90-52 Corona Avenue
Queens, NY 11373BBL 4-01847-0014Map
Owner of record: Institute Of Chung-Hwa Buddhist Culture, INC.
90-52 Corona Avenue is a religious facility built in 1931 in Queens, 11373. The owner of record is Institute Of Chung-Hwa Buddhist Culture, INC.. HPD has recorded 9 housing violations here, most recently on September 23, 2009. 9 of the 9 most recent violations are still open.
- HPD violations
- 9
- DOB violations
- 17
- ECB violations
- 4
- HPD complaints
- 11
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- CImmediately hazardous
Abate the nuisance consisting of no electric supply in the entire apartment located at apt 3, 3rd story
Sep 23, 2009 · Apt 3
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 3rd story
Sep 23, 2009 · Apt 3
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3fl, 3rd story
Dec 21, 2008 · Apt 3FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3fl, 3rd story
Dec 21, 2008 · Apt 3FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3fl, 3rd story
Dec 21, 2008 · Apt 3FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 3fl, 3rd story
Dec 21, 2008 · Apt 3FL
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3fl, 3rd story
Dec 21, 2008 · Apt 3FL
Open — Nov certified late - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at stair landing from 2nd to 3rd story at public hall
Mar 6, 2007
Open — Nov sent out - ANon-hazardous
Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Mar 6, 2007
Open — Nov sent out
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed
Show 7 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 2
B265 as per class 2 (b265) 28-303.7 failure to complete boiler inspection report as per dob records.
Dec 29, 2016 · Penalty $2,500
Active - Class - 2
Sec 28-201.1 misc viol: unlawful acts: fail to comply w/comm order forecb nov # 34621316j,34637375x. remedy: file certificate of correction.
Feb 19, 2009 · Penalty $4,000
Active - Non-hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families. dept of building records indicates premises to be legally approved for a 2 family (2nd flr & 3rd flr) now pre
Feb 6, 2008 · Penalty $8,750
Active - Hazardous
Residence altered for occupancy as a dwelling for more than the legal ly approved # of families.dob records indicate premises apprvoed for 2families 2nd & 3rd fls.at the 3rd fl level there are 2 sro's sro has d
Dec 5, 2007 · Penalty $5,300
Active
Complaints
- Appliance
Refrigerator
Sep 17, 2009 · Apt 3
Close - Electric
Electric-supply
Sep 17, 2009 · Apt 3
Close - Electric
Electric-supply
Sep 15, 2009 · Apt 3
Close - Heating
Heat related
Dec 14, 2008 · Apt 3FL
Close - Nonconst
Vermin
Jun 24, 2008 · Apt 3FL
Close - Heating
Heat related
Feb 27, 2007 · Apt 3FL
Close - Nonconst
Rubbish
Nov 18, 2006 · Apt 3FL
Close - Nonconst
Rubbish
Nov 18, 2006 · Apt 3FL
Close - Plumbing
Sewer
Jun 22, 2006 · Apt BASEM
Close - Plumbing
Sewer
Jun 22, 2006 · Apt BASEM
Close
Show 1 more ↓
- Plumbing
Sewer
Jun 22, 2006 · Apt BASEM
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Religious facility (M9)
- Year built
- 1931
- Floors
- 3
- Residential units
- —
- Building area
- 5,694 ft²
- Lot area
- 1,876 ft²
- Zoning
- —
- Community board
- 404
- Council district
- 25
- Block / lot
- 1847 / 14
- Assessed value
- $262,350
- Landmark / historic district
- No
Questions about 90-52 Corona Avenue
Who owns 90-52 Corona Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Institute Of Chung-Hwa Buddhist Culture, INC..
Does 90-52 Corona Avenue have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 90-52 Corona Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 90-52 Corona Avenue built?
City records list 1931 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.