48-29 45 Street
Queens, NY 11377BBL 4-02289-0012Map
Owner of record: Nuptse, LLC
48-29 45 Street is a walk-up apartment building built in 1928 in Queens, 11377. It has 5 residential units across 3 floors. The owner of record is Nuptse, LLC. HPD has recorded 52 housing violations here, most recently on December 3, 2024. 5 of the 50 most recent violations are still open.
- HPD violations
- 52
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 29
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 52
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on entrance door to cellar at public hall, 1st story
Dec 3, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on door in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Aug 27, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 1r, 1st story, 1st apartment from north at east
Aug 27, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective rubber gasket on door at refrigerator in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
Aug 27, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Aug 27, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Aug 27, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door bell system from vestibule to buzzer device at west wall in the foyer located at apt 1r, 1st story, 1st apartment from north at east
Aug 27, 2024 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 4th room from east located at apt 1r, 1st story, 1st apartment from north at east
Aug 27, 2024 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 16, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective street entance door latch to building , 1st story
Jul 16, 2024
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective street entance door latch to building , 1st story
Jul 16, 2024
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 6th room from east located at apt 1r, 1st story, 1st apartment from north at east
Jul 14, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective rubber door gaskets at refrigerator in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
Jul 14, 2024 · Apt 1R
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
Jul 14, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at east wall in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
Jul 14, 2024 · Apt 1R
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the 6th room from east located at apt 1r, 1st story, 1st apartment from north at east
Jul 14, 2024 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jul 9, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening self lockable panic bar installed on bulkhead door to roof at public hall, 3rd story
Jul 9, 2024
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 13; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Jun 24, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall in the 4th room from east located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall in the 1st room from east at south located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the private hallway located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 4th room from east located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 5th room from east located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall in the 1st room from east at north located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall in the private hallway located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall, 1st window frame from east at south wall in the 5th room from east located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 6th room from east located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, 1st window frame from south at west wall in the 6th room from east located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the 1st room from east at north located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from east at south wall in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
May 21, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold articles at public hall, 2nd story
Mar 16, 2016
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from north at east
Mar 16, 2016 · Apt 2R
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 2r, 2nd story
Mar 9, 2016 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). .............missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Mar 9, 2016 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector ............missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Mar 9, 2016 · Apt 2R
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in ......... washbasin in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Mar 9, 2016 · Apt 2R
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in ....at kitchen sink waste line in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Mar 9, 2016 · Apt 2R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 26, 2015
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at entrance door to 3 sty apt 3r. , section '' ''
Jan 13, 1992 · Apt 3R
Open — First no access to re- inspect violation
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Class - 1
28-210.1 multiple dwelling converted maintained or occupied with 3 or more dwelling units that legally authoirzed by dob records.noted apt #1r illegally converted into 4 sro rooms.rmdy:restore top rjor legal
Oct 30, 2015
Resolve - Class - 1
Failure to maintain building in code compliant manner. lack of a system of automatic sprinklers wehre reqruied per bc 903.2 - 27-954 for srorooms in apt #1r. rmdy: discontinue illegal occupancy.
Oct 30, 2015
Resolve - Class - 1
Work w/o permit. work noted: erect full height partitions to create 6 rooms, electrical wiring, worn 100% complete. rmdy: stop all work. obtain permit.
Oct 30, 2015
Resolve
Complaints
- Heat/hot water
Entire building
Dec 30, 2025 · Apt BLDG
Close - Electric
No lighting
Aug 26, 2024 · Apt 1R
Close - Appliance
Electric/gas range
Aug 26, 2024 · Apt 1R
Close - Appliance
Refrigerator
Aug 26, 2024 · Apt 1R
Close - Safety
Window guard broken/missing
Aug 26, 2024 · Apt 1R
Close - Paint/plaster
Wall
Aug 26, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Aug 26, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Aug 26, 2024 · Apt 1R
Close - Paint/plaster
Wall
Aug 26, 2024 · Apt 1R
Close - Water leak
Heavy flow
May 19, 2024 · Apt 1R
Close
Show 19 more ↓
- Unsanitary condition
Mold
May 19, 2024 · Apt 1R
Close - Appliance
Electric/gas range
May 19, 2024 · Apt 1R
Close - Appliance
Refrigerator
May 19, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Jun 6, 2022 · Apt FLOOR1
Close - Unsanitary condition
Pests
Jun 6, 2022 · Apt 123
Close - Heat/hot water
Entire building
Nov 29, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2020 · Apt 3R
Close - Heat/hot water
Entire building
Jan 5, 2020 · Apt 3F
Close - Electric
Power outage
Jan 5, 2020 · Apt 3F
Close - Plumbing
Basin/sink
Mar 9, 2016 · Apt 2R
Close - Unsanitary condition
Pests
Mar 9, 2016 · Apt 2R
Close - Heat/hot water
Apartment only
Mar 9, 2016 · Apt 2R
Close - Unsanitary condition
Pests
Mar 9, 2016 · Apt 2R
Close - Safety
Carbon monoxide detector
Mar 9, 2016 · Apt 2R
Close - Plumbing
Basin/sink
Mar 9, 2016 · Apt 2R
Close - Unsanitary condition
Pests
Mar 6, 2016 · Apt 2R
Close - Plumbing
Basin/sink
Sep 24, 2015 · Apt 2R
Close - Appliance
Electric/gas range
Sep 24, 2015 · Apt 2R
Close - Plumbing
Basin/sink
Sep 24, 2015 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1928
- Floors
- 3
- Residential units
- 5
- Building area
- 3,600 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5
- Community board
- 402
- Council district
- 26
- Block / lot
- 2289 / 12
- Assessed value
- $360,000
- Landmark / historic district
- No
HPD registration #407175, last renewed Jun 12, 2026.
Questions about 48-29 45 Street
Who owns 48-29 45 Street?
The owner of record in NYC Department of City Planning PLUTO data is Nuptse, LLC.
Does 48-29 45 Street have violations?
Yes. NYC HPD has recorded 52 housing violations at this property.
Is 48-29 45 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 48-29 45 Street built?
City records list 1928 as the year it was built.
How many apartments are in 48-29 45 Street?
It has 5 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.