Pests
Jan 5, 2025 · Apt 2F
Close - Outside building
Roof door/hatch
Jul 8, 2024 · Apt BLDG
Close - Door/window
Door
Jul 8, 2024 · Apt BLDG
Close - Flooring/stairs
Stairs
Jul 8, 2024 · Apt BLDG
Close - Unsanitary condition
Sewage
Jul 2, 2024 · Apt 2F
Close - Safety
Window guard broken/missing
Jul 2, 2024 · Apt 2F
Close - Paint/plaster
Wall
Jul 2, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Jul 2, 2024 · Apt 2F
Close - Safety
Carbon monoxide detector
Jul 2, 2024 · Apt 2F
Close - Safety
Smoke detector
Jul 2, 2024 · Apt 2F
Close - Unsanitary condition
Sewage
May 23, 2024 · Apt 2F
Close - Unsanitary condition
Pests
May 23, 2024 · Apt 2F
Close - Unsanitary condition
Sewage
May 23, 2024 · Apt 2F
Close - Plumbing
Bathtub/shower
May 23, 2024 · Apt 2F
Close - Plumbing
Toilet
May 23, 2024 · Apt 2F
Close - Plumbing
Toilet
May 23, 2024 · Apt 2F
Close - Door/window
Window pane
May 23, 2024 · Apt 2F
Close - Unsanitary condition
Pests
May 23, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 15, 2024 · Apt 2R
Close - Unsanitary condition
Pests
Aug 8, 2023 · Apt 2R
Close - Unsanitary condition
Pests
Jul 11, 2023 · Apt 2R
Close - Water leak
Slow leak
Jun 2, 2023 · Apt 2R
Close - Paint/plaster
Wall
Jun 2, 2023 · Apt 2R
Close - Paint/plaster
Wall
Jun 2, 2023 · Apt 2R
Close - Safety
Carbon monoxide detector
Apr 27, 2023 · Apt 2F
Close - Unsanitary condition
Pests
Apr 27, 2023 · Apt 2F
Close - Unsanitary condition
Pests
Apr 27, 2023 · Apt 2F
Close - Door/window
Door
Apr 27, 2023 · Apt 2F
Close - Safety
Smoke detector
Apr 27, 2023 · Apt 2F
Close - Paint/plaster
Radiator
Apr 27, 2023 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S3)
- Year built
- 1930
- Floors
- 2
- Residential units
- 3
- Building area
- 2,720 ft²
- Lot area
- 1,928 ft²
- Zoning
- R5D
- Community board
- 405
- Council district
- 30
- Block / lot
- 2999 / 21
- Assessed value
- $372,600
- Landmark / historic district
- No
HPD registration #414805, last renewed Jun 3, 2026.
Questions about 63-36 Woodhaven Boulevard
Who owns 63-36 Woodhaven Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Highpoint Associates Vi, LLC.
Does 63-36 Woodhaven Boulevard have violations?
Yes. NYC HPD has recorded 183 housing violations at this property.
Is 63-36 Woodhaven Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 63-36 Woodhaven Boulevard built?
City records list 1930 as the year it was built.
How many apartments are in 63-36 Woodhaven Boulevard?
It has 3 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.