roofy

53-44 63 Street

Queens, NY 11378BBL 4-02372-0170Map

Owner of record: O'toole, Thomas

53-44 63 Street is an one-family home built in 1930 in Queens, 11378. It has 1 residential unit across 2 floors. The owner of record is O'toole, Thomas. HPD has recorded 112 housing violations here, most recently on March 30, 2026. 41 of the 50 most recent violations are still open.

HPD violations
112
DOB violations
1
ECB violations
1
HPD complaints
64

What to know

Concern
21 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 112

  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Mar 30, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 30, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 30, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from south at west

    Mar 30, 2026 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from south at west wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, south wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, 1st window frame from north at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door frame from west at north wall, south wall in the private hallway located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, 1st window frame from east at south wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
Show 40 more ↓
  • A

    Refit entrance door in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 23, 2026 · Apt 2

    Open — Nov sent out
  • A

    Refit entrance door in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 23, 2026 · Apt 2

    Open — Nov sent out
  • A

    Refit entrance door in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Mar 23, 2026 · Apt 2

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling and south wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Mar 23, 2026 · Apt 2

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective wood nosing at intermediate landing at stairs in the private hallway located at apt 2, 2nd story, 1st apartment from south at west

    Mar 23, 2026 · Apt 2

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures sink in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Mar 23, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 23, 2026 · Apt 2

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Mar 23, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electric outlet socket at north and west walls in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 23, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice at cellar

    Mar 23, 2026

    Closed — Violation closed
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections wash sink, shower stall and water closet at cellar

    Mar 23, 2026

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the north wall, north wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • A

    Provide adequate supply of cold water for the fixtures sink in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Mar 23, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from south at west wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, south wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice at cellar

    Mar 23, 2026

    Open — Nov sent out
  • B

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range at cellar

    Mar 23, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light switch at south wall at vestibule at public hall, 1st story

    Mar 23, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective floor saddle at vestibule entrance to public hall at public hall, 1st story

    Mar 23, 2026

    Closed — Violation closed
  • B

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range at cellar

    Mar 23, 2026

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Mar 23, 2026 · Apt 1

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective mortise lock at building entrance door

    Mar 23, 2026

    Open — Nov sent out
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections water closet, shower stall, wash basin and kitchen sink at cellar

    Mar 23, 2026

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, 1st window frame from north at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st door from west at north wall, 1st door frame from west at north wall in the private hallway located at apt bsmt, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt BSMT

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from east at south wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west

    Jan 12, 2026 · Apt 2

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from south at west

    Jan 12, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, 1st radiator from south at west wall in the bathroom located at apt bsmt, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt BSMT

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 2nd room from east located at apt bsmt, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt BSMT

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt bsmt, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt BSMT

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, 1st window frame from north at east wall in the 1st room from east located at apt bsmt, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt BSMT

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door frame from west at north wall in the private hallway located at apt 1, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, 1st radiator from south at west wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Jan 12, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from east at south wall, 1st window frame from north at east wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Jan 12, 2026 · Apt 2

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st story, 1st apartment from east at south

    Jan 12, 2026 · Apt 1

    Open — Nov sent out

DOB building violations · 1

  • Construction other optional

    C-construction other optional

    Nov 2, 2012

    Dob violation - active

ECB violations · 1

  • Class - 2

    Occupancy contrary to that allowed by c of o and/or department of building records. private dwelling illegaly converted into multiple dwelling. partitions erected creating an illegal class "a" apartment at cell

    Oct 14, 2025 · Penalty $1,250

    Active

Complaints

  • Unsanitary condition

    Mold

    Mar 19, 2026 · Apt 2

    Close
  • Plumbing

    Water supply

    Mar 19, 2026 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 19, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Mar 19, 2026 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Mar 19, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Mar 19, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Mar 19, 2026 · Apt BSMT

    Close
  • Flooring/stairs

    Floor

    Mar 19, 2026 · Apt BSMT

    Close
  • Door/window

    Door frame

    Mar 19, 2026 · Apt BSMT

    Close
  • Paint/plaster

    Ceiling

    Mar 19, 2026 · Apt BSMT

    Close
Show 40 more ↓
  • Door/window

    Window frame

    Mar 19, 2026 · Apt BSMT

    Close
  • Electric

    No lighting

    Mar 19, 2026 · Apt BSMT

    Close
  • Paint/plaster

    Wall

    Mar 19, 2026 · Apt 2

    Close
  • Electric

    Outlet/switch

    Mar 19, 2026 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 19, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Mar 19, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Mar 19, 2026 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Mar 19, 2026 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Mar 19, 2026 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Jan 9, 2026 · Apt 2

    Close
  • Electric

    Outlet/switch

    Jan 9, 2026 · Apt 2

    Close
  • Door/window

    Door

    Jan 9, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 9, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Jan 9, 2026 · Apt BSMT

    Close
  • Plumbing

    Basin/sink

    Jan 9, 2026 · Apt BSMT

    Close
  • Door/window

    Door

    Jan 9, 2026 · Apt BSMT

    Close
  • Electric

    Outlet/switch

    Jan 9, 2026 · Apt BSMT

    Close
  • Unsanitary condition

    Mold

    Jan 9, 2026 · Apt 2

    Close
  • Flooring/stairs

    Stairs

    Jan 9, 2026 · Apt 2

    Close
  • Door/window

    Window frame

    Jan 9, 2026 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Jan 9, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 9, 2026 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Jan 9, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Jan 9, 2026 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Jan 9, 2026 · Apt 1

    Close
  • Door/window

    Door

    Jan 9, 2026 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Jan 9, 2026 · Apt BSMT

    Close
  • Flooring/stairs

    Floor

    Jan 9, 2026 · Apt BSMT

    Close
  • Door/window

    Window frame

    Jan 9, 2026 · Apt BSMT

    Close
  • Flooring/stairs

    Stairs

    Jan 9, 2026 · Apt BSMT

    Close
  • Flooring/stairs

    Floor

    Oct 2, 2025 · Apt 2

    Close
  • Electric

    No lighting

    Oct 2, 2025 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Oct 2, 2025 · Apt 2

    Close
  • Water leak

    Slow leak

    Oct 2, 2025 · Apt 2

    Close
  • Electric

    Outlet/switch

    Oct 2, 2025 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Oct 2, 2025 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Oct 2, 2025 · Apt 2

    Close
  • Electric

    Lighting

    Oct 2, 2025 · Apt 1

    Close
  • Door/window

    Door frame

    Oct 2, 2025 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Oct 2, 2025 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
One-family home (A5)
Year built
1930
Floors
2
Residential units
1
Building area
2,090 ft²
Lot area
2,500 ft²
Zoning
R4
Community board
405
Council district
30
Block / lot
2372 / 170
Assessed value
$66,420
Landmark / historic district
No

Questions about 53-44 63 Street

Who owns 53-44 63 Street?

The owner of record in NYC Department of City Planning PLUTO data is O'toole, Thomas.

Does 53-44 63 Street have violations?

Yes. NYC HPD has recorded 112 housing violations at this property.

Is 53-44 63 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 53-44 63 Street built?

City records list 1930 as the year it was built.

How many apartments are in 53-44 63 Street?

It has 1 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.