Violations at 50-31 47 Street
Queens, NY 11377 · BBL 4-02297-0021 · Back to the property
HPD housing violations
The newest 50 of 79 HPD violations. The city keeps the complete history.
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at cellar for rat droppings in the entire apartment located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Notice of issuance sent to tenant - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at wash basin in the bathroom located at apt 1floor upper level, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Replace with new the missing ceramic wall tiles at north, west and east wall in the bathroom located at apt 1floor upper level, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, north and west wall in the bathroom located at apt 1floor upper level, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 1floor upper level, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1floor upper level, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet and less than 30 square feet observed at east and north wall in the 2nd room from east located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, east and north wall in the 2nd room from east located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 3rd room from east located at apt 1floor upper level, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from east located at apt 1floor upper level, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 square feet observed at ceiling in the kitchen located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at unkeyed ceiling in the kitchen located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the kitchen located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1floor, 1st story, 1st apartment from north at east
Oct 9, 2026 · Apt 1FLOOR
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures range in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 27, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 27, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of excavation of front yard
Jun 19, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Feb 8, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Feb 8, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Feb 8, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving building front yard
Nov 11, 2025
Open — Nov sent out - BHazardous
Remove the illegal fastening key operated double cylinder lock at exit door to front yard at cellar
Nov 11, 2025
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at electrical panel at cellar
Nov 11, 2025
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at rats in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling and all walls in the 2nd room from east located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and all walls in the 2nd room from east located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening key operated double cylinder lock at exit door to rear yard in the 2nd room from east located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling and all walls in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and all walls in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of key operated double cylinder lock installed at door leading to upper level in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls in the bathroom located at apt privat, 1st story, 1st apartment from north at east
Oct 29, 2025 · Apt PRIVAT
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the private hallway located at apt privat, 1st story, 1st apartment from north at east
Oct 29, 2025 · Apt PRIVAT
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt privat, 1st story, 1st apartment from north at east
Oct 29, 2025 · Apt PRIVAT
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the kitchen located at apt privat, 1st story, 1st apartment from north at east
Oct 29, 2025 · Apt PRIVAT
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the kitchen located at apt privat, 1st story, 1st apartment from north at east
Oct 29, 2025 · Apt PRIVAT
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt privat, 1st story, 1st apartment from north at east
Oct 29, 2025 · Apt PRIVAT
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Oct 24, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Oct 24, 2025 · Apt 1
Open — Nov sent out
DOB building violations
No DOB violations on record
ECB violations
4 ECB violations, newest first.
- Class - 3
Work w/o a permit,canopy. noted: erected metal canopy over front entrence exposure 1. approx size is 8ft x 8ft x 10ft high. remedy: obtain permit.
Oct 26, 2012 · Penalty $200
Active - Hazardous
Work w/o a permit work noted:at cellar level erection partitions & installed water & waste lines for 3pc bathrm (sink,toilet & shower) residential sink & gas line with stove.remedy:obtain permit or restore to
Jan 7, 2008 · Penalty $2,500
Active - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families dob's records cofo # 75200 indicates premises to be legally approved for 2 family cellar boiler rm & storage
Jan 7, 2008 · Penalty $7,000
Active - Non-hazardous
Work w/o a permit. work noted: first floor rear attached extension approx. 9 feet deep x 10 feet wide x 11 feet high with entry door & window on south side with flat roof. remedy: obtain permits
Apr 28, 2005
Resolve