roofy

Violations at 50-25 64 Street

Queens, NY 11377 · BBL 4-02340-0012 · Back to the property

HPD housing violations

12 HPD violations, newest first.

  • BHazardous

    Trace and repair the source and abate the visible mold condition... approx 1sq ft at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south original violation 16987727 issued 21-may-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    May 21, 2024 · Apt 1

    Open — First no access to re- inspect violation
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north, the 1st room from east at north, the bathroom , the 1st room from east at south located at apt 1, 1st story, 1st apartment from east at south

    May 21, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    May 21, 2024 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... approx 1sq ft at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    May 21, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at 1st window frame from north at east wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from east at south

    May 21, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at north located at apt 1, 1st story, 1st apartment from east at south

    May 21, 2024 · Apt 1

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 28, 2024

    Open — Info nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 1st room from east at south located at apt 1, 2nd story, 1st apartment from east at south

    Mar 26, 2024 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of hot water exceeds the maximum allowable operating temperature of 130f. (150f found) in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south

    Mar 26, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south

    Mar 26, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at 1st window frame from north at east wall in the 1st room from east at south located at apt 1, 2nd story, 1st apartment from east at south

    Mar 26, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at 1st window frame from north at east wall in the 1st room from east at north located at apt 1, 2nd story, 1st apartment from east at south

    Mar 26, 2024 · Apt 1

    Open — Nov sent out

DOB building violations

2 DOB violations, newest first.

  • Construction other optional

    Work/without a permit noted;at cellar level installed water and waste lines to washing machine and gas line to gas dryer. obtain permit

    Jun 3, 2021

    Vw*-violation - work w/o permit dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 7, 2018

    Dob violation - dismissed

ECB violations

6 ECB violations, newest first.

  • Class - 1

    Ecb and pswo issued for work wwp. observed, demo of 100% of extg conc slab in cellar removed and 50% of the conc slab in cellar replaces and installed with new. conc.at lower elevation. new partitions walls ins

    Jun 10, 2026 · Penalty $12,500

    Active
  • Class - 1

    Ecb and pswo issued for work without permit. observed drainpipe installed in cellar floor for drainage and at 1st floor and 2nd floor bathrooms, to faceplate drainage from 2nd floor to the cellar. no record on

    Jun 10, 2026 · Penalty $12,500

    Active
  • Class - 1

    Work without a permit. failure to comply with the commissioner's order contained in summons/violation #35307102m issued on 12/03/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102.01

    Apr 26, 2018

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in summons/violation #35307102m issued on 12/03/17 and to file a certificate of correction. rmdy: comply w/summons. comply w/commissioner's order.

    Mar 6, 2018

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation 35307102m issued on 12/05/17 and to file a certificate of correction pursuant to 28-201.1 and 1 rcny 102-01.no permit or application

    Jan 26, 2018

    Resolve
  • Class - 1

    Work without permit; work noted: at cellar level installed water and waste lines for (3) piece bathroom (toilet, sink, tub) and washer. installed gas line for dryer. rem: obtain permit.

    Dec 5, 2017

    Resolve