roofy

Violations at 48-17 47 Street

Queens, NY 11377 · BBL 4-02291-0017 · Back to the property

HPD housing violations

The newest 50 of 71 HPD violations. The city keeps the complete history.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 6, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective intercom system at the east wall in the 2nd room from east located at apt 2f, 2nd story, 1st apartment from south at west

    Jul 6, 2025 · Apt 2F

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Jul 6, 2025 · Apt 2F

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 11, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the 4th room from east at south located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east at north located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the 4th room from east at north located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Paint metal in accordance with dept. regulation at 1st riser from east at south wall in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall, 1st closet from north at east wall door in the 4th room from east at south located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 1, 2025 · Apt 2F

    Open — Nov sent out
  • CImmediately hazardous

    Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Feb 4, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Feb 4, 2025

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 12, 2024

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures range in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west

    May 18, 2023 · Apt 2F

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 28, 2023

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective light fixture at vestibule at public hall, 1st story

    Jan 19, 2023

    Open — Invalid certification
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jan 3, 2023

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Jan 3, 2023

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jan 3, 2023

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector defective located at apt 1f, 1st story, 1st apartment from west at north

    Jan 3, 2023 · Apt 1F

    Open — Invalid certification
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 1f, 1st story, 1st apartment from west at north

    Jan 3, 2023 · Apt 1F

    Open — Invalid certification
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 3, 2022

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 14, 2021

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 1, 2019

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 23, 2018

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Nov 14, 2017

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 14, 2017

    Open — Nov sent out
  • BHazardous

    Properly secure the loose electric cover at south wall in the bathroom located at apt 2r, 2nd story, apartment at east

    Nov 2, 2017 · Apt 2R

    Open — Invalid certification
  • BHazardous

    Abate the nuisance consisting of roaches in the entire apartment located at apt 2r, 2nd story, apartment at east

    Nov 2, 2017 · Apt 2R

    Open — Invalid certification
  • CImmediately hazardous

    M/d law abate the nuisance consisting of scalding hot water exceeds the maximum allowed of 130 degrees found hot water to be 134 degrees thermometer #92197 in the kitchen located at apt 2r, 2nd story, apartment at east

    Nov 2, 2017 · Apt 2R

    Closed — Violation closed
  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present

    Nov 23, 2016

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 15, 2015

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair the broken or defective locking device on door to vestibule at public hall, 1st story

    Nov 6, 2014

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story

    May 9, 2014 · Apt 1R

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... mildew north wall around windows in the 1st room from east located at apt 3f, 3rd story

    May 9, 2014 · Apt 3F

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 3f, 3rd story

    May 9, 2014 · Apt 3F

    Closed — Violation dismissed
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3f, 3rd story

    May 9, 2014 · Apt 3F

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective ceiling ventilation in the bathroom located at apt 2r, 2nd story, apartment at east

    Apr 1, 2014 · Apt 2R

    Closed — Violation dismissed
  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ***minimum 100 watts of incandescent light required.(fixture present)***

    Jul 13, 2013

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of roaches located at apt 2f, 2nd story, 1st apartment from south at west

    Nov 20, 2012 · Apt 2F

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 2f, 2nd story, 1st apartment from south at west

    Nov 20, 2012 · Apt 2F

    Closed — Violation closed
  • BHazardous

    Repair or replace the smoke detector inoperative located at apt 2f, 2nd story, 1st apartment from south at west

    Nov 20, 2012 · Apt 2F

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 4th room from east at south, the private hallway , the 2nd room from east located at apt 2f, 2nd story, 1st apartment from south at west

    Oct 23, 2012 · Apt 2F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west

    Oct 23, 2012 · Apt 2F

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 2f, 2nd story, 1st apartment from south at west

    Oct 23, 2012 · Apt 2F

    Closed — Violation closed

DOB building violations

21 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - active
  • Boiler boiler optional

    3/20b flue pipe not completely sealed into base of chimney-oil line exposed

    May 10, 1990

    Vp-violation unserved ecb-active
  • Construction other optional

    Mm

    Dec 12, 1989

    Dob violation - active

ECB violations

2 ECB violations, newest first.

  • Hazardous

    Residence legally approved for occupancy of a dwelling as dept recordsof finance which state walk up apartment residence now illegally alte red for occupancy in the cellar .altered work noted construction the

    Nov 10, 2003 · Penalty $3,000

    Resolve
  • Hazardous

    3, 20b, flue pipe not completly sealed into base of chimney oil line exposed.

    May 10, 1990 · Penalty $170

    Active