roofy

52-24 65 Place

Queens, NY 11378BBL 4-02376-0101Map

Owner of record: Ridgewood Associates INC

52-24 65 Place is an elevator apartment building built in 1956 in Queens, 11378. It has 372 residential units across 6 floors. The owner of record is Ridgewood Associates INC. HPD has recorded 263 housing violations here, most recently on September 15, 2026. 24 of the 50 most recent violations are still open.

HPD violations
263
DOB violations
71
ECB violations
35
HPD complaints
502

Available now in this building

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 15, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. The newest 10 per agency here; the full lists are a click away.

HPD housing violations · 263

  • CImmediately hazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 6k, 6th story, 1st apartment from south at west

    Sep 15, 2026 · Apt 6K

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the entrance located at apt 6k, 6th story, 1st apartment from south at west

    Sep 15, 2026 · Apt 6K

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from east at north located at apt 6k, 6th story, 1st apartment from south at west

    Sep 15, 2026 · Apt 6K

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 4th room from east at north located at apt 6k, 6th story, 1st apartment from south at west

    Sep 15, 2026 · Apt 6K

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at north located at apt 6k, 6th story, 2nd apartment from south at west

    Sep 15, 2026 · Apt 6K

    Open — Civ14 mailed
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the 4th room from east at north located at apt 6k, 6th story, 2nd apartment from south at west

    Sep 15, 2026 · Apt 6K

    Open — Civ14 mailed
  • BHazardous

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ... in the entire apartment located at bsmt-apt ugm, 1st bsmt-apt from east at south

    Sep 15, 2026 · Apt UGM

    Open — Civ14 mailed
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the foyer located at apt 6k, 6th story, 2nd apartment from south at west

    Aug 28, 2026 · Apt 6K

    Open — Defect letter issued
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the 4th room from east at north located at apt 6k, 6th story, 2nd apartment from south at west

    Aug 28, 2026 · Apt 6K

    Open — Civ14 mailed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st door from north at east wall in the foyer located at apt 6k, 6th story, 2nd apartment from south at west

    Aug 28, 2026 · Apt 6K

    Open — Civ14 mailed
See all 263 HPD violations (10 shown here)

DOB building violations · 71

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2023

    Dob violation - dismissed
  • Construction other optional

    Due to fire damage to partition in the bathroom area in all f/e line u nits from 2nd: 6th floors such common walls & ceilings. dob requesting from the owner/management fire operation damage (n1)

    Mar 1, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Mar 18, 2019

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 17, 2019

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2016

    Mar 16, 2019

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 25, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2014

    Dob violation - resolved
See all 71 DOB violations (10 shown here)

ECB violations · 35

  • Class - 2

    On exterior masonry wall near apt 5n, mortar degradation has moisture penetrating apartment causing mold condition., maintain exterior building wall

    Aug 16, 2023

    Resolve
  • Class - 2

    In apt 5n in bedroom and bathroom mold appears at ceiling and corner,also noted paint peeling in same rooms., maintain exterior building wall

    Aug 1, 2023

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order in dob vio030122crt01hs/336477,dated 3/1/22.respondent required to submit engineer's report concerning structurally deficient conditions.as of 11/1/22,engineer's report

    Nov 1, 2022

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. upon inspection,observed damaged caused by fire in all f/e units line,fron 2nd thru 6th fl. the damage in all units bathrooms area,all commons walls between f/

    Mar 1, 2022 · Penalty $312

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. at time of inspection observed at apartment 5n living room window with water leak penetrating into interior damaging drywall. exterior repairs inadequate t

    Oct 26, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by construction operations. at time of inspection premises under permit #q00602272 for facade renovations, observed no overhead protection at any exposure

    Oct 26, 2021 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.noted:apt 5n living room window with damaged sofeit due to water.inspection of said window lintel revealed incomplete parring to prevent wind driven rain fr

    Sep 4, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. noted apartment5n has a crack across the ceiling approx 1/4 inch by 8 feet long. and crack and peeling paint around window. remedy: repair/or replace

    Feb 12, 2019

    Resolve
  • Class - 2

    Failure to institute safety measures at const site. observed, suspended scaffold in use for facade ops, at 7 sty bldg, 3 workers at fire escape area 2 w/o harness(ppe) and 1 worker tied off to fire escape, obse

    Nov 23, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Bc 3301.2 control access observed,facade work in progress @ 7 sty building with no caz in place for persons walking below and no protection in place to stop persons from walking into work area under suspended

    Nov 23, 2018 · Penalty $2,500

    Resolve
See all 35 ECB violations (10 shown here)

Complaints

  • Heat/hot water

    Apartment only

    Sep 30, 2026 · Apt ALL

    Close
  • Heat/hot water

    Apartment only

    Sep 20, 2026 · Apt 5F

    Close
  • Water leak

    Damp spot

    Aug 27, 2026 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Aug 16, 2026 · Apt 3C

    Close
  • Unsanitary condition

    Pests

    Jul 30, 2026 · Apt UGM

    Close
  • Unsanitary condition

    Pests

    Jul 30, 2026 · Apt UGM

    Close
  • Water leak

    Slow leak

    Jul 30, 2026 · Apt UGM

    Close
  • Paint/plaster

    Ceiling

    Jul 29, 2026 · Apt 4H

    Close
  • Water leak

    Slow leak

    Jul 29, 2026 · Apt 4H

    Close
  • Water leak

    Damp spot

    Jul 13, 2026 · Apt UGM

    Close
See all 502 HPD complaints (10 shown here)

Sales history

DatePriceTypeUnits
May 27, 2026$220,000Coops - elevator apartments—
Apr 30, 2026$300,000Coops - elevator apartments—
Mar 12, 2026$275,000Coops - elevator apartments—
Mar 12, 2026Non-market transferCoops - elevator apartments—
Jan 21, 2026$380,000Coops - elevator apartments—
Nov 18, 2025Non-market transferCoops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1956
Floors
6
Residential units
372
Building area
357,000 ft²
Lot area
142,969 ft²
Zoning
R4
Community board
405
Council district
30
Block / lot
2376 / 101
Assessed value
$11,002,500
Landmark / historic district
No

HPD registration #408532, last renewed Sep 17, 2026.

Questions about 52-24 65 Place

Who owns 52-24 65 Place?

The owner of record in NYC Department of City Planning PLUTO data is Ridgewood Associates INC.

Does 52-24 65 Place have violations?

Yes. NYC HPD has recorded 263 housing violations at this property.

Is 52-24 65 Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 52-24 65 Place built?

City records list 1956 as the year it was built.

How many apartments are in 52-24 65 Place?

It has 372 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.