44-20 63 Street
Queens, NY 11377BBL 4-02324-0035Map
Owner of record: The Woodysun Housing Develp Fund Corp
44-20 63 Street is an elevator apartment building built in 1982 in Queens, 11377. It has 78 residential units across 6 floors. The owner of record is The Woodysun Housing Develp Fund Corp. HPD has recorded 38 housing violations here, most recently on June 3, 2025. 8 of the 38 most recent violations are still open.
- HPD violations
- 38
- DOB violations
- 54
- ECB violations
- 19
- HPD complaints
- 70
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 38
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing
Jun 3, 2025
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5e, 5th story, 2nd apartment from west at north
Apr 16, 2025 · Apt 5E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze bathtub in the bathroom located at apt 5e, 5th story, 2nd apartment from west at north
Apr 16, 2025 · Apt 5E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall and ceiling in the kitchen located at apt 5e, 5th story, 2nd apartment from west at north
Apr 16, 2025 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 2nd apartment from west at north
Oct 17, 2024 · Apt 5E
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5e, 5th story, 2nd apartment from west at north
Oct 17, 2024 · Apt 5E
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5e, 5th story, 2nd apartment from west at north
Oct 17, 2024 · Apt 5E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department east wall in the kitchen located at apt 5e, 5th story, 2nd apartment from west at north
Oct 17, 2024 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 5e, 5th story, 2nd apartment from west at north
Oct 17, 2024 · Apt 5E
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard
Mar 14, 2021
Closed — Violation closed
Show 28 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood window sill at west wall in the 2nd room from east located at apt 6b, 6th story, 4th apartment from south at west
Mar 14, 2021 · Apt 6B
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west yard
Mar 14, 2021
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of 5 refrigerators with doors attached being stored at west yard
Mar 14, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 6b, 6th story, 4th apartment from south at west
Mar 14, 2021 · Apt 6B
Closed — Violation closed - BHazardous
Replace with new the broken or defective wash basin cabinet in the bathroom located at apt 6b, 6th story, 4th apartment from south at west
Mar 14, 2021 · Apt 6B
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entire apartment located at apt 5e, 5th story, 2nd apartment from north at east
Sep 11, 2018 · Apt 5E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 5e, 5th story, 2nd apartment from north at east
Jul 2, 2018 · Apt 5E
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the 1st room from east located at apt 5e, 5th story, 2nd apartment from north at east
Jul 2, 2018 · Apt 5E
Closed — Violation closed - ANon-hazardous
Refit upper & lower window sashes at east wall in the 1st room from east located at apt 5e, 5th story, 2nd apartment from north at east
Jul 2, 2018 · Apt 5E
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4d, 4th story, 1st apartment from west at north
Jul 20, 2016 · Apt 4D
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires south wall at elevator at public hall, 1st story
May 31, 2013
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Feb 26, 2013
Closed — Violation closed - BHazardous
Properly repair the broken or defective handicap access automatic entrance door at public hall, 1st story
Feb 26, 2013
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 4d, 4th story
Sep 4, 2012 · Apt 4D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings in the entire apartment located at apt 3c, 3rd story
Apr 24, 2012 · Apt 3C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... walls and ceiling in the bathroom located at apt 3c, 3rd story
Apr 24, 2012 · Apt 3C
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 4d, 4th story, 1st apartment from north at east
May 19, 2011 · Apt 4D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings in the entire apartment located at apt 4f, 4th story, 3rd apartment from west at north
Apr 18, 2010 · Apt 4F
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed water leak ceiling in the 1st living room from east located at apt 1l, 1st story
Nov 10, 2004 · Apt 1L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the 1st living room from east located at apt 1l, 1st story
Nov 10, 2004 · Apt 1L
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1l, 1st story
Nov 10, 2004 · Apt 1L
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 10, 2004
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed leak ceiling front room and bathroom 7 sty apt 7k. , section '' ''
Sep 5, 1995 · Apt 7K
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling 7 sty apt 7k bathroom. , section '' ''
May 5, 1995 · Apt 7K
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color window reveal 7 sty apt 7k front room. , section '' ''
May 5, 1995 · Apt 7K
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color bathroom north and south walls 7 sty southeast apt 7k. , section '' ''
Apr 24, 1995 · Apt 7K
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department bathroom ceiling 7 sty southeast apt 7k. , section '' ''
Apr 24, 1995 · Apt 7K
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling south room 7 sty southeast apt 7k. , section '' ''
Apr 24, 1995 · Apt 7K
Closed — Violation closed
DOB building violations · 54
- Construction other optional
Ftm bldg facade & appurtances. bulging masonry brick @ parapet lvl exp 3 s ele.remedy:owner to retain nys pe w/qewi cert & facade experience to inspect 100%hands on,evaluate safety & same cause of failure create report of results of insp of cause of fail.permit work. submit report & repair drawings to [email protected] by 7/24/2026
Jul 9, 2026
Dob violation - active - Construction other optional
Emergency work order to install shed at exp3 (s elev) due to loose masonry at parapet level. remedy: immediately install protection under the supervision of registered design professional
Jul 7, 2026
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 30, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 30, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Mar 4, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 19
- Class - 1
Failure to provide adequate safety measure such as sidewalk shed at designated unsafe facade. noted: observed at exp 3(s. elev) loosed masonry at parapet level. also observed cracked window framing in proximity
Jul 9, 2026 · Penalty $10,000
Active - Class - 2
Repair and restore to service.
Oct 8, 2024
Resolve - Class - 3
Failure to post exterior wall conditions as require under 1rcny 103.04note at the time of inspections observed that no certificate was posted.rem:post certificate on wall(lobby).
Jan 26, 2023 · Penalty $500
Active - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #911088.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
67x10,81y13,68m07. 67x10-repair emergency phone; 81y13-seal cylinder piston; 68m07-provide updated maintenance log in motor room.
May 22, 2018 · Penalty $625
Resolve - Class - 1
Sec. 3307.6.5 failure to maintain adequate illumination beneath sidewalk shed as required by code. noted: sidewalk shed erected under job#440116866 along exposure 61 street & back of the premises facing childre
Jan 8, 2016 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved construction document &/or approved amendments. note: sidewalk has been erected at exp #1 (64 st) & exp #3(61 st) the sws height is 13 feet that does not meet approved plans 8f
Dec 12, 2013 · Penalty $250
Resolve - Class - 2
Failure to maintain building in code-compliant manner.notedaa; 1-automatic doors for handicap ingress and egress not functioning at time of inspection;2-barricades setup at main side walk entrance to street w/o
Feb 24, 2013 · Penalty $500
Active - Non-hazardous
83**.83-restore elevator back to service.
Jul 6, 2007
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certiying to the installation of required fire protection systems remedy file report
Jan 25, 1999 · Penalty $400
Resolve
Show 9 more ↓
- Non-hazardous
74r,30o, 74r. 3 yr. test repairs.
May 6, 1998
Resolve - Non-hazardous
74r,30o, 74r. 3 yr. test repairs.
May 6, 1998
Resolve - Non-hazardous
74r30o
May 6, 1998 · Penalty $2,500
Resolve - Non-hazardous
74r30o
May 6, 1998 · Penalty $2,500
Resolve - Hazardous
Failure to file an amended report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5) indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an amended rep
Feb 2, 1993 · Penalty $1,000
Resolve - Hazardous
Failure to file an amended report acceptable to this department pursuant to rule rcny 32-03b(5) indicating correction of hazardous condition described in initial ll10/80 report. remedy: file an amended report f
Aug 12, 1992 · Penalty $400
Resolve - Non-hazardous
22d,50y,50y, (22)-secure from car top.
Apr 29, 1992
Resolve - Non-hazardous
50#, (50)- installed new pump unit, tank, controller without a permit.
Apr 29, 1992 · Penalty $1,000
Resolve - Non-hazardous
37##, 43##. (37 & 43) installed new controller & pump unit wihout a permit.
Jan 16, 1991
Resolve
Complaints
- Plumbing
Water supply
Feb 8, 2026 · Apt 5B
Close - Unsanitary condition
Mold
Jun 9, 2025 · Apt 5E
Close - Unsanitary condition
Mold
May 29, 2025 · Apt 5E
Close - Flooring/stairs
Floor
May 29, 2025 · Apt 5E
Close - Paint/plaster
Ceiling
Apr 28, 2025 · Apt 5E
Close - Paint/plaster
Wall
Apr 28, 2025 · Apt 5E
Close - Plumbing
Toilet
Apr 28, 2025 · Apt 5E
Close - Plumbing
Bathtub/shower
Apr 28, 2025 · Apt 5E
Close - Unsanitary condition
Mold
Apr 10, 2025 · Apt 5E
Close - Paint/plaster
Wall
Apr 10, 2025 · Apt 5E
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Apr 10, 2025 · Apt 5E
Close - Flooring/stairs
Floor
Apr 10, 2025 · Apt 5E
Close - Paint/plaster
Wall
Apr 10, 2025 · Apt 5E
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt 5E
Close - Plumbing
Bathtub/shower
Dec 30, 2022 · Apt 5E
Close - Plumbing
Basin/sink
Dec 30, 2022 · Apt 5E
Close - Appliance
Refrigerator
Oct 18, 2022 · Apt 5E
Close - Plumbing
Basin/sink
Jan 10, 2022 · Apt 15E
Close - Plumbing
Bathtub/shower
Jan 10, 2022 · Apt 15E
Close - Unsanitary condition
Mold
Mar 4, 2021 · Apt 5E
Close - General
Cabinet
Mar 4, 2021 · Apt 5E
Close - Paint/plaster
Wall
Mar 4, 2021 · Apt 5E
Close - Plumbing
Basin/sink
Mar 4, 2021 · Apt 5E
Close - Flooring/stairs
Floor
Mar 4, 2021 · Apt 5E
Close - Paint/plaster
Wall
Dec 8, 2020 · Apt 6B
Close - Electric
No lighting
Nov 23, 2020 · Apt 5E
Close - Unsanitary condition
Pests
Sep 18, 2020 · Apt 1J
Close - Unsanitary condition
Pests
Sep 18, 2020 · Apt 1J
Close - Unsanitary condition
Pests
Aug 18, 2020 · Apt ALLOVE
Close - Unsanitary condition
Garbage/recycling storage
Aug 18, 2020 · Apt BLDG
Close - Door/window
Window frame
Jun 13, 2018 · Apt 5E
Close - Flooring/stairs
Floor
Jun 13, 2018 · Apt 5E
Close - Plumbing
Bathtub/shower
Jun 13, 2018 · Apt 5E
Close - Paint/plaster
Ceiling
Jun 13, 2018 · Apt 5E
Close - Water leak
Heavy flow
Jun 13, 2018 · Apt 5E
Close - Appliance
Electric/gas range
Oct 10, 2017 · Apt 1G
Close - Plumbing
Basin/sink
Jul 19, 2016 · Apt 4D
Close - Heat/hot water
Entire building
May 12, 2016 · Apt 7L
Close - Heat/hot water
Entire building
Feb 20, 2016 · Apt 7L
Close - Heat/hot water
Entire building
Jan 1, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
May 6, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
May 6, 2015 · Apt 1L
Close - Heat/hot water
Entire building
May 6, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 27, 2015 · Apt 4F
Close - Heat/hot water
Entire building
Apr 27, 2015 · Apt BLDG
Close - Plumbing
Radiator
Oct 24, 2014 · Apt 2K
Close - Plumbing
Radiator
Oct 24, 2014 · Apt 2K
Close - Heat/hot water
Entire building
May 6, 2014 · Apt 3D
Close - Construction
Elevator
Mar 1, 2013 · Apt 4D
Close - Electric
Electric-supply
Feb 24, 2013 · Apt 4D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 1982
- Floors
- 6
- Residential units
- 78
- Building area
- 58,000 ft²
- Lot area
- 18,000 ft²
- Zoning
- R7X
- Community board
- 402
- Council district
- 26
- Block / lot
- 2324 / 35
- Assessed value
- $3,071,700
- Landmark / historic district
- No
HPD registration #422223, last renewed Sep 11, 2025.
Questions about 44-20 63 Street
Who owns 44-20 63 Street?
The owner of record in NYC Department of City Planning PLUTO data is The Woodysun Housing Develp Fund Corp.
Does 44-20 63 Street have violations?
Yes. NYC HPD has recorded 38 housing violations at this property.
Is 44-20 63 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 44-20 63 Street built?
City records list 1982 as the year it was built.
How many apartments are in 44-20 63 Street?
It has 78 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.