86-29 Broadway
Queens, NY 11373BBL 4-01842-7501Map
Owner of record: King Chung Trading Corporation
86-29 Broadway is a condominium built in 1986 in Queens, 11373. It has 100 residential units across 12 floors. The owner of record is King Chung Trading Corporation. HPD has recorded 35 housing violations here, most recently on March 27, 2020. 29 of the 35 most recent violations are still open.
- HPD violations
- 35
- DOB violations
- 77
- ECB violations
- 31
- HPD complaints
- 54
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- CImmediately hazardous
Provide hot water at all hot water fixtures located at apt 12h, 12th story, 2nd apartment from west at north
Mar 27, 2020 · Apt 12H
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 12h, 12th story, 2nd apartment from west at north
Mar 27, 2020 · Apt 12H
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 29, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 29, 2018
Open — Invalid certification - BHazardous
Properly repair the broken or defective door mortise lock in the entire apartment located at apt 12j, 12th story, 1st apartment from west at north
Jan 25, 2018 · Apt 12J
Open — Nov sent out - BHazardous
Repair or replace the smoke detector inoperative located at apt 12j, 12th story, 1st apartment from west at north
Jan 25, 2018 · Apt 12J
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 12j, 12th story, 1st apartment from west at north
Jan 25, 2018 · Apt 12J
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2017
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 4; in the entire apartment located at apt 12j, 12th story, 1st apartment from west at north
May 2, 2017 · Apt 12J
Closed — Violation closed
Show 25 more ↓
- BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 12j, 12th story, 1st apartment from west at north
Oct 13, 2016 · Apt 12J
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 12j, 12th story, 1st apartment from west at north
Oct 13, 2016 · Apt 12J
Open — Not complied with - BHazardous
Properly repair the broken or defective door at north in the 2nd room from east located at apt 12j, 12th story, 1st apartment from west at north
Oct 13, 2016 · Apt 12J
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 12j, 12th story, 1st apartment from west at north
Oct 13, 2016 · Apt 12J
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , north wall in the 2nd room from east located at apt 12j, 12th story, 1st apartment from west at north
Oct 13, 2016 · Apt 12J
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , north wall, south wall, east wall in the bathroom located at apt 12j, 12th story, 1st apartment from west at north
Oct 13, 2016 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the 2nd room from east located at apt 12j, 12th story, 1st apartment from west at north
Oct 13, 2016 · Apt 12J
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended clg installed 1 sty pub hall.
Nov 30, 1989
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of gas meter room used for storage cellar.
Nov 30, 1989
Open — Nov sent out - ANon-hazardous
Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also chain door guard entrance door to 9 sty west apt 9j. located at apt 9j
Nov 30, 1989 · Apt 9J
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors b stairs fire door 3 sty pub hall.
Nov 30, 1989
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors gas & meter room cellar.
Nov 30, 1989
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective walls gas & electric meter room cellar.
Nov 30, 1989
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors fire stair 1 sty pub hall east.
Nov 30, 1989
Open — Nov sent out - ANon-hazardous
D26-20.05 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also missing chain door guard 11 sty apt 11e. located at apt 11e
Aug 26, 1986 · Apt 11E
Open — Nov sent out - ANon-hazardous
D26-20.05 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also missing chain door guard 9 sty apt 9e. located at apt 9e
Aug 26, 1986 · Apt 9E
Open — Nov sent out - ANon-hazardous
D26-10.01 adm code properly repair the broken or defective inoperable intercom system vestibule to 9 sty apt 9h. , section '' ''
Aug 26, 1986 · Apt 9H
Open — Nov sent out - ANon-hazardous
D26-20.05 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also missing chain door guard 8 sty apt 8i. located at apt 8i
Aug 26, 1986 · Apt 8I
Open — Nov sent out - ANon-hazardous
D26-20.05 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also missing chain guard 8 sty apt 8g. located at apt 8g
Aug 26, 1986 · Apt 8G
Open — Nov sent out - ANon-hazardous
D26-10.01 adm code properly repair with similar material the broken or defective crack in concrete floor & wall 8 sty apt 8g patio at handrail. located at apt 8g
Aug 26, 1986 · Apt 8G
Open — Nov sent out - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors entrance to 8 sty apt 8d. located at apt 8d
Aug 26, 1986 · Apt 8D
Open — Nov sent out - BHazardous
D26-16.01 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet 8 sty apt 8d bathroom. located at apt 8d
Aug 26, 1986 · Apt 8D
Open — Nov sent out - ANon-hazardous
D26-20.05 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also chain door guard 8 sty apt 8d. located at apt 8d
Aug 26, 1986 · Apt 8D
Open — Nov sent out - BHazardous
D26-13.03 adm code abate the nuisance consisting of vermin roaches 7 sty apt 7h. located at apt 7h
Aug 26, 1986 · Apt 7H
Open — Nov sent out - CImmediately hazardous
D26-10.01 adm code & 309 m/d law abate the nuisance consisting of double cylinder key operated lock installed at door entrance to 6 sty apt 6f. located at apt 6f
Aug 26, 1986 · Apt 6F
Open — Nov sent out
DOB building violations · 77
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Construction other optional
Borough commissioner has ordered stop work order for job # 420177187 due to general contractor lina de la hoz gc #38518. contact borough commissioner s office.
Sep 21, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Construction other optional
C-construction other optional
Nov 20, 2014
Vp-violation unserved ecb-active - Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2011
Dob violation - resolved - Construction other optional
C-construction other optional
Feb 28, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Construction other optional
C-construction other optional
Aug 12, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 12, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 12, 2008
Dob violation - resolved - Construction other optional
C-construction other optional
Jul 9, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
May 6, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2007
Dob violation - resolved
ECB violations · 31
- Class - 2
Occupancy contrary to that allowed by c of o or dob records; records indicate authorization of a max of 70 parking spaces, observed the parking lot layout has been reconfigured/restriped to accommodate a higher
Aug 25, 2026 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner order to file certificate of correction
Jun 4, 2025 · Penalty $6,250
Active - Class - 2
Failure to comply with commissioner order to file certificate of correction. file a certificate of correction.
Jun 4, 2025 · Penalty $6,250
Active - Class - 2
Slant fin boiler, model# gg375. failureto comply with commissioner order to file certificate of correction. file certificate of correction.
Jun 4, 2025 · Penalty $6,250
Active - Class - 2
Found slantfin model gg-375-hec boiler unregistered. register the boiler and submit a certificate of correction.
Apr 17, 2023 · Penalty $3,125
Active - Class - 2
Found slantfin model gg-375 hec boiler unregistered. register the boiler and submit a certificate of correction.
Apr 17, 2023 · Penalty $3,125
Active - Class - 2
Found slantfin model gg-375 hec boiler unregistered. register the boiler and submit a certificate of correction.
Apr 17, 2023 · Penalty $3,125
Active - Class - 2
B 254-36 found slant finn gg375 gas fired boiler not registered, register the boiler and submit a certificate of correction
Apr 6, 2020
Resolve - Class - 2
B 254-36 found slant finn gg375 gas fired boiler not registered, register the boiler and submit a certificate of correction
Apr 6, 2020
Resolve - Class - 2
B 254-36 found slant finn gg375 gas fired boiler not registered, register the boiler and submit a certificate of correction
Apr 6, 2020
Resolve
Show 21 more ↓
- Class - 2
Failure to file annual certification that cooling tower 1000004178 has been inspected, tested and disinfected and that a maintenance plan has been developed and implemented by november 1, 2016. rem: file annual
Jun 20, 2017
Resolve - Class - 2
Failure to provide approved plan at site at the time of inspection. job #420950153 noted: at front bldg concrete patch repairs existing balcony from scaffold,4 workers at site. work in process. remedy: provide
Nov 20, 2014
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. note: sidewalk shed has been erected at exp #1,2,3. 1. @ exp #1 next to the main entrance to the bldg sidewalk shed supported
Jan 8, 2014
Resolve - Class - 2
Work does not conform to approved construction document for alt ii job#402272134.permit expired on 9/12/06.non conforming plans does not show compressor installed in closet w/ plumbing & electric hook-up.plans
Dec 10, 2010 · Penalty $250
Resolve - Class - 3
Work w.o a permit. noted: installed two sinks (one sink in each room) at cellar level doctor's office w.o a permit. remedy: obtain permit orrestore premises to prior legal condition
Aug 17, 2010 · Penalty $100
Resolve - Class - 3
Work does not conform to approved construction documents/amendments job 401583933/a2 dwg dated 5/14/03. permit expired 3/30/04. noted: cellar exam room # 4 sink not installed as plan shown. cellar medical off
Mar 2, 2010 · Penalty $500
Active - Class - 1
Failure to maintain bldg walls or appurtenances (exterior) noted due to failure to maintain the roof & the strong wind the roof covering including the membrane coping styrofoam insulation were severly damaged
Nov 13, 2009 · Penalty $5,000
Active - Class - 2
Failed to perform final inspection for completed work w/in one year ofpermit expiration application #402073215 expired 12/3/05 associated technical reports not signed off: fire stops (27-345) ventilation system
Nov 26, 2008 · Penalty $4,000
Active - Class - 2
Altered/changed bldg occupied w/o a valid c of o as per 28-118.3.1 & 28-118.3.2. for alt 1 job # 400746751 of which work is complete. this job is to combine atp 2n, & 2o into (1) dental office. found one denta
Nov 26, 2008 · Penalty $500
Active - Class - 1
Work w.o permit for alt 1 job # 400746751, found a stand-up stall shower in this dental office which combines apts 2n & 2o. water & waste linens have been installed. no record of such work filed w/nyc dob no
Nov 26, 2008 · Penalty $1,600
Active - Non-hazardous
Altered bldg premises occupied w/o a valid c of o noted premises (apts 2n and 2-0) within mdr altered via type 1 appl job 4007467851 is in full use and occupancy no c of o tco for this change premises in use as
Mar 20, 2008 · Penalty $2,500
Active - Non-hazardous
Work w/o a permit. work noted: at apt 10i erected wall w/door kitchen & wall w/door living room turning dining are into bedroom. remedy: obtain permit or restore to prior legal condition.
Sep 17, 2007
Resolve - Non-hazardous
Work without a permit. work noted: at 3rd fl apt 3-i erected partitionsubdivide living room + dining room to create a bedroom with entry door and key locking device. remedy- obtain permit or restore to prior le
Sep 6, 2007 · Penalty $2,500
Resolve - Non-hazardous
Oil,16m07,55y13,55y02,74b14,86m05.02x10-alarm bell does not ring whe n button is pressed or when car stop switch engaged.16m07-fascia panel missing between fl 7 & 8.55y13,55y02-hoist machine is leaking oil,sea
Apr 3, 2007 · Penalty $180
Resolve - Non-hazardous
02x10,03dol,55y13,55y02,58#01.02x10-alarm bell does not ring when button is pressed or when in car stop switch is engaged.03d06-car top cab steadying plates are loose.55y13,55y02-hoist machine is leaking oil,se
Apr 3, 2007 · Penalty $180
Resolve - Non-hazardous
50. scant fin modular boiler lp. 50-leaking pressure relief valve on the boiler.
Jul 7, 2005
Resolve - Non-hazardous
50. slant fin modular ci ber lp dom hw,gas. 50-a pressure relief valve mounted on the header is set at 150 psl with the boiler's maximum allowable working pressure being 100 psi. over pressure protection compri
Jul 7, 2005
Resolve - Non-hazardous
02y, 11d
Nov 13, 1999
Resolve - Non-hazardous
35p,07l. 35 unable to gain access to machine room to complete inspect-ion. 07 safety edge.
Oct 26, 1993 · Penalty $1,000
Resolve - Non-hazardous
35p,07l, 35 unable to gain access to machine room to complete inspect-ion. 07 safety edge.
Oct 26, 1993
Resolve - Non-hazardous
Occupancy contrary to bldg dept. records co 202860t change of use fromoffices on 1st and 2nd fls. to renting of apts on fls as sro's withoutkitchens or full bathrooms. remedy:discontinue unlawful use of premise
Dec 4, 1992 · Penalty $350
Active
Complaints
- Unsanitary condition
Pests
Feb 13, 2026 · Apt 11F
Close - Water leak
Heavy flow
Sep 26, 2025 · Apt CN
Close - Unsanitary condition
Mold
Mar 12, 2024 · Apt 12B
Close - Unsanitary condition
Pests
Mar 12, 2024 · Apt 12B
Close - Unsanitary condition
Pests
Mar 12, 2024 · Apt 12B
Close - Unsanitary condition
Pests
Mar 12, 2024 · Apt 12B
Close - Heat/hot water
Entire building
Mar 26, 2020 · Apt 12H
Close - Heat/hot water
Apartment only
Nov 16, 2019 · Apt 10H
Close - Heat/hot water
Entire building
Oct 29, 2019 · Apt 10H
Close - Heat/hot water
Apartment only
Oct 29, 2019 · Apt 10H
Close
Show 40 more ↓
- Water leak
Slow leak
Jul 8, 2019 · Apt 10G
Close - Heat/hot water
Apartment only
Mar 5, 2018 · Apt 12J
Close - Heat/hot water
Apartment only
Jan 26, 2018 · Apt 12J
Close - Door/window
Door
Jan 25, 2018 · Apt 12J
Close - Heat/hot water
Apartment only
Jan 25, 2018 · Apt 12J
Close - Heat/hot water
Apartment only
Dec 4, 2017 · Apt 12J
Close - Heat/hot water
Entire building
Nov 11, 2017 · Apt 5D
Close - Heat/hot water
Entire building
Nov 24, 2016 · Apt 7F
Close - Plumbing
Water supply
Nov 9, 2016 · Apt 4J
Close - Heat/hot water
Apartment only
Nov 7, 2016 · Apt 4J
Close - Heat/hot water
Apartment only
Oct 5, 2016 · Apt 12J
Close - Unsanitary condition
Pests
Oct 5, 2016 · Apt 12J
Close - Paint/plaster
Wall
Oct 5, 2016 · Apt 12J
Close - Paint/plaster
Ceiling
Oct 5, 2016 · Apt 12J
Close - Door/window
Door frame
Oct 5, 2016 · Apt 12J
Close - Safety
Window guard broken/missing
Oct 5, 2016 · Apt 12J
Close - Safety
Smoke detector
Oct 5, 2016 · Apt 12J
Close - Safety
Carbon monoxide detector
Oct 5, 2016 · Apt 12J
Close - Heat/hot water
Apartment only
Jan 6, 2016 · Apt 1F
Close - Heat/hot water
Apartment only
Nov 19, 2014 · Apt 1F
Close - Heating
Heat related
Jan 22, 2014 · Apt NA
Close - Heating
Heat related
Apr 24, 2011 · Apt 2I
Close - Heating
Heat related
Nov 18, 2010 · Apt 12I
Close - Heating
Heat related
Nov 18, 2010 · Apt 12G
Close - Plumbing
Water supply
Oct 21, 2010 · Apt 12G
Close - Heating
Heat related
Apr 18, 2010 · Apt BLDG
Close - Heating
Heat related
Apr 17, 2010 · Apt BLDG
Close - Heating
Heat related
Apr 16, 2010 · Apt BLDG
Close - Heating
Heat related
Feb 22, 2010 · Apt 5A
Close - Heating
Heat related
Jan 3, 2010 · Apt 5A
Close - Nonconst
Vermin
Aug 13, 2009 · Apt 5E
Close - Plumbing
Water supply
Dec 23, 2008 · Apt BLDG
Close - Plumbing
Water supply
Dec 23, 2008 · Apt BLDG
Close - Plumbing
Radiator
Jun 10, 2008 · Apt BLDG
Close - Plumbing
Radiator
Jun 10, 2008 · Apt BLDG
Close - Plumbing
Radiator
Jun 9, 2008 · Apt 3A
Close - Plumbing
Water supply
Aug 25, 2006 · Apt 3C
Close - Heating
Heat related
Jun 20, 2006 · Apt BLDG
Close - Heating
Radiator
Jun 14, 2004 · Apt BLDG
Close - Plumbing
Water supply
Dec 9, 2003 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1986
- Floors
- 12
- Residential units
- 100
- Building area
- 104,985 ft²
- Lot area
- 33,400 ft²
- Zoning
- R6
- Community board
- 404
- Council district
- 25
- Block / lot
- 1842 / 7501
- Assessed value
- $7,863,325
- Landmark / historic district
- No
HPD registration #422792, last renewed Sep 11, 2025.
Questions about 86-29 Broadway
Who owns 86-29 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is King Chung Trading Corporation.
Does 86-29 Broadway have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 86-29 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 86-29 Broadway built?
City records list 1986 as the year it was built.
How many apartments are in 86-29 Broadway?
It has 100 residential units and 169 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.