roofy

Violations at 76-18 Grand Central Pkwy

Queens, NY 11375 · BBL 4-02267-0129 · Back to the property

HPD housing violations

The newest 50 of 53 HPD violations. The city keeps the complete history.

  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2022

    Closed — Violation dismissed
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard

    Jun 6, 2022

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jun 6, 2022 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jun 6, 2022 · Apt 1R

    Open — Nov sent out
  • ANon-hazardous

    Refit door to rear yard in the 2nd room from north at east located at apt 1r, 1st story, 1st apartment from east at south

    Jun 6, 2022 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective lock at sliding door to rear yard in the 2nd room from north at east located at apt 1r, 1st story, 1st apartment from east at south

    Jun 6, 2022 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of household items at public hall, 1st story

    Jun 6, 2022

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jun 6, 2022

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jun 6, 2022

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 6, 2022

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Jun 6, 2022

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 6, 2022

    Open — Nov sent out
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Jun 6, 2022

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair the broken or defective lock at vestibule door to 1 story public hall , 1st story

    Jun 6, 2022

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the visible mold condition... at ceiling (5 sqft) in the bathroom located at apt 1r, 1st story, 1st apartment from east at south original violation 14492282 issued 19-aug-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Aug 19, 2021 · Apt 1R

    Open — Defect letter issued
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 19, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 19, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Aug 19, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 19, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Aug 19, 2021

    Open — Nov sent out
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 19, 2021

    Open — Nov sent out
  • ANon-hazardous

    Properly repair the broken or defective sliding door guide to read yard in the 2nd room from north located at apt 1r, 1st story, 1st apartment from east at south

    Aug 19, 2021 · Apt 1R

    Open — Nov certified late
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... at ceiling (5 sqft) in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Aug 19, 2021 · Apt 1R

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Aug 19, 2021 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Aug 19, 2021 · Apt 1R

    Open — Nov sent out
  • CImmediately hazardous

    Code: arrange and make self-closing the doors in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Aug 19, 2021 · Apt 1R

    Open — Invalid certification
  • ANon-hazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at rear yard

    Aug 19, 2021

    Open — Nov certified late
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Aug 18, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Aug 18, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 18, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 18, 2021

    Open — Nov sent out
  • CImmediately hazardous

    Code: arrange and make self-closing the doors apartment entrance door in the entrance located at apt 1r, 1st story, 1st apartment from south at west

    Aug 18, 2021 · Apt 1R

    Open — Invalid certification
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 18, 2021 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the visible mold condition... at north wall and ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 18, 2021 · Apt 1R

    Open — Defect letter issued
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Aug 18, 2021 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the visible mold condition... south wall 6 sq ft in the kitchen located at apt 1r, 1st story, 1st apartment from south at west original violation 14383823 issued 02-jul-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 2, 2021 · Apt 1R

    Open — Defect letter issued
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Jul 2, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 2, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 2, 2021

    Open — Nov sent out
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jul 2, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 2, 2021

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & north wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Jul 2, 2021 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Jul 2, 2021 · Apt 1R

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Jul 2, 2021 · Apt 1R

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Jul 2, 2021 · Apt 1R

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Properly repair the broken or defective wall cabinets in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Jul 2, 2021 · Apt 1R

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Jul 2, 2021 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Jul 2, 2021 · Apt 1R

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... south wall 6 sq ft in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Jul 2, 2021 · Apt 1R

    Closed — Violation closed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2021

    Closed — Violation dismissed

DOB building violations

6 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 3, 2017

    Dob violation - active
  • Construction other optional

    Rs

    Jan 18, 1990

    Dob violation - dismissed
  • Construction other optional

    Rs

    Jan 18, 1990

    Dob violation - dismissed
  • Construction other optional

    Rs

    Jan 18, 1990

    Dob violation - dismissed
  • Construction other optional

    Rs

    Jan 18, 1990

    Dob violation - dismissed
  • Construction other optional

    Jd

    Dec 19, 1989

    Dob violation - dismissed

ECB violations

4 ECB violations, newest first.

  • Class - 1

    Failure to maintain buidling in code compliant manner.time of inspection 12:10pm.at time of inspection in apartment 4r(4b)flexible connectors to hot water heater and gas fired heater prohibited metered must be

    Feb 1, 2017 · Penalty $1,000

    Active
  • Hazardous

    Failure to protect adjoining structures during excavation operations. remedy: stop all work. provide sheeting.

    Mar 22, 1990 · Penalty $860

    Resolve
  • Hazardous

    Failure to provide protection at sides of excavation. remedy: stop all work. submit plans, shores and bracing as required

    Jan 18, 1990 · Penalty $400

    Resolve
  • Hazardous

    Failure to provide protection at sides of excavation. no sheeting or bracing at north soutn and west wall. remedy: stop all work. provide sheeting and bracing at all required areas.

    Jan 12, 1990 · Penalty $400

    Resolve