roofy

Violations at 66-76 69 Street

Queens, NY 11379 · BBL 4-02790-0032 · Back to the property

HPD housing violations

20 HPD violations, newest first.

  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 25, 2025

    Open — Info nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 4, 2024

    Open — Info nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2023

    Open — Info nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2022

    Open — Info nov sent out
  • ANon-hazardous

    Refit door in the entrance located at apt 3r, 3rd story, 1st apartment from east at south

    Oct 31, 2022 · Apt 3R

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective lock assembly at door in the entrance located at apt 3r, 3rd story, 1st apartment from east at south

    Oct 31, 2022 · Apt 3R

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south

    Oct 31, 2022 · Apt 3R

    Closed — Violation closed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 18, 2022

    Open — Info nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Mar 8, 2022 · Apt 2

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 8, 2022 · Apt 2

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 8, 2022 · Apt 2

    Open — Nov sent out
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures electrical outlets ,all walls in the 3rd room from north at west located at apt 2fl, 2nd story, 1st apartment from south at west

    Feb 18, 2022 · Apt 2FL

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective electrical outlet at west wall in the 3rd room from north at east located at apt 2fl, 2nd story, 1st apartment from south at west

    Feb 18, 2022 · Apt 2FL

    Open — Nov sent out
  • BHazardous

    Replace with new the missing mechanical trip level at batub in the 2nd bathroom from north located at apt 2fl, 2nd story, 1st apartment from south at west

    Feb 18, 2022 · Apt 2FL

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st bathroom from north located at apt 2fl, 2nd story, 1st apartment from south at west

    Feb 18, 2022 · Apt 2FL

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak ceiling in the 1st bathroom from north located at apt 2fl, 2nd story, 1st apartment from south at west

    Feb 18, 2022 · Apt 2FL

    Open — Nov sent out
  • BHazardous

    Remove all obstructions and repair all defects in at bathtub in the 1st bathroom from north located at apt 2fl, 2nd story, 1st apartment from south at west

    Feb 18, 2022 · Apt 2FL

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2fl, 2nd story, 1st apartment from south at west

    Feb 18, 2022 · Apt 2FL

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2fl, 2nd story, 1st apartment from south at west

    Feb 18, 2022 · Apt 2FL

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 22, 2021

    Open — Info nov sent out

DOB building violations

6 DOB violations, newest first.

  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Oct 1, 2019

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Jun 15, 2008

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Nov 18, 2004

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 19, 2001

    Dob violation - dismissed
  • Construction other optional

    Dd

    Nov 13, 1991

    Vp*-violation unserved ecb- dismissed
  • Unsafe buildings none

    Com

    Apr 15, 1991

    Dob violation - dismissed

ECB violations

7 ECB violations, newest first.

  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not received a retaining wall condition assess

    Feb 25, 2025 · Penalty $1,280

    Active
  • Non-hazardous

    Failure to provide approved plans at premises at time of inspection.upon inspection of above address work was in progress and no approved plans were on site(2fl joist and deck being installed)rem:stop all work

    Oct 4, 2000 · Penalty $250

    Resolve
  • Non-hazardous

    Failure to provide approved plans at premises at time of inspection work in progress deck being installed on 2nd floor.remedy:stop all work provide approved plans.

    Oct 4, 2000 · Penalty $250

    Resolve
  • Non-hazardous

    Failure to provide approved plans at premises at time of inspection.upon inspection of above no approved plans were on site and construction was in progress.deck being installed an 2fl.rem:stop all work.provid

    Oct 4, 2000 · Penalty $250

    Resolve
  • Non-hazardous

    No approved plans. upon inspection at teh above property, there were no approved plans for my inspection. stop all work. remedy: provide approved plans.

    Oct 4, 2000 · Penalty $130

    Resolve
  • Hazardous

    Failure to maintain. defects is: contruction fence around entire site is inadequate, sections loose and leaning, creating open spaces and are not properly attached, creating a hazardous condition. remedy: repai

    Jul 27, 2000

    Resolve
  • Hazardous

    Failure to provide protection at sides of excavation. at rear of lot ffacing cemetary 12 foot deep excavation no sheeting and shoring. remedy: stop all construction except to make safe. provided protection imme

    Jul 27, 2000

    Resolve