Violations at 48-01 90 Street
Queens, NY 11373 · BBL 4-01849-0001 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
The newest 50 of 83 DOB violations. The city keeps the complete history.
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Oct 10, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 22, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 22, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2015
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2003
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - dismissed - Elevator elevatorrequired
4p756
Sep 10, 2002
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Elevator elevatorrequired
4s46
Sep 5, 2001
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
ECB violations
The newest 50 of 175 ECB violations. The city keeps the complete history.
- Class - 2
Failure to maintain building in code-compliant manner. use of prohibited door and/or hardware per bc 1008.1.8; 27-371(j). noted: classrooms door have prohibited hardware(kickstops) on them at rm #s-217, 213, 20
Apr 14, 2026 · Penalty $1,250
Active - Class - 2
Re-issue #35719986k. failure to maintain bulding in code-compliant manner. illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. noted: emergency lights were not operational when t
Apr 14, 2026 · Penalty $3,125
Active - Class - 2
Re-issue #35719987m. failure to maintain building in code-compliant manner. noted: at rm #573 fan room, interior running crack, exterior staircase bulkhead cracks staircase walls. remedy: repair and/or replace.
Apr 14, 2026 · Penalty $3,125
Active - Class - 2
Re-issue #35719989x. failure to maintain building in code-compliant manner. noted: interior fire-proof doors do not self-close properly at 3rd flr staircase "e", "k". 2nd flr-staircase "c". classroom doors do n
Apr 14, 2026 · Penalty $3,125
Active - Class - 2
Re-issue #35719992r. failure to maintain building in code-compliant manner. noted: at 3rd floor corridor by rm #348, 357, 204(2) and hallwayby staircase "e" broken glass panels. remedy: and/or replace.
Apr 14, 2026 · Penalty $3,125
Active - Class - 2
Partial stop work order issued for working after hours without a permit noted at time of inspection workers were jackhammering inside of courtyard without a after hours permt stop all after hours work, obtain a
Dec 9, 2025 · Penalty $1,280
Active - Class - 2
Failure to maintain building in code-compliant manner. noted at electrical room foundation walls at bottoms water penetration, water puddling. remedy: repair and/or replace.
May 15, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner. noted at 3 floor corridor by 348, 357, 204(2), hallway by stair e broken glass panels. remedy: repair and/or replace.
May 15, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner. noted at 4 floor stair l at stairwell ceiling spalling and large crack. remedy: repair and/or replace.
May 15, 2025 · Penalty $1,250
Resolve - Class - 2
Exit door not self-closing. noted at 3 floor smoke stair c, 3e, 2 fl.(s) stair e, h, k base-b71, (s)exit 5, by b11, 1 fl.(s) main 2 doors and exits 4, 17 doors are not self-closing. remedy: repair/replace door.
May 15, 2025 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner. noted at 4 floor 437, 450, 434, 3 fl. 331, 2fl. 245, basement b3 doors are not self-closing. remedy: repair and/or replace.
May 15, 2025 · Penalty $1,250
Active - Class - 2
Reissue #35434176j. failure to maintain building in code-compliant manner. noted at tunnel in 1930 wing, water penetration ceiling tunnel flooded towards 91 street. remedy: repair and/or replace.
May 15, 2025 · Penalty $3,125
Active - Class - 2
Reissue #35682676z. failure to maintain building in code-compliant manner. noted at 573 fan room interior running crack, exterior stairwell bulkhead cracks stairwell walls. remedy: repair and/or replace.
May 15, 2025 · Penalty $3,125
Active - Class - 2
Reissue #35682677k. failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. noted at entire building all levels emergency light
May 15, 2025 · Penalty $3,125
Active - Class - 2
Reissue #35682678m. unlawful placement of furnishings, decorations or other objects at exits that, obstruct access to egress from or visibility thereof per fdny 2008 code; fc 102.7.4. noted at floor roof acces
May 15, 2025 · Penalty $3,125
Resolve - Class - 2
Operation of a place of assembly without a current certificate of operation.noted 2nd fl library arranged with approx.115 seats no pa permitposted or provided upon request.rem:obtain place at assembly certifica
Jun 4, 2024 · Penalty $800
Active - Class - 2
Failure to maintain building in code-compliant manner.noted at 4th fl dance room water penetrating through crack in skylight glass.rem:repair and/or replace.
Jun 4, 2024 · Penalty $625
Resolve - Class - 2
Failure to maintain buiding in code-compliant manner.noted 4th floor roof access from small auditorium obstructed by storage at piano,furniture,ladder,boxes & supplies.rem:comply with notice of violation.
Jun 4, 2024 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner:illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.noted:several emergency lights with battery back up power not working when t
Jun 4, 2024 · Penalty $625
Active - Class - 2
Reissue#35674936x failure to maintain building in code compliant manner.noted at top roof level.fan room#572,vertical crack on wall approx.5ft long with 1/2 separation.also horizontal crack approx.15ft long ru
Jun 4, 2024 · Penalty $625
Active - Class - 2
Reissue #35674935y. failure to maintain building in code-compliant manner. noted at auditorium sever water damage to ceiling. additionally at rooms #575. 359, 365 and gymnasium more eudemce at water penetration
Jun 4, 2024 · Penalty $625
Resolve - Class - 2
Reissued#35657740j failure to maintain building in code-compliant manner.observed at roof level over gym slate roof tiles are loose or missing.rem:repair and/or replace.
May 16, 2023 · Penalty $1,562
Resolve - Class - 2
Reissued#35657735p failure to maintain building in code-compliant manner.observed at roof level fan room has a vertical crack approx 5 feet long 1/2 under.rem:repair and/or replace.
May 16, 2023 · Penalty $1,562
Active - Class - 2
Reissued#35657736r failure to maintain building in code-compliant manner.observed auditorium main light not working and at upper severe water damage in ceiling.rem:repair and/or replace.
May 16, 2023 · Penalty $625
Resolve - Class - 2
Reissued#35657739m failure to maintain building in code-compliant manner.observed in cellar level inside oil tank room.foundation wall has become porcus allowing water in.rem:repair and/or replace.
May 14, 2023 · Penalty $1,562
Active - Class - 2
Reissue#35560929m.failure to maintain building in code compliant manner.noted observed at roof over gym slate roting tiles are loose or missing.remedy:repair and/or replace.
May 13, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue#35560930j.failure to maintain building in code compliant manner.noted observed at cellar foundation wall has been porous allowing water to penetrate.remedy:repair and/or replace.
May 13, 2022 · Penalty $1,562
Active - Class - 2
Reissue#35560931l.failure to maintain building in code compliant manner.noted observed self-closing door at staircase at front by 1st floor by b59 next to cafeteria stair side.front entrance in auditorium.remed
May 13, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue#35560933p.miscellaneous violation.unsafe storage of combustible material and equipment per bc3303.4.6 and 27-108.noted observed in room 410 rows of bookshelf,cardboard boxes,paper throughout the room.re
May 13, 2022 · Penalty $1,562
Resolve - Class - 2
Reissued#355609384 failure to maintain building in code-compliant manner.noted:observed at auditorium main lights not work properly.rem:repair and/or replace.
May 13, 2022 · Penalty $1,562
Resolve - Class - 2
Reissued#35560939x failure to maintain building in code-compliant manner.noted:observed at rear level from room has vert crack approx 5'long1/2 wide on back wall.rem:repair and/or replace.
May 13, 2022 · Penalty $1,562
Active - Class - 2
Reissue#35560940n failure to maintain building in code-compliant manner no firestopping per bc 712.3;27-345 noted:observed opening at variour locations in new & old electrical room thru wall open an both side.r
May 13, 2022 · Penalty $3,125
Resolve - Class - 2
Gasket for man hole needs to be replaced,cannot have exposed wires,door missing to room with combustible storage
Jun 3, 2021 · Penalty $625
Resolve - Class - 2
Gasket for man hole needs to be replaced,cannot have exposed wires,door missing to room with combustible storage
Jun 3, 2021 · Penalty $625
Resolve - Class - 2
Exit door not self closing.noted:observed exterior exit door 17,exit 18,exit 9 not self closing at time of inspection. remedy:repair/replace door
May 5, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner no firestopping per bc712.3;27-345 noted:observe opening in various locations in new&old electrical rms,around conduits&ducts going thru walls open on both sides
May 5, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner.noted:observed@time of insp roof level fan rm has vert crack approx5' long 1/2" wide on wall.repair &/or replace.
May 5, 2021 · Penalty $625
Active - Class - 2
Failure to maintain bldg in codecompliant manner noted:observed duringinsp of auditorium main lights were all not operational during time ofinsp.repair &/or replace.
May 5, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner.noted:observed duringinsp of library windows on exp1 (90thst)&exp4(50thave) had spalling plaster&water damage.repair &/or replace.
May 5, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner.noted:observed in attic space above boys gym theres pipe thats consistently leaking water.repair &/or replace.
May 5, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner noted observed@boys gym ceiling in 1sec crumbling&(illegible) to rest on wire mesh gate.repair &/or replace.
May 5, 2021 · Penalty $625
Resolve - Class - 2
28-301.1 unsafe storage of combustible material&equipment.per bc3303.4.6&27-1018.noted observed used snowblower,ride atop garden lawn mower,walk behind lawn mower stored under tarp,inb/w bldg alleyway chained t
May 5, 2021 · Penalty $1,250
Resolve - Class - 2
Unsafe storage of combustible material&equipment per bc3303.4.6&27-1018.noted:observed@mechanical rm410,rows of bookshelfs w/books &/or cardboard boxes on them.excessive storage of paper,books,cardboard thruout
May 5, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner.illumination lightingfor exits,exit dischages&public corridors per bc 1006.1;27-381.noted:observed@time of insp existing emergency lights@b60,b664,exit6;dance st
May 5, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner.noted:observed duringinsp fireproof selfclosing doors@stairl by 1fl,by b59,entrance to cafeteria stairl side,front entrance to auditorium.repair &/or replace.
May 5, 2021 · Penalty $625
Resolve - Class - 2
Reissued35495679k failure to maintain bldg in codecompliant manner.noted:observed during insp of subbsmt (cellar) foundation walls have become porous allowing water to penetrate&collect on fl altho out (1930 bl
May 5, 2021 · Penalty $1,562
Active - Class - 2
Reissue #35495680h failure to maintain bldg in code compliant manner. noted:observed at roof(over boys gym) slate roofing tiles are loose/missing.remedy:repair &/or replace.
May 5, 2021 · Penalty $1,562
Resolve - Class - 2
Reissued 3549580h failure to maintain bldg walls &/or appurtenances. noted:observed during inspection of old oil tank room in sub-basement water penetrated into the room,w/standing water collecting to over 1in
May 5, 2021 · Penalty $3,125
Active - Class - 2
Reissue#35331776l-failure to maintain building in code-compliant manner.missing roof/ceiling tiles @ gym for boys.remedy:repair and/or replace.
May 20, 2020 · Penalty $1,562
Resolve - Class - 2
Reissue#35260591j-failure to maintain buildling in code-compliant manner.there's a tunnel @ cellar level that leaks/floods during rain.remedy:repair and/or replace.
May 20, 2020 · Penalty $1,562
Active