Violations at 110-26 63 Avenue
Queens, NY 11375 · BBL 4-02181-0018 · Back to the property
HPD housing violations
15 HPD violations, newest first.
- CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door .. in the entrance located at apt 1floor, 1st story, 1st apartment from north at east
Oct 29, 2021 · Apt 1FLOOR
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak east wall in the 1st room from east at north located at apt 1floor, 1st story, 1st apartment from north at east
Oct 29, 2021 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1floor, 1st story, 1st apartment from north at east
Oct 29, 2021 · Apt 1FLOOR
Open — Nov certified late - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1floor, 1st story, 1st apartment from north at east
Oct 29, 2021 · Apt 1FLOOR
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective reglaze bathtub in the bathroom located at apt iflr, 1st story
Dec 2, 2019 · Apt IFLR
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of scalding hot water of 140f in the kitchen located at apt iflr, 1st story
Dec 2, 2019 · Apt IFLR
Closed — Violation closed - BHazardous
Properly repair the broken or defective stove knobs in the kitchen located at apt iflr, 1st story
Dec 2, 2019 · Apt IFLR
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt iflr, 1st story
Dec 2, 2019 · Apt IFLR
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt iflr, 1st story
Dec 2, 2019 · Apt IFLR
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1, 1st story
Apr 7, 2010 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls & ceiling in the entire apartment located at apt 1, 1st story
Apr 7, 2010 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet at east wall in the 3rd room from north located at apt 1, 1st story
Apr 7, 2010 · Apt 1
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 1, 1st story
Apr 7, 2010 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of concealed water leak at ceiling in the 1st room from north at west located at apt 1, 1st story
Apr 7, 2010 · Apt 1
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
Apr 7, 2010 · Apt 1
Closed — Violation closed
DOB building violations
No DOB violations on record
ECB violations
1 ECB violations, newest first.
- Hazardous
Work without a permit. (hazardous) work noted: construction of a sheetrock duct, chimney flue 24" x 18" x 10 feet, leading through the roof. inside a closet used as a secondary means of egress. closet ceiling
Mar 20, 1998
Resolve