75-42 Grand Central Pkwy

Queens, NY 11375BBL 4-02265-0103Map

Owner of record: Gc 42 LLC

75-42 Grand Central Pkwy is a walk-up apartment building built in 2019 in Queens, 11375. It has 10 residential units across 6 floors. The owner of record is Gc 42 LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
0
ECB violations
37
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 0

No DOB violations on record

ECB violations · 37

  • Class - 2

    During my inspection of 6 story nb, observed a supported scaffold approx. 36ft high at exposure #3 which was not in use at time of inspection, scaffold was missing numerous end-rails, toe-boards, levels not ful

    Dec 20, 2023

    Resolve
  • Class - 2

    I observed 5 workers on site a sidewalk shed installed at exposure 1 and scaffold installed at expos 1&3 (expo 1 on top of shed) upon request to see the following documents to be kept on site none were provided

    Aug 30, 2023 · Penalty $625

    Resolve
  • Class - 2

    Upon inspection of an active 6 story nb i observed work not contrary to the submitted site safety plan. contrary to ssp no roof protection was provided for 1 story neighboring gar at rear of exposure 2 along wi

    Aug 30, 2023 · Penalty $625

    Resolve
  • Class - 2

    I observed a side walk shed installed contrary to code. sidewalk shed did not cover full width of sidewalk and shed leg post landed beyond the 18" min from curb line as per code bc3307.6.3 at approx. 62". as we

    Aug 30, 2023 · Penalty $2,400

    Resolve
  • Class - 2

    I observed pedestrian protection(side walk shed) with pipe scaffold installed on top maintained contrary to code. i observed dirt and debris covered sidewalk shed footings as well as deteriorating/rotted sidewa

    Aug 30, 2023 · Penalty $2,400

    Resolve
  • Class - 1

    At time of inspection of nb 6 story active jobsite observed worker,cs (han kyu park),on jobsite, upon review dob records it was observed the cs license# 021364, expired on 03/12/23 and job site was active and h

    Apr 27, 2023

    Resolve
  • Class - 1

    At time of inspection of nb 6 story building active jobsite observed sws installed at exp1, sf installed at exp1,3, platforms at elevator shafts, pulley installed at bulkhead, upon request from cs to see the da

    Apr 27, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Violation # 39508574j was issued for unsafe supported scaffold, and it is not in compliance without certificate of correction filled and scaffold not repaired. the ecb violation was re-written.

    Mar 24, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Violation # 39508576n under complaint # 4906445 was issued on 11/01/2022 for no design drawings for platform. job site not in compliance, no drawings and no certificate of correction. the ecb violation was re-w

    Mar 24, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Violation # 39508590j under complaint # 4906449 for inadequateunsafe vertical netting at 6th fl, missing toe-boards on multiple floors was not corrected or certificate of correction filled. the ecb violation wa

    Mar 24, 2023 · Penalty $2,500

    Resolve
Show 27 more ↓
  • Class - 1

    Unsafe job site with pswo in place. inadequate guard rail system, netting and housekeeping.

    Mar 24, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection for a 6 story new building i observed no compliance from respondent in regard to previously issued violation 39508574j issued on 11-1-22 no certificate of correction was submitted to the d

    Jan 13, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection for a 6 story new building i observed no compliance from respondent in regard to previously issued violation 39508590j issued on 11-1-22 no certificate of correction was submitted to the d

    Jan 13, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection for a 6 story new building i observed no compliance from respondent in regard to previously issued violation 39508576n issued on 11-1-22 no certificate of correction was submitted to the

    Jan 13, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Observed sidewalk shed (sws) at exp#1 and supported scaffolds at exp#1,3- no approved design drawings for the supp scaff + sws, along with the sws daily inspection log and supp scaff pre-shift log were provided

    Nov 1, 2022 · Penalty $3,125

    Resolve
  • Class - 1

    Observed 6th flr vertical netting cables at the interior stair opening leading edge and the exp#1,3 leading edges were only approx. 30-35" high, the cables were severely loosened, and at least one post was seve

    Nov 1, 2022 · Penalty $12,500

    Resolve
  • Class - 1

    Observed temporary platforms in elevator shaft at all floors- built contrary to pe-approved dd- no wood ledger, wood planks/joist not extended 8'-1/4" past shaft opening, some planks/joists placed diagonally. a

    Nov 1, 2022 · Penalty $6,250

    Resolve
  • Class - 1

    Observed supported scaffold at exp#1,3 with the following conditions: missing guard rails/toe-boards on working platforms; missing pins on outriggers; loose and dislodged planks; loose netting; damaged and bent

    Nov 1, 2022 · Penalty $6,250

    Resolve
  • Class - 1

    At the time of inspection 6 stories nb i observed 2 workers on 3rd fl removing part of concrete slab deck and welding structural steel post support steel beam above floor as structural members as per approved

    Jul 6, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    Observed inadequate logs no actual orientations for all workers, superintendent time in/out, pre shift meeting, and tools box. 5 workers on 3rd fl deck working on cmu, veneer blocks on edge without fall arrest

    Jul 6, 2022 · Penalty $5,000

    Resolve
  • Class - 1

    At the time of inspection 6 stories new building about 7 workers i request site safety orientations to be provided on site the competent person provide piece of paper has signing all workers without any subject

    Jul 6, 2022 · Penalty $625

    Resolve
  • Class - 2

    At the time of inspection 6 stories new building i observed temporary platform at elevator shift i requested dd from competent person he provide inadequate dd without pe stamp no work at elevator shift provide

    Jul 6, 2022 · Penalty $1,280

    Resolve
  • Class - 1

    Observed 5 workers on 4th fl deck working on cmu, and veneer brick installation on the edges of the slab without any fall arrest system harness to be tied off to any structural members.2workers on 3rd fl deck r

    Jul 6, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    At the time of inspection 6 stories new building i observed supported scaffold at exp#1,3 has unsafe platform not tied down and missing guard rails and toe board, missing some location netting no exterior work

    Jul 6, 2022 · Penalty $1,280

    Resolve
  • Class - 2

    At the time of inspection 6 stories new building i observed construction fence at exp#1,# under permit #q00293427 expired on 01/07/2022, supported scaffold at exp#1,3 unsafe under permit #q00314359 expired on 0

    Jul 6, 2022 · Penalty $1,280

    Resolve
  • Class - 2

    Temporary equipment onsite(sws)expired permit.observed sidewalk shed still up at exp1.temporary construction equipment requires a permit at all times to remain installed.permit in dob now#q00273633-i1-sh expire

    May 5, 2022

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications. note:at time of my inspection observed sidewalk shed installed on pedestrian walkway and are not maintain as required. the sws under light was not on at

    Nov 5, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Housekeeping.at the time of inspection of an active 6 story building construction site i observed of construction materials.debris scatteredall over the site.materials,debris,tools laying on floors blocking egr

    Mar 5, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance w/section. at time of inspection @an active new bldg construction job site,i observed there was no const

    Feb 15, 2020

    Resolve
  • Class - 2

    Bc3301.7/failure to provide pre approved detail drawings.as noted at time of inspection on a active construction site,floor #4 metal deck placemen work.observed exposure #2,#4 stairwell steel panel staircase an

    Jan 30, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and or approved amendments.as noted:at time of inspection an active construction site observed at floor 4 metal deck placement work @ exposure #1 floor 2

    Jan 30, 2020

    Resolve
  • Class - 2

    Failure to safeguard all persons or property affected by construction operations.as noted:at time of inspection at an active construction site metal deck work on the floor #4.observe at exposure#2,front and rea

    Jan 30, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    3307.7.7 condition of fence @the time of inspection @a 4sty nb i observed a poorly maintained const fence. panels from the fence had fallen off into the garden of the adjoining property, there was protecting

    Dec 12, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    3307.2.1 obstruction of street or sidewalk @the time of inspection @4sty nb i observed materials tied together with caution tape in the street @exp1.these large materials were obstructing the street & could be

    Dec 12, 2019 · Penalty $625

    Resolve
  • Class - 2

    Bc 3301.7 failure to provide pe approved design drawing as noted @timeof my inspection. active site, foundation lvl i observed temporary structure {bridge} @expo#1 made of wooden platform posts. no pe approved

    Oct 2, 2019

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/are amendments, as noted @time of my inspection, active site, foundation phase i observed some solider piles were spaced(7-8) feet center to center

    Oct 2, 2019

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or amendments. as noted at time of my inspection observed excavation been done,w/ soe not conforming to the drawing. missing a section about 10'-0-12

    Sep 12, 2019

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
2019
Floors
6
Residential units
10
Building area
11,726 ft²
Lot area
3,000 ft²
Zoning
R6
Community board
406
Council district
29
Block / lot
2265 / 103
Assessed value
$831,600
Landmark / historic district
No

Questions about 75-42 Grand Central Pkwy

Who owns 75-42 Grand Central Pkwy?

The owner of record in NYC Department of City Planning PLUTO data is Gc 42 LLC.

Does 75-42 Grand Central Pkwy have violations?

NYC HPD has no housing violations on record for this property.

Is 75-42 Grand Central Pkwy rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 75-42 Grand Central Pkwy built?

City records list 2019 as the year it was built.

How many apartments are in 75-42 Grand Central Pkwy?

It has 10 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.