Violations at 47-11 90 Street
Queens, NY 11373 · BBL 4-01586-0010 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
The newest 50 of 63 DOB violations. The city keeps the complete history.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 8, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 6, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 2, 2009
Dob violation - dismissed - Construction other optional
Failure to safeguard public and property affected by construction oper ations 410093615 currently interior perimeters at corona ave row build ing interior perimeters at rear of row stores on 91 ave also paralell w/rail road 90-13 store front structure rear 47-07 90 st all points vo id of adequate fence compliant with this code remedy: stop all work ex
May 27, 2008
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations
28 ECB violations, newest first.
- Class - 1
Failure to maintain bldg lot in safe condition 28-301.1, respondent previously issued summons 39183435r & has failed to make any corrections & comply w/ code, excessive accumulation of combustible vehicle tires
Aug 4, 2026 · Penalty $6,280
Active - Class - 2
Occupancy contrary to dept. records respondent previously issued summons 39183434p & has failed to make any corrections (discontinue illegal use or amend c/o) & comply w/ code. lot still being used as an illega
Aug 4, 2026 · Penalty $3,155
Active - Class - 2
Illegal use in a residential district respondent previously issued summons 39183436z & has failed to make any corrections still using lot illegally as a tow yard with several vehicles stored/parked, some damage
Aug 4, 2026 · Penalty $3,155
Active - Class - 1
Building/open lot occupied w/out valid certificate of occupancy, vacant lot illegally used as tow yard several vehicles parked/stored entire lot filled some damaged, job#420335818 filed by respondents disapprov
May 1, 2026 · Penalty $2,530
Active - Class - 2
Illegal use in a residential district observed multiple vehicles was able to count 36 however more vehicles on lot commercial & regular cars parked/stored on lot filling up entire property with no plates or reg
Apr 6, 2026 · Penalty $1,280
Active - Class - 1
Failure to maintain building lot in safe condition observed an excessive accumulation of vehicle tires at property lot stored in front a combustible wooden shed with cars parts in them. creating a fire, health
Apr 6, 2026 · Penalty $2,530
Active - Class - 2
Occupancy contrary to that allow by c/o & building dept. records property classified as a garage/gas station that no longer exist now being illegally used as a parking/storage lot for multiple cars & commercial
Apr 6, 2026 · Penalty $1,280
Active - Class - 1
Work w/o a permit. noted at entire premises: 4 story building erected., obtain permit
Nov 19, 2025
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection for new bldg appl #s 1- 420174885 2- 420174803. 3- 420174876. 4- 420174849. 5- 420174821. 6- 420174812. 7- 420174867. 8- 420174894.
Apr 10, 2012
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order.noted:ecb#34826568p issued for work w/o permit on 11/15/11.on 11/30/11 partial rescind granted to only backfill & install whalers & rackers @ exp#1(c
Feb 14, 2012 · Penalty $24,000
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.note:ecb#34826567n issued work w/o a permit on 11/15/11 on 11/30/11 partial rescind granted to only back fill & install whalers & rackers @ exp#1(c
Feb 14, 2012 · Penalty $24,000
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order.noted:ecb#34826573j issued for work w/o permit on 11/15/11.on 11/30/11 partial rescind granted to only backfill & install whalers & rackers @ exp#1(c
Feb 14, 2012 · Penalty $4,800
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.noted:ecb#34826572h issued for work w/o a permit on 11/15/11.on 11/30/11 partial rescind granted to only backfill & install whalers & rackers @ exp
Feb 14, 2012 · Penalty $4,800
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order.noted:ecb#34826571x was issued for work w/o a permit on 11/15/11.on 11/30/11 partial rescind granted to only backfill & install whalers & rackers @ e
Feb 14, 2012 · Penalty $4,800
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order.noted:ecb#34826570y issued for work w/o permit on 11/15/11.on 11/30/11 partial rescind granted to only backfill & install whalers & rackers @ exp#1(c
Feb 14, 2012 · Penalty $4,800
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.noted:ecb#34826569r issued for work w/o permit on 11/15/11.on 11/30/11 partial rescind granted to only backfill & install whalers & rackers @ exp#1
Feb 14, 2012 · Penalty $4,800
Resolve - Class - 2
Sec. 28-116.2.3. failure to provide an adequate inspection program. asnoted: at time of inspection at an active construction site concrete placement @ cellar level for footer's 4,000 psi approx 150 yds,failure
Nov 15, 2011 · Penalty $400
Resolve - Class - 2
Sec. 28-116.2.3. failure to provide an adequate inspection program. asnoted: at time of inspection at an active construction site, concrete placement @ cellar level for footer's,4,000 psi approx 150 yds,failure
Nov 15, 2011 · Penalty $400
Resolve - Class - 2
Sec. 28-116.2.3. failure to provide an adequate inspection program. asnoted: at time of inspection at an active construction site concrete placement @ cellar level for footer's 4,000 psi approx 150 yds,failure
Nov 15, 2011 · Penalty $400
Resolve - Class - 2
Sec. 3307.6.5;27-1021 failure to maintain proper sidewalk shed illumination. noted no lights installed on shed. remedy: provide proper illumination.
May 19, 2011 · Penalty $400
Resolve - Class - 2
Failure to comply w/ the comm's order to file a cert of correction w/ the dob.noted:respondent failed to comply w/ the comm's order to correct the violating conditions & file a cert of correction pursuant to 28
Nov 4, 2010 · Penalty $800
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction site w/ fence under permit #442014555 exp 1/26/11 observed at exp2 on 90st rear section a 4'wide x 8'high opening in the construction fence
Nov 4, 2010
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionsite w/ fence under permit #420124555 exp 1/26/11 observed at exp2 on 90st rear section a 4'wide x 8'high opening in the construction fence
Jan 4, 2010 · Penalty $6,000
Resolve - Class - 2
Fail to maintain adequate housekeeping per section requirements noted:broken pipe flooding excavation site to excessive water level.no waterremoval equipment & no drainage provided @ site @ time of insp.rem:mai
Dec 23, 2009
Resolve - Class - 3
Wrk w/o permit noted:8ft high construction fence installed @ perimeterof construction site @ the time of insp no permit fence @ site.rem:obtain const fence permit & post @ site
Dec 23, 2009
Resolve - Class - 2
Sidewalk shed does not meet code spec. note: sidewalk shed installed w/o operational lighting as required by code-system (not connected) remedy: conform to shed code spec.
Sep 16, 2008 · Penalty $10,000
Resolve - Non-hazardous
Having installed an awning without a permit. remedy: remove illegal work awning.
Apr 11, 2003
Resolve - Non-hazardous
73x 73 repaair elev and restored to service for dob to make proepr inspection
Aug 27, 1999
Resolve